Quarterly Activities Report 31 December 2025
Released
Released
Announcement PDF
Level 2, 16 Ord Street, West Perth, WA 6005 | PO Box 1064, West Perth, WA 6872 | +61 8 9386 9534
info@horizonminerals.com.au | ACN 007 761 186 | ABN 88 007 761 186 | horizonminerals.com.au
ASX: HRZ
ASX ANNOUNCEMENT
30 January 2026
QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 31
DECEMBER 2025
HIGHLIGHTS
• Black Swan Processing Hub studies progressed
• Studies upgraded from 1.5Mt/annum to 2.2Mt/annum
• Key infrastructure studies commissioned on power, water, road access and tailings
• Safe completion of Open Pit mining at the Boorara and Phillips Find Projects
• Key activities at Boorara during the quarter included:
o Total ore mined of ~208k tonnes at 1.14 g/t Au
o Tonnes processed totalled ~120kt @ 1.09g/t Au for 3,873oz
o Gold sales totalled 3,689oz at an average price of $6,322/oz generating ~$23.3 million in revenue
• Key activities at Phillips Find during the quarter included:
o 132kt of ore delivered at 1.74g/t to a third-party processing plant
o Gold sales to be finalised with the JV partner and funds to be received in the March 2026 quarter
• Burbanks – Phase 1 drilling results highlights include ultra high-grade 0.3m @ 5,848g/t (25HBBD024)1
• Further drilling highlights at Burbanks from the December quarter with 25 holes completed include1
:
o 0.96m @ 1,762g/t Au from 259.17m, including 0.3m @ 5,848g/t Au (25HBBD024);
o 1.55m @ 99.65g/t Au from 336.3m including 0.4m @ 350.00 g/t Au from 336.7m and 0.35m at
64.29g/t Au from 336.3m (25HBBD004)
o 1.7m @ 37.18g/t Au from 71.0m (25HBBD004)
o 0.9m @ 12.65g/t Au from 278.2m, 0.3m @ 34.80g/t Au from 370.2m and 0.6m @ 7.78g/t Au from
381.4m (25HBBD001)
o 1.0m @ 31.63g/t Au from 106.0m (25HBBD005)
• Completion of Gordons Dam Project Acquisition, asset in close proximity to the Black Swan Processing
Hub
• Asset Sale Agreement executed for the Divestment of Lake Johnston – consideration of $30m cash and
$5m shares in Forrestania Resources (ASX:FRS). A $10m non-refundable deposit has been received.
• Land Use Agreement executed with the Marlinyu Ghoorlie Native Title Claimant Group
• Appointment of General Manager Corporate Development – Christian Price
• Cash position at the end of quarter – $37.5 million
• ~14,300oz Au contained is stockpiled and unsold
Overview
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to report on its activities for the
quarter ended 31 December 2025.
Horizon’s key objective is near term gold production through the proposed Black Swan Processing Hub and
exploration upside within our large tenement package of over 1,000 km2
, located within the Kalgoorlie and
1
ASX announcement titled “Ultra High-Grades Returned in Burbanks Phase 1 Drilling” dated 17 December 2025
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 2
Coolgardie regions of Western Australia (Figure 1). The Company holds 1.8Moz of gold resources and a number
of multi-commodity assets including the 20.2Moz Ag Nimbus silver-zinc project2
.
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure including the
Gordons Project acquisition (in yellow)
Activities during the quarter focused on advancing standalone gold production by generating near-term cash flow
from existing assets while progressing the Black Swan Processing Hub as the long-term cornerstone asset.
The Company executed mining at Boorara and Phillips Find, delivering revenue through toll milling and ore sale
agreements. Resource growth continued at Burbanks via infill and extensional drilling to upgrade confidence,
extend high-grade zones, and secure feed for Black Swan.
A key strategic advancement during the quarter was the expansion of the Black Swan refurbishment study from
1.5Mt/annum to 2.2Mt/annum, leveraging existing plant capacity to establish the Black Swan Processing Hub and
Spoke model. This enhances flexibility for multiple Horizon asset ore feeds and potential third-party opportunities.
Currently, low-risk, third-party processing cash flows are assisting funding the capital-efficient conversion,
targeting mid-tier production (~100kozpa aspirational)3
through resource consolidation, infrastructure
optimisation, and multi-project development in the Kalgoorlie-Coolgardie region.
This brownfield approach utilises existing approvals and infrastructure to accelerate the transition to a standalone,
high-margin gold producer.
2
ASX announcement titled “Nimbus Zinc Silver Project Update” dated 28 October 2024
3
This is an aspirational statement (and not a production target), the Company does not yet have reasonable ground to believe the vision can
be achieved. Refer to the Aspirational Statements section in the Disclaimers section of this announcement.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 3
Black Swan Project Update
GR Engineering Services (GRES) progressed the initial Pre-Feasibility Study (PFS) during the December
quarter based on a nominal throughput of 1.5 Mt/annum and a five-year mine plan. The study included a plant
development schedule, CAPEX and OPEX estimates and incorporated refurbishment of both the SAG and ball
mills.
During the PFS, Horizon identified increased confidence in ore supply beyond the initial mine plan and, in
consultation with GRES, assessed the potential for higher throughput. While progressing the 1.5 Mt/annum PFS
as planned, Horizon requested GRES to complete a scoping-level assessment of increasing throughput to the
theoretical maximum through the comminution circuit, including identification of downstream bottlenecks,
indicative capital costs and schedule impacts.
The assessment demonstrated that throughput of up to 2.2 Mt/annum could be achieved across the comminution
and downstream leaching circuits for a modest increase in capital cost, with no material impact to the
development schedule.
Following this outcome, Horizon commissioned GRES to run additional scheduling scenarios at 2.2 Mt/annum
PFS, with detailed mine scheduling at the higher throughput which is expected to be completed in the March
2026 quarter. The 2.2Mt/annum processing PFS report allows for direct progression into Front-End Engineering
Design (FEED) and includes a tendered long-lead item list defining the critical path for the process plant.
A range of supporting infrastructure studies specific to the Black Swan Project site were completed during the
quarter:
• Power: Scoping studies and independent inspections of existing high-voltage infrastructure were
completed, together with ongoing discussions with Western Power regarding grid reconnection options
and required upgrades.
• Roads and Access: Scoping studies were completed for public access roads, internal road upgrades and
ROM pad modifications to support external ore delivery by road train.
• Water: On-site bore field inspections and preliminary testing were completed to assess refurbishment
scope and costs. A scoping study into alternative water supply options to support revised operating
requirements was also completed and is under review.
• Tailings: Horizon completed its annual TSF audit and undertook preliminary investigations into
repurposing the existing TSF for gold operations. The currently approved TSF lift design was also
reviewed to define a pathway to fast track modified TSF designs with flexibility for potential extensions to
the current planned life of mine throughput assumptions.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 4
Figure 2: Black Swan Project – Existing SAG & Ball Mills
Mining and Infrastructure Studies
Mining Plus has been engaged to assist with delivering the PFS Ore Reserve and Scoping studies that will provide
the ore feed to Black Swan. Studies have been finalised and a life of mine plan produced.
Additional studies planned in the March 2026 quarter will prepare for mine readiness of the near-term Mineral
Resource and Ore Reserves.
The flagship Burbanks project has continued to show great potential to be a long-life open pit and underground
asset that will supply Black Swan, however areas of additional project work are required before it can be advanced
to a PFS level of study. A geotechnical gap analysis has been completed which has identified information gaps
which are being progressed. Metallurgical test work has been completed with no changes to the design criteria
for Black Swan.
The PFS results as well as scoping studies for the remaining Mineral Resources (including Burbanks’ Scoping
Study) will be to a sufficient detail to make an informed Financial Investment Decision (FID) on the mill
refurbishment and conversion of Black Swan to a gold plant.
