29 April 2026
QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 31
MARCH 2026
HIGHLIGHTS
• Scoping Studies confirmed a robust, standalone gold development opportunity for the Black Swan
Gold Project Processing Hub (BSPH) near Kalgoorlie, Western Australia1:
o Development plan supports a 2.2Mtpa processing hub delivering average annual gold
production of approximately 102koz over an initial ~5-year mine life
o Total mine production of approximately 10.9Mt @ 1.65 g/t Au for 536koz recovered gold based
on a mine of plan consisting of ~74% Measured and Indicated Resources underpinned by a
strong 1.88Moz Resource base
o Strong project economics of $631M pre-tax NPV8, $959M pre-tax free cash flow, 83% IRR,
and an ~18-month payback period (A$5,500/oz gold price assumption)
o Capital-efficient development with pre-production capex of ~$160.5M, leveraging existing
Black Swan plant and infrastructure
o Early works approved and are underway, including FEED, long-lead procurement, and
infrastructure planning, supporting a clear pathway to completion
o First gold production targeted for mid-2027, construction expected to commence mid-2026
o Further upside potential from ongoing drilling, resource conversion, and potential throughput
optimisation above the PFS 2.2Mtpa capacity
• Assay results from Burbanks Phase 1 drilling confirmed multiple high-grade gold intercepts, including
exceptional grades of up to 396.62g/t Au over 1.16m and 235.70g/t Au over 2.00m2
• Gold Mineral Resources and Reserves update:
o Gold Mineral Resources of 34.32Mt at 1.7 g/t Au for 1.88Moz gold3
o Gold Ore Reserves of 4.3Mt at 1.54 g/t for 214 koz gold, a 160% increase in contained gold
to the FY2025 Ore Reserve4
• Ore Purchase Agreement terminated with Paddington, enabling strategic flexibility
• 460kt (14.2koz Au) of ore stockpiles at Boorara to de-risk Black Swan Mill start up
• Sucessful two tranche, $175M Capital Raising completed to fund the development of the BSPH,
supported by Share Purchase Plan raising $4.65M
• Divestment of Lake Johnston completed for a total consideration of $35M, comprising $30M cash and
$5M in Forrestania Resources Limited Shares
• End of quarter cash position of $120.6M. Tranche 2 of capital raise of $118M before costs received
post quarter end, cash position as at 28 April 2026 of $233.5M
• Name changed from Horizon Minerals to Maritana Minerals post end of the quarter to reduce confusion
with other ASX listed companies with similar names
• Maritana Minerals Limited joins the S&P Dow Jones All Ordinaries Index
• Key Appointments:
o Project Director – Doug Flanagan
o Company Secretary – Isabel Macchia
o Chief Financial Officer and Joint Company Secretary – Brendan Shalders
1
Refer to Cautionary Statement on page 11 and ASX Announcement 17 February 2026 “Studies Support Standalone
Development in WA Goldfields”.
2
Refer to ASX Announcement 28 January 2026 “Continued High-Grade Success from Burbanks Phase 1 Drilling”
3
Refer to ASX Announcement 13 February 2026 “Gold Mineral Resources Update”
4
Refer to ASX Announcement 17 February “Gold Ore Reserve Update”
maritanaminerals.com.au Page | 2
QUARTERLY REPORT MARCH 2026
Overview
Maritana Minerals Limited, (ASX: MRT) (“Maritana” or the “Company”) is pleased to report on its activities for
the quarter ended 31 March 2026.
Maritana’s key objective is near term gold production through the proposed Black Swan Processing Hub
(BSPH) and exploration upside within our large tenement package of 1,167km2, located within the Kalgoorlie
and Coolgardie regions of Western Australia (Figure 1). The Company holds 1.88Moz of gold resources and
a number of multi-commodity assets including the 20.2Moz Ag Nimbus silver-zinc project.
Figure 1 – Maritana’s project locations, regional geology and surrounding infrastructure
During the quarter, activities were primarily directed toward progressing the BSPH as the Company’s
cornerstone development asset. Scoping Studies confirmed a robust standalone gold development
opportunity, supported by strong production targets, favourable project economics, and a capital-efficient
development plan leveraging existing infrastructure1. Early works are underway, with construction targeted for
mid-2026 and first production expected by mid-2027. Resource growth activities at Burbanks continued
through infill and extensional drilling, delivering multiple high-grade gold intercepts and supporting increased
resource and future mill feed confidence. Mineral Resources and Ore Reserves were also strengthened,
including a significant uplift in Ore Reserves4.
