Quarterly Activities Report 31 December 2023
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
31 JANUARY 2024
QUARTERLY ACTIVITIES REPORT FOR THE
PERIOD ENDED 31 DECEMBER 2023
HIGHLIGHTS
•
Six (6) Reverse Circulation (RC) holes for 778m were completed at various prospects
including Cannon North, Golden Ridge South, Kanowna South and Rundle Dam
•
An updated underground (<260 m RL) Mineral Resource Estimate for Pennys Find has
been compiled by the Company and stands at:
o
•
429kt grading 4.57 g/t Au for 63,000 oz at a 1.5g/t Au lower grade cut-off 2
Over 80% of the resource is in the Indicated Resource category and can be incorporated
into the ongoing mine optimisation and underground design work. The Indicated
Resource stands at:
o
305kt grading 5.19 g/t Au for 51,000 oz at a 1.5g/t Au lower grade cut-off 2
•
Bridgetown-Greenbushes reconnaissance and soil and rock chip sampling programme
completed
•
Aboriginal Heritage Surveys completed at Monument, Golden Ridge, Coote-Crake and
Rose Hill
•
Dewatering pipeline construction between Cannon and Golden Ridge underway
•
Commenced Lithium Rights divestment process with numerous interested parties with
support by advisors Argonaut PCF
•
Cash at bank of A$5.7 million and listed investments totalling A$8.7 million
MARCH QUARTER ACTIVITIES 1
•
Feasibility study for Pennys Find being undertaken with a maiden Ore Reserve expected
in the June Quarter 2024
•
Continue Cannon development re-tender process and contract negotiations
•
New resources and scoping studies for open cut mining Monument and Pinner planned
in 2024
•
Target generation and planning of 2024 drill program and field season activities
•
Bridgetown-Greenbushes soil and rock chip sampling programme assay results to be
received and further programmes to be completed
See Forward Looking and Cautionary Statements on Page 29.2 As announced to the ASX on 29 December 2023, see also Tables and
confirmations on Page 27-28.
1
163 Stirling Hwy
Nedlands WA 6009
PO Box 1104
Nedlands WA 6909
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
OVERVIEW
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to provide the
December 2023 Quarterly Activities Report. Horizon is an exploration and production company
within the Kalgoorlie and Coolgardie regions of Western Australia (Figure 1).
A key focus for the Company is on near term production and exploration upside within our 1,000
km2 tenement package. The company holds numerous multi - commodity assets including 1.28
Moz of gold resources 1, the Nimbus Silver Zinc project in Western Australia and listed
investments including Richmond Vanadium Technology (ASX: RVT) which holds the world class
1.8Bt Richmond vanadium project in northwest Queensland (Figure 9). 2
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Activities during the quarter centred on updating resource models following drilling at Pennys
Find, and preproduction activities commencing at the Cannon Project including construction of a
dewatering pipeline between Cannon and Golden Ridge. The purchase of Bridgetown
Greenbushes Lithium tenements and initial soil and rock chip sampling was also undertaken.
The balance sheet was strengthened with the completion of the divestment of 62 non-core
tenements to Northern Star for $3.1 million, and receipt of $3 million in TSX listed Vox Royalty
Corporation common shares which have been escrowed for 4 months.
In addition, the Company has continued to advance the high-grade Cannon, Pennys Find and
Rose Hill underground developments, and prepare environmental studies required for statutory
1
See Summary of Gold Mineral Resources and Confirmation on page 27. 2 As announced to the ASX on 13
December 2022, see also Cautionary and Forward-Looking Statements on Page 29.
Page 2 of 29
ASX ANNOUNCEMENT
approvals work on other projects, whilst also exploring potential joint ventures, and review of
further consolidation and divestment opportunities.
MINE DEVELOPMENT AND OPERATIONS
The Company has a clear strategy of developing a series of low tonnage, high grade assets into
production to bring cashflow into the business without necessarily depleting a large amount of
the resource base. During the quarter, the company focussed on the Cannon underground
development and re-issued tender packages for contract / JV mining, along with progressing the
development of the Penny’s Find and Rose Hill projects.
The advanced Cannon gold project is located 30km east-southeast of Kalgoorlie-Boulder (Figure
1) and 15km east of Boorara on existing roads. The Company acquired the project in 2021 and
completed a detailed review of all geological data enabling the compilation of an updated Mineral
Resource Estimate for the underground deposit immediately beneath the existing open pit.
The Mineral Resource Estimate (JORC 2012) for Cannon is shown below. 1
Resource category
Indicated
Inferred
Total
Cannon at 1.0g/t Au lower cut-off grade
Tonnes (t)
Grade (g/t Au)
176,000
5.10
51,000
2.30
226,000
4.40
Gold metal (oz)
28,580
3,750
32,330
In the March Quarter 2022, the Company released the results of the Pre-Feasibility Study (PFS)
comprising underground decline development from a portal within the historic open pit under a
contract mining and toll milling model.
As announced to the ASX on 29 March 2022, the key outcomes of the study are summarised in
the table below:
Measure
1
PFS Outcome
Lateral Development (m)
1,264
Vertical Development (m)
131
Development Ore (kt)
15.0
Stoping Ore (kt)
120
Total Mined Ore (kt)
135
Gold grade (g/t)
4.1
Stope Mining Recovery
95%
Milling Recovery (%)
90%
Recovered Gold (oz)
15,910
Capital Costs (incl development) (A$m)
4.3
C1 Costs (A$/oz)
1,644
All in Sustaining Costs (A$/oz)
1,873
Free Cashflow at A$2,600/oz Au Price (A$m)
10.1
As announced to the ASX on 29 March 2022, see also Tables and Confirmations on Page 27-28.
Page 3 of 29
ASX ANNOUNCEMENT
There exists significant potential for resource growth down plunge of the Cannon shear zone
(Figure 2) with further drilling planned from underground during the mining sequence. There is
also the opportunity to extend the strike length of the mineralisation to the North with initial work
testing this concept undertaken during the quarter (see Exploration and Evaluation section
below).1
All development approvals have been received for Cannon, with the project funding already
secured via the US$3m second tranche of the company’s Nebari loan facility being fully drawn
down. For more information, see below under Corporate / Finance section.
Figure 2: The Cannon open pit looking northeast.
EXPLORATION AND EVALUATION
During the Quarter, the Company conducted a small drill program consisting of six (6) RC
drillholes for 778 m at the Cannon North, Golden Ridge South Kanowna South and Rundle Dam
prospects and are discussed further below.
Greater Boorara – Cannon project area
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1 km southwest of the Nimbus Silver-Zinc Project site where established offices
are connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
1
See also Cautionary and Forward-Looking Statements on Page 29.
Page 4 of 29
ASX ANNOUNCEMENT
The Mineral Resource Estimate (JORC 2012) for Boorara is shown below 1:
Resource category
Measured
Indicated
Inferred
Total
Boorara at 0.5 g/t Au lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
1.28
1.23
7.19
1.27
2.56
1.26
11.03
1.26
Gold metal (koz)
51
294
103
448
Cannon North
One drillhole was drilled 200 m north, along strike of the Cannon open cut mine during the
quarter. CARC23014 was earlier drilled to 180 m with a Down Hole EM (DHEM) survey indicating
that there was a potential EM conductor at depth. In conjunction with Southern Geoscience
Corporation, it was decided to re-enter the hole and extend the drilling to 282 m and conduct
another DHEM from 180 - 282 m.
No new significant Au mineralisation was detected to 282 m however preliminary verbal advice
from SGC suggests the conductor is firmed up, but now deeper than the extended drillhole. Final
recommendations from SGC are pending.
Figure 3. Schematic of CARC23014 and the original EM anomaly
1
As announced to the ASX on 27 April 2021 and see Tables and Confirmations on Page 27.