Mine Development and Operations
The Company continues to successfully execute on its strategy of bringing its extensive gold assets into
production, generating positive cashflows during record high gold prices with its Boorara and Phillips Find Gold
Projects.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 5
Figure 3: Loading ore at Boorara to transport to the Paddington Mill
Figure 4: Ore on the Phillips Find ROM pad
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 6
Figure 5: Mining the Newminster pit at Phillips Find
Boorara Gold Project
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the Super Pit, and 1
km southwest of the Nimbus Silver-Zinc Project site where established offices are connected to mains power and
existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with bounding shear
zones and late-stage cross faults. Mineralisation occurs as northwest dipping sheeted and stockwork quartz-
carbonate vein arrays within the quartz dolerite host rocks, and steeply dipping zones along sheared geological
contacts trending to the north-northwest.
Key activities at Boorara during the quarter included:
• Total ore mined of ~208kt at 1.14 g/t Au, with this stage of mining now completed
• Tonnes processed totalled ~120kt @ 1.09g/t Au for 3,873oz contained
• Gold sales totalled 3,689oz at an average price of $6,322/oz generating ~$23.3 million in revenue
As announced on 21 November 2025, Paddington have reduced third party feed, including Horizon ore from
Boorara, to 45% of contracted levels, and it was anticipated that haulage volumes would return to contracted
levels in early December 2025. The reduced tonnages remained at below contracted levels for the remainder of
the quarter, and the Company is reviewing its position in relation to contracted volumes to Paddington. At the end
of the quarter, the Company had a total of ~14,300oz Au contained and unsold on the Boorara ROM pads.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 7
Table 1: Quarterly production data
Phillips Find Project
The project is centred 45km north-northwest of Coolgardie (Figure 1) covering over 10km strike of prospective
greenstone stratigraphy, and includes the Phillips Find Mining Centre (PFMC) where approximately 33,000oz of
gold was produced between 1998 and 2015 from three open-pit operations; Bacchus Gift, Newhaven and
Newminster.
During the quarter mining production continued until 19 November 2025 with haulage to a third-party processing
plant. Production was primarily from the Newminster open pit.
132Kt of ore was delivered at 1.74g/t to the plant ROM during the December quarter.
Ore processed from Phillips Find during the December quarter has not yet been finalised with Horizon’s JV
partner. Tonnages processed and revenue is expected to be finalised during the March 2026 quarter with final
distributions from the JV to be also made next quarter.
Acquisitions and Divestments
Completion of Gordons Dam Acquisition
During the quarter, Horizon completed the acquisition of the Gordons Dam Project from Yandal Resources Limited
(ASX:YRL). The project comprises 34 granted tenements covering approximately 77km² in the Western Australian
goldfields, strategically located near the Black Swan processing plant.
All conditions precedent under the Binding Tenement Sale Agreement were satisfied, and settlement was
finalised. As consideration, Yandal received $1.2 million in cash and 37.6 million Horizon shares, (pre-
consolidation), strengthening Horizon’s regional gold footprint and providing additional near-mine development
and exploration opportunities.
Jul-Sep 25 Oct-Dec 25
Boorara Gold Project UoM Qtr. 1 Qtr. 2 FY26 YTD FY25 Total
MINING & HAULAGE
Mined
Ore Mined tonnes 268,728 207,678 476,406 605,981
Mined Grade [est.] gr/t 1.03 1.14 1.08 0.93
Gold Mined oz 8,874 7,602 16,476 18,154
Hauled
Ore Hauled tonnes 232,696 124,622 357,318 321,589
Hauled Grade [est.] gr/t 0.94 1.10 1.00 0.91
Gold Hauled oz 7,028 4,410 11,438 9,423
PROCESSING & REVENUE
Milled
Ore Milled tonnes 238,096 120,451 358,547 305,647
Milled Grade gr/t 1.06 1.09 1.07 0.89
Recovery % 90.9% 91.9% 91.2% 92.1%
Gold Produced oz 7,349 3,873 11,222 8,052
Sales
Gold Invoiced oz 6,549 3,689 10,239 7,609
Average Price A$/oz 5,472 6,322 5,778 4,981
Revenue $AM 35.8 23.3 59.1 37.9
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 8
Lake Johnston Project Divestment
During the quarter, Horizon executed a formal Asset Sale Agreement with Forrestania Resources Limited
(ASX:FRS) for the divestment of its 100% owned Lake Johnston Project, a non-core nickel asset in Western
Australia.
The agreed total consideration of $35 million comprised of $30 million in cash and $5 million in Forrestania shares.
Horizon has already received $10 million in upfront non-refundable cash, with the further $20 million cash and $5
million in Forrestania shares payable at completion. The Company expects to complete the divestment in the
March 2026 quarter.
Proceeds from the sale will strengthen Horizon’s balance sheet and be applied toward the refurbishment and
restart of the Black Swan processing facility, funding long-lead plant items and supporting the advancement of
Horizon’s surrounding gold projects and broader growth strategy.
Divestment of Lakewood Project
During the quarter, Horizon divested its interest in the non-core Lakewood project tenements, to Black Cat
Syndicate Limited (ASX:BC8), for a total consideration of $200,000. This divestment aligns with the Company’s
strategy to consolidate its high-priority gold assets and advance the Black Swan processing facility and
surrounding gold projects.
Burbanks - Exploration and Evaluation
Extensional and infill drilling commenced at Burbanks in late June 2025 and continued steadily through the
quarter. On 6 October 2025, the Company announced assays results for 15 holes, with highlights as follows4
:
• 1.55m @ 99.65g/t Au from 336.3m including 0.4m @ 350.00 g/t Au from 336.7m and 0.35m at 64.29g/t
Au from 336.3m (25HBBD004)
• 5.3m @ 3.49g/t Au from 235.7m including 0.6m @ 19.22 g/t Au from 238.7m (25HBBD004)
• 1.7m @ 37.18g/t Au from 71.0m (25HBBD004)
• 3.7m @ 5.13g/t Au from 222.4m including 0.57m @ 27.52g/t Au from 224.8m (25HBBD004)
• 0.9m @ 12.65g/t Au from 278.2m, 0.3m @ 34.80g/t Au from 370.2m and 0.6m @ 7.78g/t Au from 381.4m
(25HBBD001)
• 7.2m @ 3.92g/t Au from 260.3m, 2.0m @ 4.86g/t Au from 280.0m and 4.0m @ 12.75g/t Au from 366.1m
(25HBBD002)
• 1.0m @ 31.63g/t Au from 106.0m (25HBBD005)
• 1.3m @ 15.01g/t Au from 335.3m (25HBBD008)
• 1.0m @ 19.84g/t Au from 285.0m (25HBBD013)
On 17 December 2025, the second batch of drilling results from the first phase of extensional and infill drilling
were announced including a spectacular ultrahigh grade intercept of 0.3m at 5,848g/t Au from 259.17m depth.1
.
Intercepts are not true widths but stated as downhole intervals due to the vertical nature of the ore body and
restricted collar locations, and are commonly, but not consistently, at a low angle to the mineralisation. Further
detailed results from the returned drilling assay results included1
:
• 0.96m @ 1,762g/t Au from 259.17m, including 0.3m @ 5,848g/t Au (25HBBD024)
4
ASX announcement titled “Burbanks Drilling Returning Spectacular Grades” dated 6 October 2025
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 9
• 0.51m @ 14.93g/t Au from 143.66m, 0.39m @ 4.31g/t Au from 147.86m, 0.86m @ 6.53g/t Au
from 150.5m and 1.48m @ 1.54g/t from 167.52m, including 0.35m @ 4.15g/t Au from 168.65m
(25HBBD023)
• 1.18m @ 9.51g/t Au from 122.22m, 0.8m @ 5.10g/t Au from 197.87m and 1.81m @ 9.17g/tAu from
372.19m (25HBBD018)
• 2m @ 4.97g/t Au from 34m, 0.34m @ 4.94g/t Au from 215.24 (25HBBD016)
• 4.0m @ 2.39g/t Au from 17m, including 2m @ 4.09g/t Au from 17m (25HBBD019); and
• 3.0m @ 2.54g/t Au from 57m, including 1m @ 4.32g/t Au from 57m, 0.38m @ 6.83g/t Au from
91.95m, 0.59m @ 4.54g/t Au from 253m and 1.87m @ 4.97g/t Au from 265.96m (25HBBD021)
Coarse grained visible gold in drill core has been observed, hosted in quartz carbonate veining within sheared
basalt or, alternatively, associated with a distinctive garnet-rich diorite that has intruded along the Burbanks Shear.