In parallel, the Company reinforced its financial position through a successful two tranche, $175M capital
raising and completed the divestment of Lake Johnston. Maritana ended the quarter with a cash balance of
$120.6M which including the $118M before costs from the second tranche of the capital raising received after
maritanaminerals.com.au Page | 3
QUARTERLY REPORT MARCH 2026
the end of the quarter, has increased the cash position as at 28 April 2026 to $233.5M. Maritana was included
in the S&P/ASX All Ordinaries Index and has further strengthened its leadership team through several key
executive appointments.
Black Swan Project Update
The Black Swan Plant and Mine Planning Scoping Studies delivered during the quarter support a 2.2Mtpa
integrated processing hub fed by multiple open pit and underground operations, delivering an estimated initial
5-year mine life with total production of approximately 10.9Mt @ 1.65 g/t for 536koz recovered gold and
average annual production of ~102koz. The mine plan comprises of ~74% Measured and Indicated Resources,
with first ore targeted for mid-2027. Pre-production capital is estimated at $160.5M, including plant
refurbishment, infrastructure and mine development costs, with project economics at A$5,500/oz gold price
demonstrating robust returns including $959M pre-tax free cash flow, $631M NPV8 and 83% IRR, with an 18-
month payback from commissioning1. The study highlights low capital intensity through repurposing the
existing Black Swan infrastructure and confirms significant upside potential from ongoing drilling, resource
conversion and throughput optimisation. Construction is targeted to commence mid-2026 with first gold
production expected mid-2027.
Following the release of the Scoping Studies, the Company also announced the early placement of orders for
key long-lead items to support the conversion of the BSPH into a gold processing facility. Items ordered include
a pre-leach thickener and SAG and ball mill motors with variable speed drives, designed to improve circuit
performance, reliability and potential throughput. These early commitments were made ahead of finalisation
of the full EPC contract to maintain project delivery timelines and reduce schedule risk. Front End Engineering
Design (FEED) studies are underway and expected to be completed in June 2026 quarter, with the project
progressing toward its planned 2.2Mtpa gold processing capability at the Black Swan site.
During the period the Company also announced the appointment of Mr Doug Flanagan as Project Director. Mr
Flanagan is a qualified Mechatronic Engineer with more than 26 years’ global experience across the resources,
mining and infrastructure sectors, having delivered complex processing plant projects across the full project
lifecycle, including concept, feasibility, execution, construction and commissioning of major greenfield and
brownfield developments. He has held senior leadership roles including Chief Operating Officer at Element 25
Limited and CEO – High Purity Metals Division at King River Resources Limited, where he led the high-purity
alumina project. His appointment will drive the delivery of the Black Swan Processing Hub, with his expertise
in project management, contractor oversight, cost control and execution expected to strengthen the Company’s
development capability.
Mining and Infrastructure Studies
During the quarter the company reported the Mine Planning Scoping studies and Ore Reserve estimates for
the five year life of mine feed.
Additional studies planned for the June 2026 quarter include:
• Power: Engineering studies with Resources WA have commenced and include planning for genset
and mains power requirements across all planned mine sites.
• Roads: Planning and design for required upgrades are underway.
• Water: Planning and design for longer term dewatering and pumping is underway for near term LOM
minesites.
• Environmental: Permits and approvals for mining are well progressed for required timing of initial
development and production at near term mine sites.
Drilling continues at the flagship Burbanks project to update the Mineral Resource and subsequent Ore
Reserve. Studies continue geotechnical, environmental and hydrological aspects of the deposit. The LOM has
been further optimised as more detailed information comes to hand.
maritanaminerals.com.au Page | 4
QUARTERLY REPORT MARCH 2026
Mine Development and Operations
The Company is currently preparing for the next phase in mining through the preparation of key sites.
Preparatory works include:
• Preparation for further resource definition drilling.
• Mining Studies to prepare for execution of key underground and open pits in the life of mine plan.
• Geotechnical assessments and recommendations for underground and open pit production
requirements.
• Detailed surveys and site plans.
• Tender preparation.
Boorara Gold Project
The Boorara Gold Project is located 15km east of Kalgoorlie-Boulder (Figure 1) adjacent to the Super Pit, and
1km southwest of the Nimbus Silver-Zinc Project site where established offices are connected to mains power
and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with bounding shear
zones and late-stage cross faults. Mineralisation occurs as northwest dipping sheeted and stockwork quartz-
carbonate vein arrays within the quartz dolerite host rocks, and steeply dipping zones along sheared geological
contacts trending to the north-northwest.
Mining at the Boorara Gold Project was completed in December 2025, marking the end of the current
production phase. During the quarter, Maritana mutually terminated its Ore Purchase Agreement with
Paddington Gold Mine.
Substantial ore stockpiles of approximately 460,000 tonnes (14.2koz Au) remain on site and will form the
primary feed source for commissioning of the Black Swan Processing Hub, scheduled for mid-2027. The
utilisation of these stockpiles is expected to de-risk mill start-up, ensuring a consistent and reliable ore supply
during commissioning.
Pre-production planning and operational readiness activities have commenced at Boorara to support a
seamless restart of mining operations in early 2027. In parallel, the Company has progressed procurement of
long-lead items to support the gold conversion of the Black Swan Processing Hub, maintaining development
timelines.
Boorara remains a key component of Maritana’s broader development strategy, underpinning early-stage
processing requirements and supporting the transition to sustained production.
Boorara has been placed under care and maintenance in preparation for the next phase of mining. Site layout
planning is underway for the next phase of works including grade control drilling.
maritanaminerals.com.au Page | 5
QUARTERLY REPORT MARCH 2026
Table 1 – Quarterly Production Data
Jul - Sep 25 Oct - Dec 25 Jan - Mar 26
BOORARA GOLD PROJECT UoM Qtr. 1 Qtr. 2 Qtr. 3 FY26 YTD
Mining & Haulage
Mined
Ore Mined tonnes 268,728 207,678 - 476,406
Mined Grade [est.] gr/t 1.027 1.139 - 1.076
Gold Mined oz 8,874 7,602 - 16,476
Hauled
Ore Hauled tonnes 232,696 124,622 10,926 368,244
Hauled Grade [est.] gr/t 0.94 1.101 1.058 0.997
Gold Hauled oz 7,028 4,410 372 11,810
Processing & Revenue
Milled
Ore Milled tonnes 238,096 120,451 19,786 378,333
Milled Grade gr/t 1.057 1.090 1.198 1.075
Average Recovery % 90.9% 91.9% 90.1% 90.9%
Gold Produced oz 7,349 3,873 687 11,909
Sales
Gold Invoiced oz 6,549 3,689 588 10,826
Average Price A$/oz 5,472 6,322 6,910 5,838
Revenue $AM 35.8 23.3 4.1 63.2
Phillips Find Project
The project is centred 45km north-northwest of Coolgardie (Figure 1) covering over 10km strike of prospective
greenstone stratigraphy, and includes the Phillips Find Mining Centre (PFMC) where approximately 33,000oz
of gold was produced between 1998 and 2015 from three open-pit operations; Bacchus Gift, Newhaven and
Newminster.
During the quarter, a further $10M of JV distributions have been made to the Company. Processing of high-
grade ore at a nearby third-party mill totalled 127,043 tonnes at 2.31 g/t Au for 9,141 ounces produced at an
excellent metallurgical recovery of 96.9%. Another campaign of lower grade ore at Focus Minerals’ Three Mile
Hill mill totalled 26,927 tonnes at 1.13 g/t Au for 879 ounces produced at a recovery of 89.8%.
With the completion of mining and all five toll treatment campaigns, the Phillips Find project has processed
225,988 tonnes at 2.02 g/t Au for 14,095 ounces of high-grade ore.
A parcel of lower grade material of approximately 30,000 tonnes at 0.8 g/t Au has also been treated this quarter
which has not yet been reconciled. Once the final lower-grade reconciliation is received, all gold has been
sold and final project costs reconciliations are completed, the final cash distribution to the Company from the
JV is expected in the June 2026 quarter.
maritanaminerals.com.au Page | 6
QUARTERLY REPORT MARCH 2026
Also during the quarter, rehabilitation and closure of the site have been undertaken to prepare the site for care
and maintenance.
Figure 2 – Rehabilitation at Phillips Find
Exploration and Evaluation
Burbanks
During the quarter, the Company reported continued strong results from its Phase 1 diamond drilling program
at the 100% owned Burbanks Gold Project, with approximately 95% of the 15,000m program completed at the
end of the quarter. Assay results confirmed multiple high-grade gold intercepts, including exceptional grades
of up to 396.62g/t Au over 1.16m and 235.70g/t Au over 2.00m, reinforcing the high-grade nature and continuity
of mineralisation across the project2 (Figure 3). The drilling program also intersected coarse visible gold and
further defined multiple mineralised zones between the Main Lode and Burbanks North areas. In addition, two
metallurgical drill holes were completed to support mine feed planning for the Black Swan Processing Hub,
with testwork underway. The results continue to support the Company’s strategy to grow high-grade feed
sources for its 100% owned Black Swan processing facility.
