Equity Raise Presentation
Released
Released
Announcement PDF
Australia's Next
Standalone Gold
Producer in the
Heart of WA
Goldfields
Not for release to US wire services or distribution in the
United States
17 February 2026
Important disclaimers
Nature of Document
This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders, related
bodies, corporate, partners, affiliates, employees, representatives or advisers, make any representation or warranty
(express or implied) as to the accuracy, reliability, relevance or completeness of the material it contains. Nothing contained
in the Presentation is, or may be relied upon, as a promise, representation or warranty, whether as to the past or the future,
and the Company hereby excludes all warranties that can be excluded by law.
The Presentation
The presentation contains ‘forward-looking statements’. By their nature, forward-looking statements involve known and
unknown risks, uncertainties and other factors because they relate to events and depend on circumstances that may or
may not occur in the future, and assumptions which may or may not prove to be correct (and may be beyond the
Company’s ability to control or predict), any (or all) of which may cause the actual results or performance of the Company
to be materially different from the results or performance expressed or implied by such forward-looking statements.
No representation is made that any forward-looking statement will come to pass, that any forecast result will be achieved,
or that any assumption on which a forward-looking statement is based is reasonable. Forward-looking statements are made
as at the date of this Presentation, and the Company disclaims any obligation or undertaking to release any update of, or
revision to, any forward-looking statement contained in this Presentation. contains information relating to Mineral
Resources estimates and Ore Reserves estimates. All persons reviewing this Presentation should refer to the JORC
resource statements and competent person confirmations in the Appendix to this Presentation (Slide 47).
Summary Information
The material contained in this Presentation is a summary and for information purposes only. The information in this
Presentation is general in nature and does not purport to be accurate nor complete, nor does it contain all of the
information that an investor may require in evaluating a possible investment in the Company, nor does it contain all the
information which would be required in a disclosure document or prospectus prepared in accordance with the requirements
of the Corporations Act 2001 (Cth) (Corporations Act). It has been prepared by the Company with due care but no
representation or warranty, express or implied, is provided in relation to the accuracy, reliability, fairness or completeness of
the information, opinions or conclusions in this Presentation by the Company or any other party involved in its preparation.
Reliance should not be placed on information or opinions contained in this Presentation and, the Company does not have
any obligation to finalise, correct or update the content of this Presentation. Certain data used in this Presentation may
have been obtained from research, surveys or studies conducted by third parties, including industry or general
publications.
To the maximum extent permitted by law, the Company is not responsible for updating, nor undertakes to update, this
Presentation. It should be read in conjunction with the Company’s other periodic and continuous disclosure
announcements lodged with the ASX, which are available at www.horizonminerals.com.au/announcements/. The SPP offer
will be made on the basis of the information contained in the share purchase plan offer booklet (SPP Booklet) to be
prepared for eligible shareholders and will be available following its lodgement with ASX. Any eligible shareholder who
wishes to participate in the SPP should consider the SPP Booklet before deciding whether to apply for new shares under
the SPP. Anyone who wishes to apply for new shares under the SPP will need to apply in accordance with the instructions
contained in the SPP Booklet.
Not an offer
This Presentation is not an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities
in the Company and neither this Presentation nor anything contained in it shall form the basis of any contract or
commitment. This Presentation is not a prospectus, product disclosure statement or other offering document under
Australian law or any other law and will not be lodged with the Australian Securities and Investments Commission. This
Presentation may not be released to US wire services or distributed in the United States. This Presentation does not
constitute an offer to sell, or the solicitation of an offer to buy, any securities in the United States or any other jurisdiction in
which such an offer would be unlawful. The shares being offered and sold under the Placement and SPP have not been,
and will not be, registered under the U.S. Securities Act of 1933, (U.S. Securities Act) or the securities laws of any State or
other jurisdiction of the United States. The shares issued under the Offer may not be offered or sold in the United States
except in transactions exempt from, or not subject to, the registration requirements of the U.S. Securities Act and any other
applicable U.S. state securities laws.
The distribution of this Presentation (including an electronic copy) in the United States and elsewhere outside Australia may
be restricted by law. If you come into possession of this presentation, you should observe such restrictions. Any non-
compliance with these restrictions may contravene applicable securities laws. Refer to the International Offer Restrictions
on Slides 42-44 of this Presentation for more information.
Not financial product advice This Presentation, and the information provided in it, does not constitute, and is not intended to
constitute, financial product or investment advice, financial, legal, tax accounting or other advice, or a recommendation to
acquire shares (or any other securities) of the Company and does not and will not form any part of any contract for the
acquisition of shares being offered under the Placement and SPP. It has been prepared without taking into account the
objectives, financial or tax situation or particular needs of any individual
Professional Advice recommended
This Presentation has been prepared without taking into account the objectives, financial or tax situation or particular needs
of any individual. All persons reviewing this Presentation should consider seeking appropriate professional advice before
making any investment decision. Neither the provision of the Presentation nor any information contained in the
Presentation or subsequently communicated to any person in connection with the Presentation is, or should be taken as,
constituting the giving of investment advice to any person.
JORC Code
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply
with the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC
Code). Investors outside Australia should note that while Ore Reserve and Mineral Resource estimates of the Company in
this presentation comply with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore
Reserves" and "Mineral Resources" respectively), they may not comply with the relevant guidelines in other countries and,
in particular, do not comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the
Canadian Securities Administrators (the "Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which
governs disclosures of mineral reserves in registration statements filed with the US Securities and Exchange Commission.
Information contained in this document describing mineral deposits may not be comparable to similar information made
public by companies subject to the reporting and disclosure requirements of Canadian or US securities laws. You should
not assume that quantities reported as “resources” will be converted to reserves under the JORC Code or any other
reporting regime or that the Company will be able to legally and economically extract them.
Not an offer
This Presentation is not and should not be considered an offer, invitation or recommendation to acquire, subscribe for or
sell any New Shares or any other securities or financial products in any jurisdiction and does not and will not form any part
of any contract for the acquisition of New Shares.
This Presentation may not be released to U.S. wire services or distributed in the United States. This Presentation does not
constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States or any other jurisdiction. The
New Shares have not been, and will not be, registered under the U.S. Securities Act of 1933 (the U.S. Securities Act) or the
securities laws of any state or other jurisdiction of the United States. Accordingly, the New Shares may not be offered or
sold, directly or indirectly, in the United States except in transactions exempt from, or not subject to, the registration
requirements of the U.S. Securities Act and any applicable securities laws of any state or other jurisdiction of the United
States. The distribution of this Presentation in the United States and elsewhere outside Australia may be is restricted by
law. Persons who come into possession of this Presentation should observe any such restrictions, including those set forth
in the “International Offer Restrictions" section of this Presentation, as any non-compliance could contravene applicable
securities laws.
Authorised for release to the ASX by the Board of Directors of Horizon Minerals Ltd.
2
Important disclaimers
Forward Looking and Cautionary Statement
As noted above, some statements in this Presentation regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions.
Forward looking statements, opinions and estimates included in this Presentation are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions.
Forward looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward looking statements may be affected by a range of variables that could cause actual results to differ from estimated results, and may cause the
Company’s actual performance and financial results in future periods to materially differ from any projections of future performance or results expressed or implied by such forward looking statements. These risks and uncertainties include but are not limited to liabilities inherent in mine
development and production, geological, mining and processing technical problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals required in connection with mining and third party processing operations, competition for among other things, capital,
acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various events which could disrupt operations and/or the transportation of mineral products,
including labour stoppages and severe weather conditions, the demand for and availability of transportation services, the ability to secure adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There can be no assurance that forward looking
statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements in relation to future matters that can only be made where the Company has a reasonable basis for making those statements. The forward looking statements in this
Presentation are based on current expectations, estimates, forecasts and projections about the Company and the industry in which it operates. They do, however, relate to future matters and are subject to various inherent risks and uncertainties. Actual events or results may differ materially
from the events or results expressed or implied by any forward looking statements. The past performance of the Company is no guarantee of future performance. You are cautioned not to place undue reliance on any forward looking statement. The forward looking statements in this
Presentation reflect views held only as at the date of this Presentation.
None of Horizon Minerals Limited or its directors, officers, employees, agents or contractors makes any representation or warranty (either expressed or implied) as to the accuracy or likelihood of fulfilment of any future looking statement, or any events or results expressed or implied in any
forward looking statement, except to the extent required by law. The Company believes that it has a reasonable basis for making the forward looking statements in the Presentation, including with respect to any production targets and financial estimates, based on the information contained in
this and previous ASX announcements.
Aspirational Statement
The Company’s vision to be a ~100kozpa producer in this presentation are aspirational statements (and not a production targets) and the Company does not have reasonable grounds to believe this can be achieved. These statements are of an aspiration nature as the vision to be a ~100kozpa
producer is dependent on several factors including the exploration success, ore reserves and mineral resources definition, feasibility studies and development of an extended mine plan.
Mineral Resources and Ore Reserves
This Presentation contains estimates of the Company's Mineral Resources and Ore Reserves – refer to Slide 47. The information in this Presentation that relates to the Company’s Mineral Resources and Ore Reserves has been extracted from the Company's previous ASX announcements
including: 1. ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026 and 2ASX announcement “Gold Ore Reserve Update” dated 17 February 2026. Copies of these announcements are available at www .asx.com.au or horizonminerals.com.au/announcements. The
Company confirms that it is not aware of any new information or data that materially affects the information included in those announcements and, in relation to the estimates of the Company’s Mineral Resources and Ore Reserves, that all material assumptions and technical parameters
underpinning the estimates in the announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from those announcements.
Production Targets
This Presentation contains production targets and forecast financial information derived from those production targets (including in respect of all-in sustaining costs and capital costs). The information in this Presentation is underpinned by 17% Inferred and73% Measured and Indicated Mineral
Resources as detailed in the ASX Announcement "ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated17 February 2026. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further
exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. The stated production targets are based on the Company's current expectations of future results or events and should not be solely relied upon by investors when
making investment decisions. Further evaluation work and appropriate studies are required to establish sufficient confidence that targets can be achieved. The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX
announcements relating to the Company’s published production targets. All material assumptions and technical parameters underpinning the production targets or forecast financial information derived from production targets (as applicable) in the relevant ASX announcement continue to apply
and have not materially changed.
No liability
This Presentation has been prepared by the Company in good faith, based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. To
the maximum extent permitted by law, each of the Company and its related bodies corporate, and their respective its directors, employees, agents and advisers:
1. expressly disclaims any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of or reliance on information contained in this presentation including representations or warranties or in relation to the accuracy or
completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied, contained in, arising out of or derived from, or for omissions from, this presentation including, without limitation, any financial information, any estimates or projections and any
other financial information derived therefrom, whether by way of negligence or otherwise;
2. expressly excludes and disclaims all liabilities in respect of, makes no representations regarding, any part of this Presentation and make no representation or warranty as to the currency, accuracy, adequacy, reliability or completeness or fairness of any statements, estimates, options,
conclusions or other information contained in this Presentation; and
3. expressly excludes and disclaim all liability, for any expenses, losses, damages or costs incurred by you as a result of your participation in the Offer and the information in this Presentation being inaccurate or incomplete in any way for any reason, whether by negligence or otherwise.
Statements made and information presented in this Presentation are made and presented only as at the date of this Presentation, and is current as at the date of this Presentation (unless otherwise indicated). The information in this Presentation remains subject to change without notice. The
Company reserves the right to withdraw the Offer or vary the timetable for the Offer at any time before the issue of the relevant securities without notice
3
Investment proposition
Gold production from Black Swan Processing Hub fully funded
post raising2
4
An attractively priced West Australian gold
developer with near-term growth
Esperance
Albany
Geraldton
Perth
Black Swan Processing Hub
2.2Mtpa (currently in C&M) with pathway
to refurbish / convert to gold processing
Mineral Resource Estimate1
1.9Moz 34.3Mt @ 1.7g/t Au
Regional Landholding
+1,300km²
Projects
20.2Moz Ag 104kt Zn
Carnarvon
Positive Studies support development of a gold
operation producing +100koz p.a. from a refurbished
Black Swan Processing Hub
Expedited, low capital, hub-and-spoke model which
leverages existing 100%-owned infrastructure
Targeting high-margin gold production from Black Swan
starting in mid-2027
1.9Moz1 MRE with major drilling program underway – better
definition & extension of mineable ounces & testing new regional targets
Kalgoorlie
1. Refer ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026 and refer to Table on page 34.
2. Fully funded including existing cash and expected cash inflows from operations and Lake Johnston sale.
.
Positive Black Swan Study Results
and Equity Raising
Positive Black Swan study results – a low capital intensity pathway to +100kozpa
• Pre-production capital – A$160.5M & ~A$1,500/oz capital intensity
• Payback – 18 months from plant commissioning1
• NPV / IRR – Project pre-tax NPV8 ~A$631M & Project IRR 83%1
• Production – average ~102kozpa
• Operating Cost – C1 A$2,852/oz & AISC A$3,353/oz
Fully funded to refurbish Black Swan plant and commence mining and gold production2
• Placement – A$175M underwritten3 two tranche, with ability to accept oversubscriptions, at
A$1.08 per share SPP – Up to A$10M4
Expedited path to Black Swan first production mid-2027
• Infrastructure – low risk entry to +100kozpa via existing plant (replacement value +A$200M)
& Kalgoorlie location
• Approvals – major approvals in place with construction from mid-2026
Near term accretive opportunities under assessment5
5
Fully funded to refurbish Black Swan Processing Hub and
commence mining and gold production
1. A$5,500 gold price.
2. Fully funded including existing cash and expected cash inflows from operations and Lake Johnston sale.
3. Refer to Page 44-46 for summary Underwriting Agreement.
4. The Company reserves the right to accept oversubscriptions under the SPP or place any SPP shortfall. The SPP is not currently intended to be underwritten.
5. The Company is considering accretive opportunities that may extend mine life and may include joint ventures, toll milling, ore purchase arrangements, asset purchases
or other corporate transactions.
Equity Raising
Fully fund the path to standalone gold production
6
Equity Raising Overview
7
$175M two tranche placement and share purchase plan to fully fund path to standalone gold production
Offer Structure and
Size
• A$175 million two tranche placement (Placement), with the ability to accept oversubscriptions comprising:
• A$55 million under the Company’s placement capacity under ASX Listing Rule 7.1 and 7.1A; and
• A$120 million to be issued subject to shareholder approval at a General Meeting of the Company to be
held on or around 7 April 2026.
• Up to A$10 million share purchase plan (SPP) at the same price as the Placement1.
• The Placement is fully underwritten2.
Offer Price
• A$1.08 per share presenting3
• 12.6% discount to the last closing price of A$1.235 as at 16 February 2026
• 14.4% discount to the 5-day volume weighted average trading price of A$1.262 to 16 February 2026
Use of Funds
• Black Swan Processing Hub refurbishment & conversion, site establishment and infrastructure, open pit &
underground capital works and working capital.
Refer to Page 8 for further information.
Ranking • New Shares will rank equally with existing shares from issue
Broker Syndicate
• Petra Capital – Sole Lead Manager, Bookrunner and Underwriter
• Euroz Hartleys – Co-Manager
1. The SPP is not currently intended to be underwritten. The Company reserves the right to accept oversubscriptions under the SPP or place any SPP shortfall.
2. Refer to page 44-46 for summary of Underwriting Agreement.
3. Source IRESS.
Equity Raising – Sources and Uses of Funds
• Black Swan Processing Hub refurbishment and
gold conversion including
• Refurbishment & installation
• Offsite & onsite road upgrades
• Standalone diesel power station
• Site establishment and infrastructure
refurbishment including
• Re-establishing diesel fuel storage & site
power
• Plant office infrastructure, IT and
communications
• Open pit & underground capital
• Mine site establishing
• Pre-strip & decline capital
8
Funding will enable the refurbishment of Black Swan and commencement of mining and gold production
1. Lake Johnston completion payment of A$20m received on 13 February 2026.
2. Excludes proceeds from up to A$10m SPP. Any funds raised under the SPP will be applied to working capital.
Sources of Funds A$M
Existing cash (unaudited 31 Dec 25) 37.5
Lake Johnston completion payment1 20.0
Gross proceeds from Placement 175.0
Total Source of Funds2 232.5
Uses of Funds A$M
Black Swan Processing Hub 101.0
Site & infrastructure 45.6
Open Pit – pre-production 7.4
Underground – pre-production 6.4
Exploration / Geology 5.6
Pre-production operating costs & operational
readiness
31.3
Black Swan capex contingency 20.0
Other working capital, cash buffer & Offer costs 15.2
Total Use of Funds1 232.5
Equity Raising Timetable
9
SPP Record Date 16 February 2026
Offer Announcement 17 February 2026
Trading halt lifted and announcement of
completion of Institutional Placement
19 February 2026
Tranche One Placement Settlement Date 24 February 2026
Tranche One Placement Allotment Date 25 February 2026
SPP Closing Date 10 March 2026
SPP Shares Issued 17 March 2026
General Meeting On or around 7 April 2026
Tranche Two Placement Settlement Date 13 April 2026
Tranche Two Placement Allotment Date 14 April 2026
1. Refer to page 44-46 for summary of Underwriting Agreement.
2. