Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to provide an update
on the progress of the Pre-Feasibility Study (“PFS”) work currently underway. This includes mining
and infrastructure studies, and the processing plant study to refurbish and repurpose Black Swan to
a gold plant being undertaken by GR Engineering Services Limited (“GRES”).
HIGHLIGHTS
Processing PFS
•
GRES is in the final stages of completing the Black Swan PFS that incorporates
refurbishment of the existing comminution circuit and the introduction of a new gold Carbon
in Leach (“CIL”) processing facility
•
The plant has been designed for 1.5Mtpa throughput with equipment sized to achieve a
product size of P80 106µm
•
GRES has completed a trade-off study and identified a preferred comminution circuit
involving single stage crushing plus SAG and ball mill
•
This configuration utilises the existing Black Swan comminution circuit and provides the most
flexibility and robustness for managing future ore types and any throughput rate increase
•
The new CIL beneficiation component of the study is also well advanced, with process flow
diagrams, mechanical equipment and electrical load lists, single line diagrams and various
other components completed
Mining and Infrastructure Studies
•
High level scoping studies have been finalised by Mining Plus and rankings completed on 24
open pit and underground mineral deposits
•
More detailed PFS studies on prioritised deposits are underway to provide potential ore feed
for the Black Swan processing facility
•
Infrastructure and utilities components of the PFS are also ongoing, inclusive of power supply
and network requirements, water supply requirements, accommodations studies and other
civil works to accommodate greater ore storage under a hub and spoke processing model
•
Environmental and permitting approvals are ongoing
•
Delivery of the combined PFS is on track for completion in the December 2025 quarter
Commenting on the study progress, Managing Director and CEO Mr Grant Haywood said: 1
“Progressing the Black Swan Pre-Feasibility Study is an important step in our development and
growth pathway towards being a new, independent mid-tier gold producer. The study work is founded
on robust technical and economic analysis of our assets and is advancing well. With work completed
on the option studies and associated preliminary engineering design, we look forward to sharing the
final outcomes in the December quarter when completed and making a Financial Investment
Decision shortly thereafter, and moving to the next steps of refurbishment and commissioning.”
1
See Forward Looking and Cautionary Statements on Page 8.
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon is pleased to provide an update on the PFS work being undertaken at its 100% owned Black
Swan Project, located approximately 40km to the northeast of Kalgoorlie-Boulder in the heart of the
Western Australian goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Black Swan Processing PFS
The Black Swan process plant PFS being conducted by GRES is progressing well, integrating the
brownfield refurbishment and upgrade of the comminution circuit with the development of a new
greenfield gravity and CIL gold recovery circuit. To date, process flow diagrams, mechanical
equipment and electrical load lists, single line diagrams, and various other components have been
completed.
Page 2 of 8
ASX ANNOUNCEMENT
Figure 2: Black Swan – Process Flow Diagram
Comminution Circuit Design
The comminution circuit is the largest component of the Black Swan processing plant to be retained
for the conversion project to gold processing. A critical first step was to assess the implications of
processing lower-competency gold ore relative to the original high-competency nickel ore, as shown
in Table 1, the gold ore is not particularly hard. This assessment ensured that the optimal circuit
configuration for gold processing was identified, rather than simply relying on the existing
arrangement.
GRES evaluated three comminution circuit options, with the proposed gold processing facility
designed for 1.5Mtpa throughput and equipment sized to achieve a product size of P80 106µm. For
each option, GRES prepared design criteria, mass balances, high-level equipment lists, and
preliminary cost estimates. The comminution options considered were:
1. Single stage crush plus SAG mill (SS SAG). This option includes using existing equipment,
including the primary crusher, coarse ore bin, SAG mill, and cyclone cluster.
2. Single stage crushing plus SAG and ball mill (SABC) (Figure 2). This option includes using
existing equipment, including primary crusher, coarse ore bin, SAG mill, pebble crusher, ball
mill, and cyclone cluster.
3. Three-stage crushing plus ball mill (3SC + BM). This option incudes using existing equipment
including primary crusher, fine ore bin, ball mill, cyclone cluster and new equipment including
a secondary crusher, tertiary crusher and product screen.
Page 3 of 8
ASX ANNOUNCEMENT
In parallel, Orway Minerals Consultants (“OMC”) conducted simulation studies on the different feed
sources through the comminution circuit, using the available ore characteristics to the Black Swan
plant. Multiple potential ore feed sources have been identified within 100km of Black Swan, including
Boorara, Cannon, Penny’s Find, Crake, Burbanks, Rosehill, Kalpini and Jacques.
There is reasonable availability of comminution data for Boorara, Cannon and Kalpini which was
broken up into fresh, transitional and oxide parameters. There is limited comminution data for the
other sources, particularly Burbanks. Additional comminution data for Burbanks is being sourced from
the current drill program which will feed into the PFS, with other ore sources sourced from existing
core. The design basis for the five year plan with ore characteristics developed annually is shown in
the table below.