Burbanks drilling results released during the quarter continue to demonstrate exceptional high-grade gold and
further enhance confidence in the continuity and extension of mineralisation. Significant intercepts for the
period include2:
maritanaminerals.com.au Page | 7
QUARTERLY REPORT MARCH 2026
• 2.00m @ 235.70g/t Au from 248.31m, including 1.16m @ 396.62g/t Au from 248.31m and 5.08m @
2.13g/t Au from 258.10m (25HBBD026);
• 0.32m @ 5.14g/t Au from 342.12m (25HBBD023);
• 0.52m @ 5.25g/t Au from 302.34 (25HBBD024);
• 2.00m @ 3.16g/t Au from 224.00m, including 0.70m @ 7.64g/t Au from 224m (25HBBD025);
• 1.00m @ 6.29g/t Au from 167.00m (25HBBD031);
• 4.50m @ 2.55g/t Au from 287.50, 1.57m @ 9.15g/t Au from 295.52 including 0.27m @ 23.97g/t Au
(25HBBD032);
• 2.00m @ 2.59g/t Au from 220.00, 3.09m @ 2.16 g/t Au from 229.70 including 0.56m @ 7.63g/t Au
from 230.33m and 3m @ 2.07g/t Au from 267.00m and 1.00m @ 6.24g/t Au from 381.00m
(25HBBD033); and
• 0.37m @ 6.79g/t Au from 354.19m (25HBBD034)
Completion of the first Phase of drilling at Burbanks will enable the completion of an updated Mineral Resource
Estimate in the June 2026 quarter. Ore Reserve studies based on the anticipated improved confidence in the
Resource classification from Inferred to Indicated will then follow. Phase 2 extensional drilling program aimed
at growing the resource base at Burbanks is planned to follow Phase 1, commencing within the June quarter.
Figure 3 – SW NE schematic long section on local grid showing the location of drilling in the 2025
drill program at Burbanks, the current MRE categories, historical pierce points and recent drill
traces with pierce points >1.0g/t. Previously reported intersections from this program are
highlighted in white boxes, current intersections are in yellow
Mineral Resource Update
During the quarter, the Company announced an updated Mineral Resource Estimate3 for its 100% owned Gold
Assets, comprising 34.32Mt at 1.7 g/t Au for 1.88Moz of gold. The updated resource is underpinned by the
Company’s key cornerstone assets, Boorara and Burbanks, and reflects mining depletion at Boorara and
Phillips Find, as well as a technical review of economic cut-off assumptions across several deposits. The
increase in contained ounces reflects the impact of stronger gold prices and a revised economic envelope,
maritanaminerals.com.au Page | 8
QUARTERLY REPORT MARCH 2026
which has brought additional material into the resource base. The expanded Mineral Resource inventory will
be incorporated into ongoing studies supporting the planned development of the Black Swan Processing Hub.
Gold Ore Reserve Update
During the quarter, the Company announced an updated Gold Ore Reserve Estimate4 for its Kalgoorlie-
Boulder projects, reporting total Ore Reserves of 4.3Mt at 1.54 g/t for 214koz of gold. This represents a 160%
increase (131,615oz) in contained gold compared to the FY2025 Ore Reserve. The update follows completion
of Pre-Feasibility Studies and re-optimisation work for the Boorara, Crake and Kalpini open pit deposits,
undertaken by Mining Plus Pty Ltd using a gold price assumption of A$4,500/oz, which demonstrated positive
project economics (excluding Black Swan Processing Hub capital). Maiden Ore Reserves were also declared
for the Crake and Kalpini deposits. All future ore is planned to be processed through the proposed Black Swan
Processing Hub (2.2Mtpa), with additional resource-to-reserve conversions expected over the next 12 months
as part of the broader project pipeline, supporting the Company’s objective of establishing a sustained
production base and long-term cashflow generation.
Environmental, Social and Governance
The Company acknowledges the importance of Environment, Social and Governance (ESG) factors and is
committed to continuous improvement in this regard.