The ultra-high grade of 5,848g/t Au over 0.3m from 259.17m (Figure 6) within an overall significant intercept of
0.96m @ 1,762g/t Au from 259.17m in (25HBBD024)1
helped confirm the exceptional potential for down dip
extensions to the high-grade gold mineralisation. This key intercept provides compelling evidence for immediate
resource expansion potential in this critical infill area.
Figure 6: Visible gold in a quartz vein at 259.3m from hole 25HBBD024. The interval grades 0.3m @
5848g/t Au from 259.17m (refer Table 1) 1
. Core width is NQ2 and ≈ 50.5mm in diameter for scale
While the program successfully intersected high-grade gold mineralisation through these zones, significantly
improving continuity, the very high-grade result in 25HBBD024 was recorded in the Main Lode-Burbanks North
bridge that lies outside the current resource boundary (Figure 7). Two thirds of the Phase 1 Burbanks drilling have
been completed by the end of the December quarter.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 10
Figure 7: SW NE schematic long section on local grid showing the location of drilling around the Main
Lode, the current MRE categories, historical pierce points and recent drill traces with pierce points >1.0g/t
Critical to understanding and expanding the Burbanks deposits is the identification of high-grade plunging ore
shoots. These ore shoots have become apparent with the combination of recent drilling, reviewing historical data
and reports, as well as through the increased understanding of the structural controls on mineralisation with input
from external consultants.
Guided by the Phase 1 results, the second phase of drilling will target down-dip and strike extensions of known
high-grade lodes, aiming to further expand and grow the resource base. Planning and approvals for the second
phase of Burbanks drilling also commenced during the quarter with drilling commencing in early 2026 as well as
further refinement of the exploration target pipeline and development of the Resource portfolio.
Environmental, Social and Governance
The Company acknowledges the importance of Environment, Social and Governance (ESG) factors and is
committed to continuous improvement in this regard.
During the quarter several key operational water licences at Boorara, Cannon and Golden Ridge were combined
in preparation for future operational requirements.
Horizon achieved an important milestone in December with the execution of the Native Title Land Use Agreement
with Marlinyu Ghoolie (MG) native title claim. The Marlinyu Ghoorlie Native Title Claim area covers the majority
of the Horizon’s tenure in the eastern goldfields region of WA, overlapping approximately 240 tenements and 90%
of the Company’s land package by area. This agreement provides a solid framework of cooperatively working
together to identify and protect Aboriginal Cultural Heritage at Horizon’s projects whilst allowing the Company to
advance its pipeline of projects to feed the Black Swan processing facility.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 11
The Agreement sets out protocols for heritage surveys, safeguards for site protection, and streamlined grant of
tenure and clearance procedures for activities under Horizon’s tenure. It is a significant positive step towards
Horizon's goal of becoming a standalone gold producer in the Kalgoorlie Region.
The Company previously worked with BDO Global to conduct an analysis of the business to identify opportunities
to improve the Company’s ESG performance. Materiality surveys were completed for both internal and external
stakeholders and completed a workshop to map the opportunities and generate an initial sustainability report. The
aim of the process is to develop systems and processes to ensure we meet or exceed our social license to operate
and adopt the sustainability report covering current and future activities.
Corporate/Finance
Total cash at bank as at 31 December 2025 was $37.5 million. In addition, the Company holds investments in
ASX listed companies with value as at 31 December 2025 of approximately $1.8 million (Table 4).
On 15 December, the Company announced the appointment of Mr Christian Price as General Manager Corporate
Development.
In accordance with ASX Listing Rule 5.3.5, approximately $183,595 was paid to related parties or their associates
during the quarter, comprising Director fees and statutory superannuation.
Horizon held its Annual General Meeting during the quarter. All resolutions were passed at the AGM reflecting
continued confidence in the Board and management.
During the quarter Nebari LLC converted the remainder of it’s US$5 million Convertible Loan Facility resulting in
the issue of 49,215,850 (pre-consolidation) fully paid ordinary shares and Horizon becoming debt free.
During the quarter the consolidation of the Company’s issued capital on a fifteen (15) to one (1) basis, as approved
by shareholders at the Annual General Meeting held 28 November 2025 was completed. The Company’s post-
consolidation capital structure as at 31 December 2025 is set out in Table 3.
Table 3: Capital Structure at 31 December 2025
ASX Code Class of Securities On issue 31 December 2025
HRZ Fully Paid Ordinary Shares 205,456,013
HRZAN Performance Rights 1,804,622
HRZAO Unlisted Options Expiring 03 Sep 2026 Exercisable at $0.7785 1,181,681
HRZAA Unlisted Options Expiring 30 Sep 2028 Exercisable at $1.80 400,002
Table 4: Listed Company Investments
Company
Number of shares
held
Value 31 December 2025
Richmond Vanadium Technology 19,833,363 $1,547,002
Metal Hawk Limited 1,134,430 $113,443
Dundas Minerals Limited 3,234,327 $139,076
TOTAL $1,799,521
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 12
Authorised for release by the Board of Directors.
For further information, please contact:
Grant Haywood Michael Vaughan
Managing Director and CEO Investor and Media Relations – Fivemark
grant.haywood@horizonminerals.com.au michael.vaughan@fivemark.com.au
+61 8 9386 9534 +61 422 602 720
JOIN HORIZON MINERALS INTERACTIVE HUB
Visit https://investors.horizonminerals.com.au/auth/signup for
Horizon Minerals’ Interactive InvestorHub
Horizon Minerals
Email: info@horizonminerals.com.au
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 13
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements. They include
indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward looking
statements include, but are not limited to, statements preceded by words such as “planned”, “expected”,
“projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”,
“conceptual” and similar expressions. Forward looking statements, opinions and estimates included in this
announcement are based on assumptions and contingencies which are subject to change without notice, as are
statements about market and industry trends, which are based on interpretations of current market conditions.
Forward looking statements are provided as a general guide only and should not be relied on as a guarantee of
future performance. Forward looking statements may be affected by a range of variables that could cause actual
results to differ from estimated results and may cause the Company’s actual performance and financial results in
future periods to materially differ from any projections of future performance or results expressed or implied by
such forward looking statements. These risks and uncertainties include but are not limited to liabilities inherent in
mine development and production, geological, mining and processing technical problems, the inability to obtain
any additional mine licenses, permits and other regulatory approvals required in connection with mining and third
party processing operations, competition for among other things, capital, acquisition of reserves, undeveloped
lands and skilled personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations and/or the
transportation of mineral products, including labour stoppages and severe weather conditions, the demand for
and availability of transportation services, the ability to secure adequate financing and management’s ability to
anticipate and manage the foregoing factors and risks. There can be no assurance that forward looking statements
will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current ASX Listing
Rules.
The Company believes that it has a reasonable basis for making the forward-looking statements in the
announcement, including with respect to any production targets and financial estimates, based on the information
contained in this and previous ASX announcements.
Aspirational Statement
The Company’s vision to be a ~100kozpa producer are aspirational statements (and not production targets) and
the Company does not have reasonable grounds to believe this can be achieved. These statements are of an
aspiration nature as the vision to be a ~100kozpa producer is dependent on several factors including the
exploration success, ore reserves and mineral resources definition, feasibility studies and development of an
extended mine plan.
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 14
APPENDICES
ASX ANNOUNCEMENTS
Dec-25
31st Lake Johnston Formal Sale Agreement Executed
24th Feasibility Study Update
23rd Application for quotation of securities - HRZ
17th Ultra High-Grades Returned in Burbanks Phase 1 Drilling
15th Senior Management Appointment
12th BC8: Black Cat Acquires Strategic Tenements Near Lakewood
11th Completion of Consolidation
8th Land Use Agreement Signed With Marlinyu Ghoorlie
3rd Change of Director's Interest Notice x4
3rd Notification regarding unquoted securities - HRZ
Nov-25
28th Results of Annual General Meeting
28th AGM Presentation
21st Application for quotation of securities - HRZ
21st Gold Mining and Processing Update
18th Investor Webinar Registration
14th Horizon to divest Lake Johnston for $35M
11th Cleansing Notice
11th Completion of Gordons Dam Project Acquisition
11th Application for quotation of securities - HRZ
4th Cleansing Notice
4th Application for quotation of securities - HRZ
4th Application for quotation of securities - HRZ
Oct-25
27th Application for quotation of securities - HRZ
27th Notice of Share Consolidation
27th Consolidation/Split - HRZ
27th Letter to Shareholders AGM 2025
27th Notice of Annual General Meeting/Proxy Form
21st IMARC Investor Presentation
20th Quarterly Cash Flow Report 30 September 2025
20th Quarterly Activities Report 30 September 2025
20th Appendix 4G and Corporate Governance Statement
20th Annual Report to shareholders
13th Application for quotation of securities - HRZ
6th Burbanks Drilling Returning Spectacular Grades
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 15
TENEMENT SCHEDULE
Prospect/Tenement Notes
Percentage interest
held at the end of the
quarter
Percentage
interest acquired
during the quarter
Percentage interest
disposed during the
quarter
WESTERN
AUSTRALIA
BINDULI
L26/261 100% - -
M26/346 100% - -
M26/499 100% - -
M26/549 100% - -
M26/621 100% - -
P26/4256 0% - 100%
P26/4579 100% - -
P26/4580 100% - -
MLA26/855 100% - -
BLACK FLAG
E26/220 100% - -
P24/5145 0% - 100%
P24/5146 0% - 100%
P24/5150 0% - 100%
P24/5155 0% - 100%
P24/5156 0% - 100%
P24/5157 0% - 100%
P24/5158 0% - 100%
P24/5160 0% - 100%
P24/5348 100% - -
P24/5415 100% - -
P24/5637 100% - -
WESTERN
AUSTRALIA
BLACK FLAG
P24/5638 100% - -
P24/5639 100% - -
P24/5640 100% - -
BRIDGETOWN-
GREENBUSHES
E70/5980 100% - -
E70/5981 100% - -
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 16
Prospect/Tenement Notes
Percentage interest
held at the end of the
quarter
Percentage
interest acquired
during the quarter
Percentage interest
disposed during the
quarter
E70/6551 100% - -
ELA70/6552 0% - 100%
ELA70/6553 0% - 100%
E70/6554 100% - -
ELA70/6555 0% - 100%
CANNON
E25/349 100% - -
E25/543 100% - -
E25/564 100% - -
L25/48 100% - -
L25/50 100% - -
L25/51 100% - -
M25/182 100% - -
M25/327 100% - -
M25/329 100% - -
M25/330 100% - -
M25/333 100% - -
M25/357 100% - -
P25/2449 0% - 100%
P25/2633 100% - -
P25/2670 100% - -
P25/2733 100% - -
P25/2748 100% - -
P25/2755 100% - -
P25/2761 100% - -
CHADWIN
P16/3121 100% - -
P16/3121 100% - -
COOLGARDIE
E16/589 100% - -
E16/590 100% - -
E16/591 100% - -
E16/592 100% - -
LA15/429 0% - 100%
LA15/430 0% - 100%
QUARTERLY REPORT DECEMBER 2025
horizonminerals.com.au Page | 17
Prospect/Tenement Notes
Percentage interest
held at the end of the
quarter
Percen