Table 1: Average Yearly Ore Characteristics
Parameter
Abrasion Index (Ai)
Year 1
0.0814
Year 2
0.0960
Year 3
0.1163
Year 4
0.1280
Year 5
0.1351
Crushing Work Index (CWi), kWh/t
7.3
8.1
10.0
11.3
11.8
Rod Mill Work Index (RWi), kWh/t
14.4
15.6
17.8
17.7
18.0
Bond Ball Mill Work Index (BWi), kWh/t
14.1
14.7
15.4
16.2
16.2
Both the OMC simulations and GRES trade-off studies independently favoured option 1 (SS SAG)
for the 1.5Mtpa rate, but also indicated that with a marginal increase in capital, refurbishing both the
SS SAG and option 2 (SABC) circuits at the start would offer a significant opportunity for future
expansion and greater long-term flexibility.
The GRES PFS has proceeded on the basis of a comminution circuit under both options 1 and 2,
with the SAG and ball mill structural arrangement remaining largely unchanged. The overall
comminution circuit layout has been rationalised to simplify the conveying and pebble crushing
circuits through the removal of redundant conveyors and screens.
Gold Recovery Circuit (new)
For all scenarios, the gravity gold and CIL recovery circuits downstream of comminution are all new
installations and remain the same regardless of comminution circuit type. The gold circuit has been
designed as a new conventional CIL plant, located adjacent to and separate from the existing nickel
flotation circuit.
The design incorporates flexibility for future expansion in processing rate, with provision to increase
the size of equipment such as the pre-leach thickener (a potential bottleneck at higher throughputs)
and footprint allowances for future additional adsorption tanks.
Flotation Circuit (existing)
The nickel flotation circuit has been deliberately excluded and isolated from the gold conversion
project design and will be kept on care and maintenance. This approach reduces complexity by
allowing the new gold circuit to be constructed in an adjacent greenfield area, while retaining flexibility
for future standalone redevelopment of the flotation circuit. By keeping the flotation circuit separate
Page 4 of 8
ASX ANNOUNCEMENT
from the gold plant, future upgrades can be undertaken without interrupting gold operations, while
still enabling a quick and simple tie-in to the comminution and leaching circuits if required.
Mining and Infrastructure Studies
Mining Plus has been engaged to assist with delivering the mining studies that will provide the ore
feed to Black Swan, aiming for a minimum life of mine plan of five years. A total of 24 projects have
had scoping studies completed on them, generating high level metrics inclusive of physicals and
financials. A gap analysis has also been conducted on environmental approvals and other technical
work such as geotechnical, metallurgical and hydrogeological studies to rank the projects and to
prioritise a number of key projects for the PFS phase. Both underground and open pit projects are
undergoing PFS currently.
The cornerstone Burbanks project has shown great potential to be a long-life asset that can feed
Black Swan, however areas of additional project work are required before it can be advanced to a
PFS level of study. The key gaps are metallurgical, particularly comminution data, and geotechnical.
In addition, a large portion of the high-grade underground Mineral Resource is classified as Inferred,
and therefore cannot be converted to an Ore Reserve without further drilling. Horizon is currently
undertaking a large 15,000m infill drilling program with the aim of improving the quality of the Mineral
Resource and providing the core to undertake geotechnical and metallurgical programs.
Burbanks will therefore only be completed to a Scoping Study level for the upcoming PFS, with its
combined Mineral Resource of 465.5koz @ 2.8g/t Au representing significant upside to the initial PFS
mine plan. 1
Next Steps 2
The PFS being completed on the plant refurbishment, infrastructure and mine feed sources is on
track for completion in the December 2025 quarter.
It is anticipated that the PFS and Burbanks Scoping Study will be sufficient to make an informed
Financial Investment Decision (FID) on the mill refurbishment and conversion of Black Swan to a
gold plant. Subject to a positive FID, construction could commence during 2026.
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
See ASX announcements 19 May 2025 and 11 August 2025, and Confirmations on page 6. 2 See Forward Looking and Cautionary
Statements on Page 8.