The Company has implemented a new Environmental monitoring platform and also engaged the services of
consultants to assist in the development of the systems and processes to facilitate the initiation of project
construction and operational mining. The Company undertook key activities, including the selection of a new
Occupational Health and Safety platform and a review of the company procedures, to support its readiness for
the next phase of operations.
Acquisitions and Divestments
During the quarter, Maritana completed the divestment of its 100% owned Lake Johnston Project, a non-core
nickel asset in Western Australia to Forrestania Resources Limited (ASX:FRS), for a total consideration of
$35M comprising $30M in cash and $5M in FRS shares at a deemed issue price of $0.175 per share.
Corporate/Finance
During the quarter the Company announced it had received commitments from tier one institutional, high net
worth investors and existing shareholders to raise $175M of new equity (before costs) via a two-tranche
placement of 162M new fully paid shares in the Company (New Shares) at an issue price of $1.08 per New
Share (subject to shareholder approval). Tranche 1 shares were issued pursuant to the Company’s placement
capacity under Listing Rule 7.1 and 7.1A and tranche 2 shares were issued post the end of the quarter,
following approval by shareholders.
The Company also completed a Share Purchase Plan (SPP), offering eligible shareholders the opportunity to
subscribe for up to $30,000 of shares at $1.08 per share, free of brokerage and transaction costs. The SPP
raised approximately $4.65M. Shareholder approval for the issue of any SPP shortfall shares was obtained
at the Extraordinary General Meeting (EGM). As at the date of this report, no shortfall shares have been issued,
with the Company having three months from the date of the EGM to place any shortfall.
All resolutions at the EGM held subsequent to quarter end were passed by an overwhelming majority, including
approval of the Company’s name change from Horizon Minerals Limited to Maritana Minerals Limited and the
completion of the capital raising, marking the beginning of a new era for the Company.
maritanaminerals.com.au Page | 9
QUARTERLY REPORT MARCH 2026
During the quarter the Company divested roughly half of its FRS shareholding selling at $0.435 per share and
generating proceeds of $6.2M before transaction costs.
Total cash at bank as at 31 March 2026 was $120.6M. Post the end of the quarter the Company received an
additional $118M (before costs) from the allocation of Tranche 2 shares marking the conclusion of the capital
raising. Cash position as at 28 April 2026 is $233.5M. In addition, the Company holds investments in ASX
listed companies with a current value of approximately $10.3M (Table 3).
In accordance with ASX Listing Rule 5.3.5, approximately $175,000 was paid to related parties or their
associates during the quarter, comprising Director fees and statutory superannuation.
During the quarter the Company announced the appointment of Ms Isabel Macchia as Company Secretary
and Mr Brendan Shalders who is also the CFO, as Joint Company Secretary.
During the quarter, Maritana Minerals was included in the S&P Dow Jones All Ordinaries Index, representing
a significant milestone for the Company and reflecting its increased market capitalisation and liquidity. The
inclusion is expected to enhance the Company’s visibility and profile within the Australian equity market and
broaden its shareholder base through increased participation from institutional and index-tracking investors.
The Company’s capital structure post completion of the capital raising is set out in Table 2.
Table 2 – Capital Structure at 16 April 2026
ASX Code Class of Securities On issue 16 April 2026
MRT Fully Paid Ordinary Shares 371,849,684
MRTAN Performance Rights 3,276,584
MRTAO Unlisted Options Expiring 03 Sep 2026 Exercisable at $0.7785 1,131,957
MRTAA Unlisted Options Expiring 30 Sep 2028 Exercisable at $1.80 400,002
Table 3 – Listed Company Investments
Company Number Value 31 March 2026
Forrestania Resources Limited 14,271,429 1
$7,207,072
Richmond Vanadium Technology 19,833,363 1
$2,875,838
Metal Hawk Limited 1,134,430 1
$97,561
Dundas Minerals Limited 3,234,327 1
$148,779
TOTAL $10,329,250
1
Liquid asset
maritanaminerals.com.au Page | 10
QUARTERLY REPORT MARCH 2026
Authorised for release by the Board of Directors.
