Quarterly Activities Report 30 September 2023
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
30 OCTOBER 2023
QUARTERLY ACTIVITIES REPORT FOR THE
PERIOD ENDED 30 SEPTEMBER 2023
HIGHLIGHTS
•
Horizon aims to become a gold producer from a sequence of mining projects under a
contract / JV model 1
•
The fully permitted and funded Cannon underground gold mine is proposed to be the first
project developed, with the Cannon Feasibility Study showing positive economics. 2
Significant milestones for Cannon achieved during the quarter included:
o
the potential JV partner completing technical and commercial due diligence and
both parties advancing a commercial JV agreement
o
further rework of the mine plan and extraction sequence to de-risk the project
•
Resource development drilling continued at Penny’s Find, Pinner and Monument
(Cannon), Kestrel and Honeyeater (Binduli), with new discovery drilling undertaken at
Martin’s (Greater Boorara project area) and further reconnaissance at Lakewood
•
Maiden Mineral Resource Estimates (MRE) were released for: 3
•
o
Monument – 395,000t at 1.97g/t Au for 25,000oz at a 0.8g/t Au cut-off grade
o
Golden Ridge North – 1.42Mt grading 1.23g/t Au for 57,000oz at a 0.8g/t Au cutoff
grade
Horizon’s total Mineral Resource Estimate (MRE) stands at:
o
•
•
23.22Mt grading 1.69g/t Au for 1,262,000oz ounces at various cut-off grades 3
Review of the company’s extensive asset portfolio continued aiming to monetise non-core
assets and reduce overheads. Option agreements have been entered into with:
o
Metal Hawk Limited for the potential divestment of the Yarmany West project for
$400,000 in cash and shares 4, and
o
Dundas Minerals Limited for the potential divestment of the Baden Powell and
Windanya projects for $500,000 in cash and shares 5
Cash at bank of A$4.8 million and listed investments totalling A$7.8 million
DECEMBER QUARTER ACTIVITIES 1
•
Commence pre-production activities for the high-grade Cannon underground mine
•
Release of resource updates for Penny’s Find and Monument
•
Release Exploration and Infill program results
1
See Forward Looking and Cautionary Statements on Page 34.2 As announced to the ASX on 29 March 2022, see also Tables and
confirmations on Page 32. 3 As announced to the ASX on 19 July 2023, see also Tables and confirmations on Page 32. 4 As announced
to the ASX on 5 July 2023. 5 As announced to the ASX on 30 August 2023.
163 Stirling Hwy
Nedlands WA 6009
PO Box 1104
Nedlands WA 6909
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
OVERVIEW
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to provide the
September 2023 Quarterly Activities Report. Horizon is an exploration and production company
within the Kalgoorlie and Coolgardie regions of Western Australia (Figure 1).
A key focus for the Company is on near term production and exploration upside within our
1,100km2 tenement package. The company has utilised multiple drill rigs as part of new discovery
and project generation exploration programs. The company holds numerous multi - commodity
assets including the Silver Zinc Nimbus project in Western Australia and listed investments in the
world class 1.8Bt Richmond vanadium project in northwest Queensland (Figure 13). 1
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Activities during the quarter centred on growth drilling at Penny’s Find along strike and at depth,
resource programs at Monument and Pinner (Cannon), Kestrel, Falcon and Honeyeater (Binduli).
New discovery drilling programs also commenced at Kanowna South, Martin’s and Cannon
North. Exploration field work at the core Greater Boorara – Cannon – Golden Ridge project area,
and Lakewood continued.
In addition, the Company has continued to advance the high-grade Cannon, Penny’s Find and
Rose Hill underground developments, and prepare environmental studies required for statutory
approval work for other projects, whilst also exploring potential joint ventures, and review of
further consolidation and divestment opportunities.
1
.
As announced to the ASX on 13 December 2022, see also Cautionary and Forward-Looking Statements on
Page 34.
Page 2 of 34
ASX ANNOUNCEMENT
MINE DEVELOPMENT AND OPERATIONS
The Company has a clear strategy of developing a series of low tonnage, high grade assets into
production to bring in cashflow to the business without necessarily depleting a large amount of
the resource base. During the quarter, the company focussed on the Cannon underground
development under a contract / JV mining and milling model, along with progressing the
development of the Penny’s Find and Rose Hill projects.
The advanced Cannon gold project is located 30km east-southeast of Kalgoorlie-Boulder
(Figure 1) and 15km east of Boorara on existing roads. The Company acquired the project in
2021 and completed a detailed review of all geological information enabling compilation of an
updated Mineral resource estimate for the underground deposit immediately beneath the existing
open pit.
The Mineral Resource estimate (JORC 2012) for Cannon is shown below. 1
Resource category
Indicated
Inferred
Total
Cannon at 1.0g/t Au lower cut-off grade
Tonnes (t)
Grade (g/t Au)
176,000
51,000
226,000
Gold metal (oz)
5.10
2.30
4.40
28,580
3,750
32,330
In the March Quarter 2022, the Company released the results of the Pre-Feasibility Study (PFS)
comprising underground decline development from a portal within the historic open pit under a
contract mining and toll milling model.
As announced to the ASX on 29 March 2022, the key outcomes of the study are summarised in
the table below:
1
Measure
PFS Outcome
Lateral Development (m)
1,264
Vertical Development (m)
131
Development Ore (kt)
15.0
Stoping Ore (kt)
120
Total Mined Ore (kt)
135
Gold grade (g/t)
4.1
Stope Mining Recovery
95%
Milling Recovery (%)
90%
Recovered Gold (oz)
15,910
Capital Costs (incl development) (A$m)
4.3
C1 Costs (A$/oz)
1,644
All in Sustaining Costs (A$/oz)
1,873
Free Cashflow at A$2,600/oz Au Price (A$m)
10.1
As announced to the ASX on 29 March 2022, see also Tables and Confirmations on Page 32.
Page 3 of 34
ASX ANNOUNCEMENT
There exists significant potential for resource growth down plunge (Figure 2) of the Cannon shear
zone with further drilling planned from underground drilling locations during the mining sequence.
There is also the opportunity to extend the strike length of the mineralisation to the North with
initial work testing this concept undertaken during the quarter (see Exploration and Evaluation
section below).1
The company has been working with FMR Investments on developing the mine through a JV
mining and milling process. During the quarter, FMR completed its technical and commercial
due diligence on the project, which validated Horizon’s previous work and added additional
robustness to the project plan and economics.
The mine plan is being reviewed with the aim of de-risking the project by extracting the higher
grade veins in the more competent hangingwall, and either leave the lower grade ore zones in
the poorer ground conditions adjacent to the footwall ultramafics, or extract them later in the
mining sequence.
The financial model is under review on the revised mine plan, which shall form part of the formal
JV agreement. Work is now focussed on finalising the contractor / JV partner negotiations for
underground mining and milling, with legal and commercial negotiations are well advanced. 1
The parties have moved the Cannon Mine development forward, with FMR expending funds on
refurbishing mobile equipment inclusive of jumbo, truck and IT (Integrated Tool carrier), and
ordering explosives magazines for the site, and have hired several key personnel for Cannon.
Horizon has ordered the equipment to dewater the Cannon open pit to expose the underground
portal location, and has engaged Greenlands Equipment to construct the pipeline, commencing
in the December 2023 quarter.
All development approvals have been received for Cannon, with the project funding already
secured via the US$3m second tranche of the company’s Nebari loan facility being fully drawn
down. 2 For more information, see below under Corporate / Finance section.
Figure 2: The Cannon open pit looking northeast.
1
See Forward-looking and Cautionary Statement on Page 37. 2 As announced to the ASX on 14 June 2023 and 19
October 2022.
Page 4 of 34
ASX ANNOUNCEMENT
EXPLORATION AND EVALUATION
During the Quarter, the Company conducted drilling at Penny’s Find, the Binduli camp (Kestrel,
Falcon, Honeyeater), the Greater Boorara-Cannon area (Monument, Pinner, Cannon North and
Martins) and Kanowna South.