1
Page 5 of 8
ASX ANNOUNCEMENT
Horizon Minerals Limited – Summary of Gold Mineral Resources
Cutoff
Project
Measured
Indicated
Inferred
Total
Au
ppm
Mt
Au
ppm
Ounces
Mt
Au ppm
Ounces
Mt
Au
ppm
Ounces
Mt
Au
ppm
Ounces
Boorara OP
0.5
1.12
1.22
43,700
6.85
1.28
281,100
2.56
1.26
103,500
10.53
1.27
428,300
Burbanks OP
0.5
1.43
2.02
92,800
3.43
1.86
204,900
4.86
1.90
297,700
Burbanks UG
2.5/2.0
0.12
4.26
16,700
1.07
4.39
151,200
1.19
4.38
167,900
Phillips Find OP
0.5
0.54
2.40
41,700
0.19
2.09
12,700
0.73
2.32
54,400
Phillips Find UG
2
0.00
2.27
208
0.00
2.27
208
Golden Ridge
1
0.48
1.82
27,900
0.05
1.71
2,800
0.53
1.81
30,700
Golden Ridge
North
0.8
0.65
1.15
24,300
0.77
1.30
32,300
1.43
1.23
56,600
Cannon UG
1
0.19
4.80
28,600
0.05
2.28
3,500
0.23
4.29
32,100
Monument
0.5
0.92
1.11
32,800
0.92
1.11
32,800
Pinner
0.5
0.06
1.02
2,100
0.27
1.25
10,800
0.33
1.21
12,800
Pennys Find
1.5
0.31
5.19
51,000
0.12
3.02
12,000
0.43
4.57
63,000
Kalpini
0.8
1.40
2.41
108,600
0.47
2.03
30,700
1.87
2.31
139,300
Rose Hill UG
2
0.33
4.49
47,100
0.18
4.78
27,800
0.51
4.60
74,900
Rose Hill OP
0.5
0.09
2.05
6,100
0.29
1.99
18,300
Jacques-Peyes
0.8
0.97
2.59
80,700
0.77
1.98
49,200
1.74
2.32
129,800
Teal
1
1.01
1.96
63,700
0.80
2.50
64,500
1.81
2.20
128,100
Crake
0.8
1.33
1.47
63,100
0.08
1.27
3,400
1.42
1.46
66,500
Coote
1
0.42
1.54
21,000
0.42
1.54
21,000
Capricorn
0.5
0.66
1.20
25,500
0.66
1.20
25,500
Baden Powell
0.5
0.60
1.20
23,000
0.60
1.20
23,000
Gordons Dam
1.0
0.36
1.70
20,000
0.36
1.70
20,000
13.77
1.88
831,600
30.86
1.84
1,822,900
Total
0.19
1.31
1.96
1.33
12,300
55,900
15.75
1.85
935,300
Confirmation
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted from
and was originally reported in Horizon’s ASX announcements:
•
•
•
•
•
•
•
“Updated Boorara Mineral Resource Delivers a 34% Increase in Gold Grade” (Boorara) 27
April 2021,
Group Mineral Resource Statement – Amended”,”. (Burbanks, Phillips Find) 1 August 2024,
“High Grade Drill results and Resource Update for Rose Hill”, (Rose Hill, Golden Ridge) 4
February 2020,
“Maiden Resources for Monument and Golden Ridge North” (Golden Ridge North), 19 July
2023,
“Investor Presentation June 2022”, (Cannon) 31 May 2022,
“Group Mineral Resource Statement – Amended”,”. (Monument, Pinner) 1 August 2024,
“Pennys Find Resource Update”, (Pennys Find) 29 December 2023,
Page 6 of 8
ASX ANNOUNCEMENT
•
•
•
•
•
•
“Kalpini Gold Project Mineral Resource Update” (Kalpini) 28 September 2021,
“Jacques Find- Peyes Farm Mineral Resource update” (Jaques-Peyes) 15 September 2021,
“Intermin’s Mineral Resources Grow 30% to over 560,000 Ounces”, (ASX:IRC) (Teal) dated
19 September 2018,
“Updated Crake Resource improves in quality” (Crake) 7 September 2021,
“Gold resources increase to 1.24moz” (Coote, Capricorn, Baden Powell) dated 28 September
2022,
“Acquisition of Gordons Dam Project near Black Swan including Gordons Dam project”,
(ASX:HRZ) (Gordons Dam) dated 5 August 2025
each of which is available at www.asx.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market
announcements and that all material assumptions and technical parameters underpinning the
estimates in those announcements continue to apply and have not materially changed. The
Company confirms that the form and context of the Competent Person’s findings in relation to those
Mineral Resources estimates or Ore Reserves estimates have not been materially modified from the
original market announcements.
Confirmation
The information in this report that relates to Horizon’s Exploration Results is extracted from and was
originally reported in Horizon’s ASX announcement “Group Mineral Resource Statement –
Amended” (Burbanks, Phillips Find) 1 August 2024 which is available at www.asx.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and
technical parameters underpinning the exploration results in that announcement continue to apply
and have not materially changed. The Company confirms that the form and context of the Competent
Person’s findings in relation to those exploration results have not been materially modified from the
original market announcements.
Page 7 of 8
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological, mining
and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations,
competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled
personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations
and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate
financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in
the announcement, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Page 8 of 8