For further information, please contact:
Grant Haywood Michael Vaughan
Managing Director and CEO Investor and Media Relations – Fivemark
grant.haywood@Maritanaminerals.com.au michael.vaughan@fivemark.com.au
+61 8 9386 9534 +61 422 602 720
maritanaminerals.com.au Page | 11
QUARTERLY REPORT MARCH 2026
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements. They
include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward
looking statements include, but are not limited to, statements preceded by words such as “planned”,
“expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”,
“nominal”, “conceptual” and similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
as are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be relied on as a
guarantee of future performance. Forward looking statements may be affected by a range of variables that
could cause actual results to differ from estimated results and may cause the Company’s actual performance
and financial results in future periods to materially differ from any projections of future performance or results
expressed or implied by such forward looking statements. These risks and uncertainties include but are not
limited to liabilities inherent in mine development and production, geological, mining and processing technical
problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals required
in connection with mining and third party processing operations, competition for among other things, capital,
acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of
acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various
events which could disrupt operations and/or the transportation of mineral products, including labour stoppages
and severe weather conditions, the demand for and availability of transportation services, the ability to secure
adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current ASX Listing
Rules.
The Company believes that it has a reasonable basis for making the forward-looking statements in the
announcement, including with respect to any production targets and financial estimates, based on the
information contained in this and previous ASX announcements.
Cautionary statement
Statements in this report relating to the Scoping Studies were originally released to the ASX on 17 February
2026 and are preliminary in nature. The Scoping Studies include Indicated and Inferred Mineral Resources
and are based on low-level technical and economic assessments, which are insufficient to support estimation
of Ore Reserves. There is no certainty that the study outcomes, including production targets and financial
assumptions, will be realised. All material assumptions and technical parameters underpinning the Scoping
Study production targets and financial information continue to apply and have not materially changed since
that announcement.
Aspirational Statement
The Company’s vision to be a ~100kozpa producer are aspirational statements (and not production targets)
and the Company does not have reasonable grounds to believe this can be achieved. These statements are
of an aspiration nature as the vision to be a ~100kozpa producer is dependent on several factors including the
exploration success, ore reserves and mineral resources definition, feasibility studies and development of an
extended mine plan.
maritanaminerals.com.au Page | 12
QUARTERLY REPORT MARCH 2026
APPENDICES
ASX ANNOUNCEMENTS
Table 4 – ASX Announcements
March 2026
30th Change in substantial holding
25th Application for quotation of securities - MRT
18th Application for quotation of securities - MRT
17th Results of Share Purchase Plan
16th Key Project Team Appointment
13th Half Year Accounts
13th Boorara Mined Ore Stockpiles Support Ramp up of Black Swan
10th Update - S&P DJI March 2026 Rebalance of the All Ordinaries
10th Investor Presentation - Mining News Select Sydney 2026
10th Gold Mining, Processing and Cash Update
6th S&P DJI Announces March 2026 Quarterly Rebalance
6th Long lead items ordered to fast-track development of BSPH
5th Application for quotation of securities - MRT
February 2026
27th Notice of Meeting, Proxy Form and Letter to Shareholders
26th Invitation Letter to Participate in the Share Purchase Plan
26th Share Purchase Plan
25th Cleansing Notice
25th Application for quotation of securities - MRT
20th Application for quotation of securities - MRT
19th Successful A$175M Capital Raising
18th Investor Webinar
18th Proposed issue of securities - MRT
17th Studies Support Standalone Gold Development in WA Goldfields
17th Gold Ore Reserve Update
17th Equity Raise Presentation
17th Launch of A$175M underwritten placement
17th Trading Halt
13th Lake Johnston Divestment for $35M Completed
13th FRS: Lake Johnston Processing Infra. Acquisition Completes
13th Gold Mineral Resources Update
12th Notification regarding unquoted securities - MRT
11th Application for quotation of securities - MRT
4th Notification of cessation of securities - MRT
4th Application for quotation of securities - MRT
2nd Appointment of Company Secretary and Joint Company Secretary
maritanaminerals.com.au Page | 13
QUARTERLY REPORT MARCH 2026
January 2026
30th Quarterly Cash Flow Report 31 December 2025
30th Quarterly Activities Report 31 December 2025
28th Application for quotation of securities - MRT
28th Continued High-Grade Success from Burbanks Phase 1 Drilling
20th Employee Securities Incentive
20th Notification regarding unquoted securities - MRT
16th Application for quotation of securities - MRT
maritanaminerals.com.au Page | 14
QUARTERLY REPORT MARCH 2026
TENEMENT SCHEDULE
Table 5 – Tenement Schedule, Interests in Mining Tenements in Western Australia
Prospect/Tenement Notes Percentage interest held
at the end of the quarter
Percentage interest
acquired during the
quarter
Percentage interest
disposed during t