Page 5 of 29
ASX ANNOUNCEMENT
Cannon is in the western part of the Bulong ultramafic complex in the Boorara Domain. The
Bulong complex consists of 5km thick sequence of komatiitic lava flows made up of a thick
serpentinised peridotite in the centre of the complex, flanked by thin spinifex‐textured komatiitic
flows at the top of the sequence. High‐Mg basalts and interflow sediments are intercalated with
the thin flow facies komatiites. Komatiitic basalt and high‐Mg basalts have a variety of textures
which include pillowed, pyroxene spinifex and variolitic.
The Cannon mineralisation is structurally controlled and strikes north‐easterly, dipping steeply to
the north‐west; higher grade zones within the mineralised envelope appear to have a steep
northerly plunge. Gold‐related alteration consists of biotite‐calcite‐chlorite‐pyrite alteration with
an inner core of albite‐silica‐carbonate‐biotite‐pyrite‐gold replacement of the high Mg basalt and
intermediate intrusions. The Cannon gold deposit is hosted within a sequence of ultramafic and
high‐Mg basaltic rocks intruded by a mafic‐intermediate suite of lamprophyre dykes, and rarer
dacitic dykes.
Open pit mining was completed in June 2017 with 576,400 t mined at 2.98 g/t for 55,143 ounces,
almost a 100% reconciliation back to the resource. An adit at Cannon was mined in the east pit
wall below the ramp to recover a parcel of ore that became inaccessible via open pit mining.
Development of the adit began in May 2017 and production was completed in June 2017.
A total of 10,640 t at 9.15 g/t Au for 3,131 ounces were recovered from the adit; a significant
improvement on the reserve physicals of 13,313 t at 6.92 g/t Au for 2,962 ounces.
The Company acquired the project in 2021 and completed a detailed review of all geological
information enabling compilation of an updated Mineral resource estimate for the underground
deposit immediately beneath the existing open pit.
The Cannon project consists of the Cannon underground project, and also the Monument, Pinner
and Homerton prospects located within 1km of Cannon leading the company to believe the area
has demonstrated potential to be a significant future mining hub.1
Discussions with Marlinyu Ghoorlie Native Title claimants progressed with a heritage survey
conducted in December 2023 at Monument. No major issues were noted. This helps clear the
path towards potential open cut mining at Monument and Pinner later this year. Botanica
Consulting also conducted detailed (Level 2) flora and reconnaissance (Level 1) fauna surveys
at Monument during the quarter to assist in applications for Mining Proposal approvals.
Penny’s Find Gold Project
The 100% owned Pennys Find gold project is located 50km northeast of Kalgoorlie-Boulder in
the heart of the Western Australian goldfields (Figure 1 and 4). The project presents an early
underground development and production opportunity to generate cash under a toll milling and
underground contractor / JV arrangement.
The recent infill and extension programs aimed to improve resource classification and test
extensions with excellent results and new mineralisation intercepted to the north. The deposit
also remains open at depth and will be tested from underground drilling positions. 1
The high-grade gold mineralisation at Pennys Find is hosted in thin quartz veins at the contact
between footwall sediments including black shale and siltstone and a hangingwall basalt. The
quartz veins dip about 60° to the northeast and collectively average 1 m to 5 m true width.
1
See forward Looking and Cautionary Statements on Page 29.
Page 6 of 29
ASX ANNOUNCEMENT
Open cut mining to 85 m depth (242 mRL) was completed by Empire Resources in 2018 with toll
treatment processing at Lakewood and Burbanks mills. Production from the open pit totalled
18,300 oz at 4.47 g/t Au, as announced to the ASX by Empire (ASX: ERL) on 25 July 2018.
Metallurgical test work and toll milling data has shown fresh mineralisation to be free milling with
a high gravity recoverable gold component and a total gold recovery which has exceeded 90%.
An eight-hole RC and diamond tail drill program for 2,550 m was completed in Q2 2023, and an
additional four RC holes drilled in Q3 2023 for 906 m. 1 The total resource drilling, mostly RC with
diamond tails, undertaken by Horizon at Pennys Find since 2021 stands at 8,085.1 m.
