Resource Conversion and Extensional Drilling Update
Released
Released
Announcement PDF
Maritana Minerals Limited | ABN 88 007 761 186 | maritanaminerals.com.au
PO Box 1064, West Perth WA 6872 | +61 8 9386 9534 | info@maritanaminerals.com.au
ASX: MRT
ASX ANNOUNCEMENT
3 September 2026
RESOURCE CONVERSION AND EXTENSIONAL DRILLING
UPDATE
Maritana Minerals Limited (ASX: MRT) (“Maritana” or “the Company”) is pleased to provide an update on
drilling activity across its projects surrounding the Black Swan Processing Hub (“BSPH”) in the Western
Australian Goldfields. Phase 2 drilling at Burbanks and the maiden aircore program at Wilsons have been
completed with assays awaited. Resource conversion drilling is underway at Coote and Crake, and drilling
completed at Boorara ahead of the open pit restart in mid CY2027 and first gold from the BSPH in H2 CY2027.
HIGHLIGHTS
• Coote and Crake Project – Resource conversion and extensional drilling has commenced at the
Coote and Crake gold deposits, located approximately 10km northwest of Kalgoorlie-Boulder, as part
of the 60,000m campaign across the Company’s projects
• Boorara Project – RC drilling at Boorara, the first ore source for the BSPH, has been completed, with
119 holes for over 17,000m drilled
• The drilling is designed to convert Inferred Mineral Resources to the Indicated category, supporting
Ore Reserve updates and an updated life-of-mine1
plan for the BSPH
• Mining restart at Boorara is targeted for mid-2027, ahead of BSPH commissioning and first processing
in H2 CY2027
• Wilsons Prospect – The 4,000m maiden aircore program at the Wilsons Gold Prospect, located
~400m from the BSPH, is complete, with assays submitted and first results expected in October
CY2026
• Burbanks Project – Phase 2 extensional drilling at Burbanks is complete following high-grade results
reported from the first holes of the program2
• Three drill rigs are now operating across the Company’s projects in the Kalgoorlie and Coolgardie
districts with a fourth rig commencing during September 2026 to accelerate drill programs
Mr Grant Haywood, Managing Director and CEO:
“With rigs now turning at Coote and Crake, and drilling programs completed at Boorara, Burbanks and Wilsons,
Maritana has one of the most active drill programs in the district. The majority of these programs will lift
confidence in the ounces closest to the Black Swan Processing Hub so they can be converted into Reserves
and scheduled into the mine plan. In addition, Wilsons represents a new discovery opportunity within a stone’s
throw of our Black Swan infrastructure.”
“This Reserve conversion work is strategically sequenced ahead of the commissioning of Black Swan
Processing Hub. With further Burbanks Phase 2 results expected shortly and assays pending from the major
program at Boorara, we expect to have results flowing through over the coming months to support Ore Reserve
1
Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
2
Refer ASX Announcement “Phase 2 Drilling Extends High Grade Burbanks Mineralisation” dated 27 August 2026
maritanaminerals.com.au Page | 2
updates and an updated life-of-mine plan for Maritana. This puts us on track for mining to restart at Boorara in
mid-CY2027 and first processing in H2 CY2027.”
Coote and Crake Projects – Open Pit
Reverse circulation drilling and diamond drilling has commenced at Coote and Crake, two of the four initial ore
sources for the BSPH. The deposits sit within the Binduli project area 10km west of Kalgoorlie, approximately
500m apart, with multiple drill rigs deployed at the project to accelerate drilling over the coming three months.
Gold mineralisation at Coote and Crake is structurally controlled and hosted in feldspar porphyries — the same
setting as the 390,000oz Janet Ivy open pit approximately 1,500m to the south. More than 100,000oz has been
produced from the nearby Fort William and Fort Scott open pits3
.
Earlier infill and extensional RC drilling at Crake demonstrated width and grade continuity over a 450m strike,
with mineralisation remaining open in multiple directions, while drilling at Coote, immediately adjacent to Crake,
provided the data density required to support resource estimation. Maiden open pit Ore Reserves for Crake
were reported in the 30 June 2026 annual statement4
.
Figure 1 - Coote and Crake Project Diamond Drilling
3
Refer ASX Announcement “Updated Crake Resource improves in quality” dated 7 September 2021
4
Refer ASX Announcement “Annual Mineral Resources and Ore Reserves Statement” dated 20 August 2026
maritanaminerals.com.au Page | 3
Wilsons Gold Prospect – Target Generation
The 4,000m+ maiden aircore program at the Wilsons Gold Prospect has been safely completed. The program
provided the first dedicated shallow drilling coverage of the gold-in-soil anomaly of more than 2.5km x 1.5km
defined in 2024, located 400m from the BSPH, over ground historically explored almost exclusively for nickel.
Samples have been submitted for assaying, with first results expected in October CY2026. Based on assay
results, the Company will assess future exploration works on this target.
Figure 2 – Wilsons Gold Prospect RC drill rig operating with the processing facility in the background
Boorara Project – Open Pit
RC drilling at Boorara has been completed as part of the conversion campaign, alongside the grade control
drilling supporting pre-production planning for the mining restart targeted in mid CY2027. A total of 119 RC
drillholes for over 17,000m have been completed to date and a detailed grade control drill program is planned
prior to mining commencing. Boorara will provide the first ore feed to the BSPH, supplying initial mill feed
through commissioning and ramp-up. To support commissioning, a 460kt ore stockpile has been established
from previous mining at Boorara. Mining is scheduled to restart in mid CY2027 and targeted first ore processing
in H2 CY2027. Grade control drilling is defining the first ore blocks ahead of the mining restart.
maritanaminerals.com.au Page | 4
Figure 3 – Boorara Project – RC drilling looking south-west - Resource defining drilling – Boorara Open Pit in
the background
Burbanks Project – Open Pit and Underground
Phase 2 extensional drilling at Burbanks has now been completed, with final assays pending, having targeted
extensions to the Main Lode and Birthday Gift lodes at depth. Initial results from the Phase 2 drilling have been
reported with encouraging results supporting mineralisation extending at depth5
. An updated Mineral Resource
estimate incorporating the Phase 1 program is expected in the current September Quarter 2026.
The Phase 1 conversion drilling campaign is designed to convert and upgrade a portion of the existing Inferred
Mineral Resource at each project into the Indicated category, providing the geological confidence required for
Ore Reserve updates and detailed mine planning. The outcomes will feed an updated life-of-mine plan for the
BSPH, with the objective of enhancing plant feed grade and extending mine life, ahead of commissioning and
first processing in H2 CY2027.
Next Steps
• Boorara – Grade control and final conversion drilling results to be incorporated into the pre-production
mine plan ahead of the planned mining restart in mid CY2027.
• Coote and Crake – RC and diamond drilling to continue over the coming three months, with first assay
results expected within the next month.
• Wilsons – First aircore assay results expected in October CY2026, to guide follow-up target definition.
5
Refer ASX Announcement “Phase 2 Drilling Extends High Grade Burbanks Mineralisation” dated 27 August 2026
maritanaminerals.com.au Page | 5
• Burbanks – Final Phase 2 assays pending, with an updated Mineral Resource estimate expected in
the current September Quarter 2026.
Authorised for release by the Board of Directors.
For further information, please contact:
Grant Haywood Michael Vaughan
Managing Director and CEO Investor and Media Relations – Fivemark
grant.haywood@maritanaminerals.com.au michael.vaughan@fivemark.com.au
+61 8 9386 9534 +61 422 602 720
JOIN MARITANA MINERALS INTERACTIVE HUB
Visit https://maritanaminerals.com.au/auth/signup for
Maritana Minerals’ Interactive InvestorHub
MARITANA MINERALS
Email: info@maritanaminerals.com.au
maritanaminerals.com.au Page | 6
Figure 4 – Maritana Minerals Regional Tenement Holding
maritanaminerals.com.au Page | 7
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements. They
include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward
looking statements include, but are not limited to, statements preceded by words such as “planned”,
“expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”,
“nominal”, “conceptual” and similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
as are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be relied on as a
guarantee of future performance. Forward looking statements may be affected by a range of variables that
could cause actual results to differ from estimated results, and may cause the Company’s actual performance
and financial results in future periods to materially differ from any projections of future performance or results
expressed or implied by such forward looking statements. These risks and uncertainties include but are not
limited to liabilities inherent in mine development and production, geological, mining and processing technical
problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals required
in connection with mining and third party processing operations, competition for among other things, capital,
acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of
acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various
events which could disrupt operations and/or the transportation of mineral products, including labour stoppages
and severe weather conditions, the demand for and availability of transportation services, the ability to secure
adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current ASX Listing
Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in the
announcement, including with respect to any production targets and financial estimates, based on the
information contained in this and previous ASX announcements.
Cautionary statement
Statements in this report relating to the Life of Mine (LOM) pertain to the Company’s Scoping Studies which
were originally released to the ASX on 17 February 2026 and are preliminary in nature. The Scoping Studies
include Indicated and Inferred Mineral Resources and are based on low-level technical and economic
assessments, which are insufficient to support estimation of Ore Reserves. There is no certainty that the study
outcomes, including production targets and financial assumptions, will be realised. All material assumptions
and technical parameters underpinning the Scoping Study production targets and financial information
continue to apply and have not materially changed since that announcement.