Results from Monument and Pinner were released during the quarter, with the results from the
other areas either pending or being finalised. These results shall be released to the market in the
December 2023 quarter. 1
Following on from the drilling at Penny’s Find in the June 2023 quarter, additional drilling was
required to increase confidence in the northern domain and increase the tonnes in the Indicated
resource category, improving the conversion to Ore Reserves.1 An update of the MRE is
expected in the December 2023 quarter with mining optimisation and design to commence
thereafter.
Planning activities for further drilling programs were developed for Kestrel and Honeyeater
targetting resource growth and definition, and new discovery drilling at Kanowna South. At
Lakewood, historic survey and magnetic data was acquired and is currently being reprocessed
with modern software to allow target generation to underpin a drilling program in 2024.
Greater Boorara – Cannon project area
The Boorara Gold Project is located 15km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1km southwest of the Nimbus Silver-Zinc Project site where established offices
are connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
The Mineral Resource estimate (JORC 2012) for Boorara is shown below 2:
Resource category
Measured
Indicated
Inferred
Total
Boorara at 0.5 g/t Au lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
1.28
1.23
7.19
1.27
2.56
1.26
11.03
1.26
Gold metal (koz)
51
294
103
448
Cannon is in the western part of the Bulong ultramafic complex in the Boorara Domain. The
Bulong complex consists of 5km thick sequence of komatiitic lava flows made up of a thick
serpentinised peridotite in the centre of the complex, flanked by thin spinifex‐textured komatiitic
flows at the top of the sequence. High‐Mg basalts and interflow sediments are intercalated with
the thin flow facies komatiites. Komatiitic basalt and high‐Mg basalts have a variety of textures
which include pillowed, pyroxene spinifex and variolitic.
The Cannon mineralisation is structurally controlled and strikes north‐easterly, dipping steeply to
the north‐west; higher grade zones within the mineralised envelope appear to have a steep
northerly plunge. Gold‐related alteration consists of biotite‐calcite‐chlorite‐pyrite alteration with
an inner core of albite‐silica‐carbonate‐biotite‐pyrite‐gold replacement of the high Mg basalt and
intermediate intrusions. The Cannon gold deposit is hosted within a sequence of ultramafic and
1
See Forward-looking and Cautionary Statement on Page 34. 2 As announced to the ASX on 27 April 2021 and see
Tables and Confirmations on Page 32.
Page 5 of 34
ASX ANNOUNCEMENT
high‐Mg basaltic rocks intruded by a mafic‐intermediate suite of lamprophyre dykes, and rarer
dacitic dykes.
Open pit mining was completed in June 2017 with 576,400t mined at 2.98g/t for 55,143 ounces,
almost a 100% reconciliation back to the resource. An adit at Cannon was mined in the east pit
wall below the ramp to recover a parcel of ore that became inaccessible via open pit mining.
Development of the adit began in May 2017 and production was completed in June 2017.
A total of 10,640 tonnes at 9.15g/t Au for 3,131 ounces were recovered; a significant
improvement on the reserve figures of 13,313 tonnes at 6.92 g/t for 2,962 ounces.
The Company acquired the project in 2021 and completed a detailed review of all geological
information enabling compilation of an updated Mineral resource estimate for the underground
deposit immediately beneath the existing open pit.
The Cannon project consists of the Cannon underground project, and also Monument, Pinner
and Homerton prospects located within 1km leading the company to believe the area has
demonstrated potential to be a significant future mining hub.1
A maiden MRE was released for Monument during the quarter, which stands at:
395,000t grading 1.97g/t Au for 25,000oz at a 0.8g/t Au cut-off grade 2
Further drilling at Monument was undertaken to potentially extend and improve confidence in the
resource, with five aircore holes for 198m and seven RC holes for 567m undertaken during the
quarter. Results are being collated and reviewed for incorporation into an updated MRE due in
the December 2023 quarter, in preparation for pit optimisation work early in the new year. Initial
approvals reconnaissance work also commenced. Liaison with DMIRS has confirmed the
required environmental approvals pathway for Monument. Waste rock and soil characterisation
work shall commence in the December 2023 quarter. Detailed (Level 2) Flora and
Reconnaissance (Level 1) Fauna surveys shall also be conducted in the current spring in
preparation for developing a Mining Proposal to submit to DMIRS in 2024.
A further 14 Aircore (AC) holes for 483m were drilled at Pinner to validate historic results and
infill sufficient detail to enable a maiden MRE to be generated. Results are being collated and
the updated MRE is due in the March 2024 quarter.
•
Significant mineralisation intercepted included: 3
o
2m @ 3.03g/t Au from 36m and 4m @ 0.55g/t Au from 41m (CAAC23010)
o
9m @ 1.36g/t Au from 27m (CAAC23003)
o
2m @ 2.12g/t Au from 10m, 1m @ 1.11g/t Au from 15m and 1m @ 0.74g/t Au
from 21m (CAAC23011)
o
6m @ 1.23g/t Au from 28m (CAAC23013)
See Figures 3 and 4 for recent and historic assay results.3 Mineralisation at Monument has now
been defined along 700m of strike length and remains open to the north, south and at depth.
1
See Forward-looking and Cautionary Statement on Page 34. 2 As announced to the ASX on 19 July 2023 and
Tables and Confirmations on Page 32. 3 As announced to the ASX on 31 August 2023.
Page 6 of 34
ASX ANNOUNCEMENT
Figure 3: Monument and Homerton locations and drilling highlights 1
Figure 4: Monument cross section (see Figure 3 for location) 1
1
See Tables and Confirmations on Page 32.
Page 7 of 34
ASX ANNOUNCEMENT
There is a discovery target to the North of the Cannon mine where an historic hole recorded
anomalous gold mineralisation. One RC drill hole was drilled to 180m and a downhole EM survey
conducted at the base of the hole to expand the search for potential sulphide conductors. The
data is being processed to determine whether a potential conductor and therefore potential
extension of the underground development exists.
Discussions with Marlinyu Ghoorlie Native Title claimants are progressing with a heritage
clearance survey request to commence over the Monument, Pinner and Golden Ridge Projects
in the next quarter.
Within the Greater Boorara – Cannon project area, work was also carried out at the Martin’s
Prospect and Golden Ridge North.
The Martin’s Prospect, located to the west of Boorara had historical workings and quartz outcrops
that reconnaissance sampling indicated to be mineralised. Four holes for 280m of RC were drilled
testing the area for mineralisation. Results are being collated and will be reported in the
December 2023 quarter.
The Golden Ridge North prospect is immediately adjacent to the historic Golden Ridge open pit
mine, 20km to the southeast of Kalgoorlie in the WA goldfields. During the quarter, a maiden
resource for Golden Ridge North was announced, which stands at:
1.42Mt grading 1.23g/t Au for 57,000oz at a 0.8g/t Au cutoff grade 1
Scoping study work on Golden Ridge North has commenced to determine the open pit mining
potential.
Penny’s Find Gold Project
The 100% owned Penny’s Find gold project is located 50km northeast of Kalgoorlie-Boulder in
the heart of the Western Australian goldfields (Figure 1 and 5).
The high-grade gold mineralisation at Penny’s Find is hosted in thin quartz veins at the contact
between footwall sediments, including black shale and siltstone and a hanging wall basalt. The
quartz veins dip about 60° to the northeast and collectively average 1m to 5m true width.
Open cut mining to 85m (242m RL) was completed by Empire Resources in 2018 with toll
treatment processing at Lakewood (Kalgoorlie) and Burbanks (Coolgardie). Production from the
open pit totalled 18,300oz at 4.47g/t Au (as announced to the ASX by Empire (ASX: ERL) on 25
July 2018).
Metallurgical test work and toll milling data from open pit ore processing has shown fresh
mineralisation to be free milling with a high gravity recoverable gold component and a total gold
recovery which exceeded 90%.
The current MRE (JORC 2012) for Penny’s Find is shown below 2:
Penny’s Find at 1.5g/t Au lower cut-off grade
Resource category
Tonnes (t)
Grade (g/t Au)
Indicated
Inferred
Total
1
203,000
67,000
270,000
Gold metal (oz)
5.45
3.60
4.99
As announced to the ASX on 19 July 2023 and see Tables and Confirmations on Page 32. 2 As announced to
the ASX on 31 May 2023 and see Tables and Confirmations on Page 32.
35,000
8,000
43,000
Page 8 of 34
ASX ANNOUNCEMENT
An internal review and results from drilling in 2022 highlighted the potential to grow the production
profile with infill drilling to convert the Inferred material to Indicated in the current resource (Figure
5), and extension drilling along strike to the north and, particularly at depth below the current
resource envelope.1
Planned infill and extension drilling was completed in the June 2023 quarter via an eight hole
RC/diamond program for 2,552.4m with the following highlights: 2
•
1.45m @ 2.61g/t Au from 314.75m and 3.2m @ 4.19g/t Au from 318.3m (PFRCD23003)
•
1.05m @ 6.36g/t Au from 355.5m (PFRCD23001)
•
1.0m @ 7.49g/t Au from 363.9m (PFRCD23002)
•
2.90m @ 1.73g/t Au from 292.0m (PFRCD23007)
•
0.78m @ 12.85g/t Au from 331.48m (PFRCD23006)
PFRCD23003 confirms the northern high grade plunge which indicates Penny’s is open at depth,
providing potential for additional resources.
During the quarter, two RC holes for 789m were drilled to further infill the mineralisation to the
north to ensure sufficient density to classify that area of the resource as Indicated resource
category, for potential inclusion in an Ore Reserve.1 Two small RC holes for 160m were also
drilled north of the Penny’s Find open pit to investigate unrelated, anomalous gold from old
historic holes. Discussions with the Kakarra A Native Title claimants are progressing with a
heritage clearance survey request to commence in the next quarter. An updated resource model
will be estimated enabling updated mine optimisation and design studies to be completed for
generation of Ore Reserves in H1 CY2024. 1
Figure 5: Penny’s Find project drilling results to date 2
1
See Forward-looking and Cautionary Statement on Page 34. 2 As announced to the ASX on 31 May 2023.
Page 9 of 34
ASX ANNOUNCEMENT
Binduli gold project area
The Binduli area is located 9km west of Kalgoorlie - Boulder and is accessible by existing sealed
and unsealed roads (Figures 1, 6 and 7). The project area contains the core satellite projects
Crake and Coote in the south of the tenement package and the Honeyeater, Kestrel and Falcon
prospects in the north.
The geology at Binduli is dominated by the Black Flag Group – a sequence of intermediate and
felsic volcanics, sedimentary rocks and porphyry intrusives. Typically, the area is covered by
major North North-West (NNW) shear zones cutting across the historic Binduli goldfield. Close
to West Kalgoorlie are the Crake and Coote deposits which are similar to the 390,000oz Janet
Ivy open pit, located 1.5km south, where the gold is hosted in a structurally controlled pink
feldspar porphyry. At the nearby Fort William and Fort Scott open pits, where over 100,000oz
have been produced to date, gold is hosted within sheared units of volcanics and clastic
sediments. Results from recent drilling programmes can be seen in Figure 6.
The Mineral Resource estimate (JORC 2012) for the advanced Crake deposit is shown below 1:
Resource category
Indicated
Inferred
Total
Crake at 0.8 g/t Au lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
1.33
0.46
1.42
1.47
1.27
1.46
Gold metal (koz)
63,150
3,300
66,500
Figure 6: Magnetic Image with drilling highlights at Coote and Crake
1
As announced to the ASX on 28 September 2022, see also Tables and Confirmations on Page 32.
Page 10 of 34
ASX ANNOUNCEMENT
The Mineral Resource estimate (JORC 2012) for the Coote deposit is shown below 1:
Resource category
Inferred
Total
Coote at 1.0 g/t Au lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
0.43
1.54
0.43
1.54
Gold metal (koz)
21,000
21,000
The local geology at Honeyeater is dominated by the Black Flag Group – a NNW trending
sequence of intermediate and felsic volcanics, sedimentary rocks and porphyry intrusives. The
regional Janet Ivy Shear Zone meanders and gently cuts across the stratigraphy to the N-NW of
Honeyeater. Late-stage NE faults have created significant offsets and form important structures
for the gold mineralisation.
The gold mineralisation is typically found in a shear zone with quartz veins, minor pyrite, and
various amounts of silica-carbonate-sericite-chlorite alteration. The saline environment and
strong weathering profile at Honeyeater has resulted in a 25m depletion zone from the surface.
At the Honeyeater prospect (Figure 7), 13 RC holes for 1,063m in 2022 intersected significant
new high-grade mineralisation intercepted.2 The mineralisation at Honeyeater spans a 200m
strike length and remains open to the north, south and at depth. During the quarter, a small AC
and RC program totalling 345m was conducted to infill with the aim of progressing towards a
preliminary resource model. 3
Follow up drilling at Kestrel was also undertaken during the quarter. 12 AC holes for 642m and 5
RC holes for 536m were drilled to test the lateral extents of the deposit. Results are expected to
be returned in the December 2023 quarter. 3 The company also progressed Native Title with a
heritage survey clearance being requested to commence next quarter to assist with granting
MLA26/855 over the Crake and Coote projects.
Figure 7: Honeyeater prospect geology and drilling highlights
1
As announced to the ASX on 28 September 2022, see also Tables and Confirmations on Page 32. 2 As
announced to the ASX on 23 August 2022. 3 See Forward-looking and Cautionary Statement on Page 34.
Page 11 of 34
ASX ANNOUNCEMENT
Lakewood project area
The Lakewood project is located 20km southeast of Kalgoorlie - Boulder in the heart of the
Western Australian goldfields and immediately south of the Superpit (Figures 1 and 8).
The Lakewood project is extensively covered by playa lake sediments, aeolian deposits derived
from desiccated playas and other transported Cainozoic material. Only a small portion of the
Project area is covered by in-situ soils, and there is virtually no outcrop. Lakewood typically
comprises a thin veneer of soils overlying plastic clays that vary in thickness from 2m - 40m.
Below this are unconsolidated clays and sands and then bedrock. Sandy grey clay filled
paleochannels exist within the central Project area, some of which host small amounts of alluvial
gold. There has been no mining activity on the tenure.
The interpreted geology of the Lakewood project is a late-stage sedimentary basin dominated by
metamorphosed sedimentary rocks and felsic volcanic/intrusive rocks of the Black Flag
Formation, together with a sequence of sediments, basalts, mafic and ultramafic intrusives on
the eastern edge.
Recent interpretative gravity work in 2021 by an external consultant has shown that this linear
zone of mafic/ultramafic intrusives is located on a regional scale (~10mGal), deep seated
(+1,600m) NNW trending, vertical dipping litho-boundary. This could potentially be a key driver
as many of the Nickel and Platinum Group Metals (PGM) occurrences in the Eastern Goldfields
are sited close to deep crustal structures.
During 2021, the Company completed a first pass reconnaissance program comprising 59 AC
holes for 3,002m testing four priority targets for nickel-cobalt and platinum group metals over a
mafic/ultramafic intrusives and sediments1.
During the quarter, historic EM survey and magnetic data was acquired and is being reprocessed
with modern software to allow target generation to underpin a drilling program in 2024.
Figure 8: Lakewood drilling highlights
1
As announced to the ASX on 7 April 2022.
Page 12 of 34
ASX ANNOUNCEMENT
Rose Hill gold project
Rose Hill is located 0.5km southeast of Coolgardie and lies on the western margin of the Archean
Norseman-Menzies Greenstone Belt. Mineralisation is hosted within the main Rose Hill diorite
(porphyry), adjacent to the hanging wall ultramafic and an eastern porphyry unit alongside the
Greenmount Sill (Figures 9 and 10). It is part of the same mafic-ultramafic package that includes
the Brilliant, Tindals and Dreadnought deposits to the south and Queen of Sheba to the north.
During the Quarter, mine evaluation and review of surface infrastructure requirements continued,
along with liaising with key stakeholders.
Figure 9: Rose Hill drill hole 2020 collar plan and cross section locations
The current strategy for Rose Hill is to develop an open pit (box cut) mining out the oxide and
transitional material to establish a portal location within fresh rock. Underground development
and mining would then commence to extract the underground resource and drill test depth
extensions from underground cuddy locations.
The Mineral Resource estimate (JORC 2012) for Rose Hill open pit is shown below1:
Rose Hill Open Pit at 0.5 g/t Au lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
Gold metal (koz)
Measured
0.19
2.00
12,300
Indicated
0.09
2.00
6,100
Inferred
Total
0.29
2.00
18,400
1
As announced to the ASX on 9 December 2020, see Tables and Confirmations on Page 32.
Page 13 of 34
ASX ANNOUNCEMENT
The Mineral Resource estimate (JORC 2012) for Rose Hill underground is shown below1:
Rose Hill Underground at 2.0 g/t Au lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
Gold metal (koz)
Indicated
Inferred
Total
0.33
0.18
0.51
4.50
4.80
4.60
47,100
27,800
74,900
There is also the potential to develop the nearby Brilliant North deposit as an open pit. There is
no quoted resource at present and further drilling is required to test historical drilling results. The
area is complicated due to the Coolgardie State Battery which shall require remediation of the
tailings and relocation of the historical significant battery. Liaison with the Perth Mint (owner of
the battery) was re-instigated during the quarter with the aim of working through a mutual solution
to exploit this potential resource. Applications for two miscellaneous licences have been
submitted to link the Rose Hill and Brilliant North leases for infrastructure and access purposes,
which can enable a combined project approach in this area. Discussions with the Marlinyu
Ghoorlie Native Title claimants are progressing with a heritage clearance survey request to
commence in the next quarter
Figure 10: Rose Hill deposit cross section E - E’ (see Figure 11 for location).
1
As announced to the ASX on 9 December 2020, see Tables and Confirmations on Page 32.
Page 14 of 34
ASX ANNOUNCEMENT
Nimbus Silver-Zinc project
The Nimbus Silver-Zinc Project lies adjacent to the Boorara gold mine (Figures 1 and 11) and
was placed on care and maintenance in 2007 after producing 3.6Moz of silver from 318kt of ore
processed at a grade of 353g/t Ag. The old plant has since been removed and the area
rehabilitated. The mine office and other infrastructure is still in place and operational.
The current Project hosts a high-grade silver zinc resource of 256kt @ 773g/t Ag and 13% Zn as
part of the global Nimbus resource of 12.1Mt @ 52g/t Ag, 0.9% Zn and 0.2g/t Au for a total of
20Moz Ag and 104kt Zn and 78koz Au. 1
Nimbus is a shallow-water and low-temperature VHMS deposit with epithermal characteristics
(i.e., a hybrid bimodal felsic deposit), which is consistent with its position near the margin of the
Kalgoorlie Terrane. The current Discovery and East pits have been subject to extensive drilling
highlighting significant potential to extend mineralisation along strike and at depth below 400m.
Regional exploration has been limited to the north and south and is considered highly prospective
for further precious and base metal deposits.
Figure 11: Nimbus project location and regional geology
Extensive metallurgical test work has been completed on Nimbus ore with the Feasibility Study
put on hold in 2016. In light of increasing silver and zinc prices and as announced to the ASX on
11 February 2021, the Company will retain the project and subject to available funding engage
an independent technical team to review and update the FS in 2024.
As announced to the ASX on 24 March 2022, the review highlighted the potential of the project
through underground mining the fresh higher-grade ore below the historic Discovery pit and
generating a silver and a zinc concentrate for sale to potential offtake