The 2023 drilling primarily focussed on the inferred or peripheral ore zones, especially to the
north. In addition to the assaying, the diamond core was subsequently used to confirm
geotechnical observations and interpretations and further structural assessment.
The additional drilling was included in a Resource update completed during the quarter which
estimated a 63,000 ounce underground resource for Pennys Find (Table 1).
Table 1: Pennys Find Minerals Resource Estimate (JORC 2012) 2
Pennys Find underground (<260m RL) at 1.5g/t Au cut-off grade
Resource category
Tonnes (t)
Grade (g/t Au)
Gold metal (oz)
305,000
5.19
51,000
Indicated
123,000
3.02
12,000
Inferred
429,000
4.57
63,000
Total
Figure 4. Long section view of Pennys Ore Classification (Purple is Indicated, Green is
Inferred ore)
As announced to the ASX on 31 May 2023 and 5 December 2023 and see Tables and Confirmations on Page 27. 2 As announced on
29 December 2023 and also see resource tables and confirmation on page 27.
1
Page 7 of 29
ASX ANNOUNCEMENT
There was no Measured ore category beneath the current open pit. The economics involved in
a significant cut back mining operation for a relatively small amount of ore at high strip ratios
made it more economic to consider underground operations only
The updated resource will now be incorporated into a feasibility study for mine design and
financial analysis and incorporate a maiden Ore Reserve for Pennys Find. The results of the
study are expected in the June Quarter 2024, with a financial investment decision (FID), pending
favourable study results, made thereafter.
Golden Ridge
Two (2) RC holes were drilled at Golden Ridge South approximately 1.6km south along strike
from the Golden Ridge mine. One drill hole to 120 m was a recommended hole to test an earlier
DHEM anomaly discovered in 2022. No significant sulphides or potential conductor was
encountered in the drillhole. A second hole to 110m depth tested the down dip extent of narrow,
high grade quartz Au mineralisation discovered in GRAC21007 (2 m @ 7.10 g/t from 53 m). No
quartz was observed suggesting the vein had pinched out or was faulted off. No significant
mineralisation was observed in either hole.
At Golden Ridge North, discussions with Marlinyu Ghoorlie Native Title claimants were
progressed with a heritage survey conducted in December 2023 at Golden Ridge North. No major
issues were noted. Botanica Consulting also conducted detailed (Level 2) flora and
reconnaissance (Level 1) fauna surveys at Golden Ridge during the quarter. These discussions
and surveys assist clear the path towards potential future open cut mining and transport of ROM
grade stockpiles located at Golden Ridge.
Kanowna South
Two (2) RC holes for 196 m were completed at Kanowna South. One hole aimed to test the
anomalous black shale near the Yarri Rd prospect, in particular, a change of orientation from the
regional 040o drill trend typically used to 190o. This new orientation was based on field
observations of quartz veining seen in outcrop. No quartz was observed, with the mineralisation
returning low composite grades typical of the black shale. No final assays have yet been received.
A second hole was scissored beneath KSRC230081 that aimed to test the down dip extent of the
high grade Au-As mineralisation discovered (1 m @ 5.91g/t Au and 0.7% As from 66 m). No
significant composite mineralisation was observed which suggests the mineralisation pinches
out. Both prospects in particular have been downgraded.
Rundle Dam
One deep RC hole to 250 m was drilled at Rundle Dam, west of Ora Banda to test a strong IP
conductor anomaly generated in 2017 that was associated with an ultramafic-basalt sequence.
Previous drilling south along the IP trend had discovered gold mineralisation associated with
black shales.
No massive sulphides were observed, multi-element assays have not yet been received.
1
See Forward-looking and Cautionary Statement on Page 29.
Page 8 of 29
ASX ANNOUNCEMENT
Rose Hill gold project
During the Quarter, mine evaluation and review of surface infrastructure requirements continued,
along with liaising with key stakeholders. Discussions with Marlinyu Ghoorlie Native Title
claimants were progressed with a heritage survey conducted over both tenements in December
2023. One query was noted on the Rose Hill tenement M15/652 and this is expected to be
resolved shortly. No major issues were noted. The heritage survey clearance will allow for
planned drilling at the Brilliant North Prospect on M15/1204 this year.
In addition, a meeting was held with the Coolgardie Shire to update them on Horizon’s mining
plans. Horizon has been invited to the Shire Office to provide a formal presentation on its
proposed Coolgardie mining plans and schedule to council.
Figure 5: Rose Hill block model 1
1
As announced to the ASX on 9 December 2020, see also Tables and Confirmations on Page 27-28.
Page 9 of 29
ASX ANNOUNCEMENT
Figure 6: Rose Hill deposit cross section E - E’
The current strategy for Rose Hill is to develop an open pit (box cut) mining out the oxide and
transitional material to establish a portal location within fresh rock. Underground development
and mining would then commence to extract the underground resource and drill test depth
extensions from underground cuddy locations.
The Mineral Resource estimate (JORC 2012) for Rose Hill open pit is shown below1:
Rose Hill Open Pit at 0.5 g/t Au lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
Gold metal (koz)
Measured
0.19
2.00
12,300
Indicated
0.09
2.00
6,100
Inferred
Total
0.29
2.00
18,400
The Mineral Resource estimate (JORC 2012) for Rose Hill underground is shown below1:
Rose Hill Underground at 2.0 g/t Au lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
Gold metal (koz)
Indicated
0.33
4.50
47,100
Inferred
0.18
4.80
27,800
Total
0.51
4.60
74,900
1
As announced to the ASX on 28 September 2022, see also Tables and Confirmations on Page 27.
Page 10 of 29
ASX ANNOUNCEMENT
There is also the potential to develop the nearby Brilliant North deposit as an open pit.1 There is
no quoted resource at present and further drilling is required to test historical drilling results. The
area is complicated due to the Coolgardie State Battery which requires remediation of the tailings
and relocation of the historical significant battery. Liaison with the Perth Mint (owner of the
battery) was re-instigated during the quarter with the aim of working through a mutual solution to
exploit this potential resource. Applications for two miscellaneous licences have been submitted
to link the Rose Hill and Brilliant North leases for infrastructure and access purposes, which can
enable a combined project approach in this area.
Nimbus Silver-Zinc project
The Nimbus Silver-Zinc Project lies adjacent to the Boorara gold mine (Figures 1 and 7) and was
placed on care and maintenance in 2007 after producing 3.6 Moz of silver from 318 kt of ore
processed at a grade of 353 g/t Ag. The old plant has since been removed and the area
rehabilitated. The mine office and other infrastructure is still in place and operational.
The current Project hosts a high-grade silver zinc resource of 256 kt @ 773 g/t Ag and 13% Zn
as part of the global Nimbus resource of 12.1 Mt @ 52 g/t Ag, 0.9% Zn and 0.2 g/t Au for a total
of 20 Moz Ag and 104 kt Zn and 78 koz Au. 2
Nimbus is a shallow-water and low-temperature VHMS deposit with epithermal characteristics
(i.e., a hybrid bimodal felsic deposit), which is consistent with its position near the margin of the
Kalgoorlie Terrane. The current Discovery and East pits have been subject to extensive drilling
highlighting significant potential to extend mineralisation along strike and at depth below 400 m.
Regional exploration has been limited to the north and south and is considered highly prospective
for further precious and base metal deposits.
Figure 7: Nimbus project location and regional geology
1
See Forward-looking and Cautionary Statement on Page 29. 2 See Tables and Confirmations on Page 28.
Page 11 of 29
ASX ANNOUNCEMENT
Extensive metallurgical test work has been completed on Nimbus ore with the Feasibility Study
put on hold in 2016. In light of increasing silver and zinc prices and as announced to the ASX on
11 February 2021, the Company will retain the project and subject to available funding engage
an independent technical team to review and update the Feasibility Study in 2024.
As announced to the ASX on 24 March 2022, the review highlighted the potential of the project
through underground mining the fresh higher-grade ore below the historic Discovery pit and
generating a silver and a zinc concentrate for sale to potential offtake partners. A gold
concentrate was also assessed to improve overall life of mine given the need for additional
tonnage to underpin a concentrator at site.
Given the drilling success to date along the Gretel-Nimbus-Brindabella trend and the potential
for repeat high grade lenses at Nimbus deeps and along strike, a focussed drilling campaign has
been planned aiming to commence in 2024 1. Exploration Target drilling zones identified below
the Nimbus pits are shown below (Figure 8).
Horizon has reviewed and updated resource models and has formed a view that there is a
potential VHMS (Zn – Ag – Pb) Exploration Target, inclusive of oxide silver and primary Zn-AgPb sulphide mineralisation, of between 550,000 tonnes and 700,000 tonnes with a grade range
of 3.4 – 3.6% Zn, and 140 – 210 g/t Ag, with minor Pb (0.45 – 0.65%) 1. To date these Exploration
Targets have not been drilled.
Figure 8: Long section through Ag Lode 211 showing down dip/plunge extension
The Company remains focused on gold exploration and underground development activities in
the near term, with drilling at Nimbus planned for 2024.
1
See Forward-looking and Cautionary Statement on Page 29.
Page 12 of 29
ASX ANNOUNCEMENT
ACQUISITIONS AND DIVESTMENTS
The company announced on 29 March 2021 that it had entered into a binding royalty sale and
purchase agreement with Vox Royalty Corporation (TSX: VOX) (“Vox”) to divest its 100% interest
in two royalties covering the Janet Ivy and Otto Bore gold projects in the Western Australian
goldfields for $7m on the following terms:
•
A$4 million in cash upon completion; and
•
A$3 million in cash or Vox shares at Vox’s election (priced on a 30-day VWAP basis)
upon Vox receiving cumulative payments of A$750,000 from the transaction royalties.
The deferred cumulative tonnage trigger was met in the September 2023 quarter with the
payment trigger met on 12 November 2023. Payment was made to Horizon of A$3m in Vox
shares which have been escrowed for a period of four months, after which time the company
plans to immediately monetise the shares.
During the quarter, the company also sold its interest in 62 non-core tenements to Northern Star
Resources (ASX: NST) for $3.1m in cash and deferred payments including:
•
Discovery Payments of A$20/ounce for any JORC compliant Mineral Resource located
on the Tenements, capped at 2 million ounces; and
•
A Net Smelter Royalty (“NSR”) of 0.5% on all metals and minerals extracted from the
Tenements.
The Company continues to assess consolidation opportunities within the Western Australian
(WA) goldfields region to augment the production pipeline and is working with a number of parties
for mutual gain.1 As highlighted previously by the company, a number of expressions of interest
were explored with regard to the potential divestment of assets in the Kalgoorlie and Coolgardie
regions.
RICHMOND VANADIUM PROJECT
The Richmond Vanadium Project is located 650 km west of Townsville and 250 km east of Mt
Isa in NW Queensland (Figure 9) and is owned 100% by RVT with Horizon owning 8.94% of
RVT.
Figure 9: Richmond Vanadium Project location and surrounding infrastructure
1
See Forward-looking and Cautionary Statement on Page 29.
Page 13 of 29
ASX ANNOUNCEMENT
The project tenements cover ~1,400 km2 of Cretaceous Toolebuc Formation and the advanced
Lilyvale deposit north of Richmond.
As announced to the ASX on the 13 December 2022, RVT (ASX: RVT) completed its IPO raising
$25 million (before costs) and listed on the ASX. As part of the IPO, eligible Horizon shareholders
were issued 20 million RVT shares via an in-specie distribution with 19.8 million RVT shares
retained by the Company representing 8.94% of RVT’s issued capital. The current value of the
company’s holding in RVT can be seen in the Corporate / Finance section below.
For more information on Richmond Vanadium Technology and the project, we refer you to their
website at www.richmondvanadium.com.au or the ASX under ticker code RVT.
WHITE RANGE GOLD PROJECT (Divested)
Horizon has divested the White Range gold project in the Northern Territory to Red Dingo
Corporation Pty Ltd. The Company is currently attending to some remediation issues at the site
prior to making application for return of environmental bonds held by the Northern Territory
Department of Primary Industry and Resources.
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
The Company recognises the importance of Environment, Social and Governance (ESG) factors
and is committed to continuous improvement in this regard. During the quarter, a review
continued of all internal policies, procedures, and governance principles to identify improvements
and opportunities to ensure we meet or exceed our corporate license to operate.
The Company previously worked with BDO Global to conduct an analysis of the business to
identify opportunities to improve the Company’s ESG performance. Materiality surveys were
completed for both internal and external stakeholders and completed a workshop to map the
opportunities and generate an initial sustainability report.
The aim of the process is to develop systems and processes to ensure we meet or exceed our
social license to operate and adopt the sustainability report covering current and future activities.
The company engaged and held meetings during the quarter with traditional owners
representing Kakarra in relation to Penny’s Find, and the Marlinyu Ghoorlie representatives in
relation to a heritage survey at Monument, in addition to providing a general update to the
representatives on the company’s planned objectives and activities in the region.
In addition, the company has engaged Botanica consulting to conduct detailed (Level 2) Flora
and Reconnaissance (Level 1) Fauna surveys at Monument, Pinner and Golden Ridge in the
December 2023 quarter, in preparation for environmental approval applications for these
projects to be submitted in 2024.1 Waste rock and soil characterisation work has also been
commissioned for Monument during the quarter.
CORPORATE / FINANCE
Total cash at bank as at 31 December 2023 was A$5.7 million. In addition, the Company holds
investments in ASX listed companies with a current value of approximately A$8.7 million (See
Table below).
As previously announced to the ASX on 19 October 2022 and 23 November 2022, the Company
executed financial agreements with Nebari LLC for a US$5 million Convertible Loan Facility in
two tranches of US$2 million and US$3 million respectively to pay for and advance the Cannon
1
See Forward-looking and Cautionary Statement on Page 29.
Page 14 of 29
ASX ANNOUNCEMENT
gold project. The first tranche was drawdown on 29 November 2022 and partially used to pay the
final deferred acquisition costs of $2.1 million for the Cannon gold project.
The second tranche of US$3 million was available for drawdown on 16 June 2023 for capital and
development costs to bring the Cannon underground project into production. For further
information and terms of the Loan Agreement, we refer you to the ASX announcement dated 19
October 2022.
In accordance with ASX Listing Rule 5.3.5, A$34,000 was paid to related parties or their
associates during the quarter, comprising Non-executive Director fees and superannuation.
Issued Share Capital
Class of securities
Issued at 31 Dec 2023
Fully Paid Ordinary Shares (HRZ)
Listed Options (HRZOB, strike price 9.7c, expiry 30
June 2025)
Director & Employee Performance Rights *
700,983,676
51,871,015
0
* See ASX Announcement dated 21 April 2023 for details of cancellation of Class J Performance Rights.
Listed Company Investments
Company
Number
Value at 31 Dec 2023
Richmond Vanadium Tech.
19,833,363 1
$5,553,342
Vox Royalty Corp.
948,448
2
$2,868,178
Metal Hawk Limited
1,134,430 3
$153,148
Dundas Minerals Limited
3,234,327 4
$161,716
TOTAL
1.
In mandatory escrow for 24 months to 13 December 2024
2.
In mandatory escrow for 4 months to 24 March 2024
3.
In mandatory escrow for 6 months to 4 January 2024
4.
In mandatory escrow for 6 months to 29 February 2024
$8,736,384
Page 15 of 29
ASX ANNOUNCE
Share your feedback
Discover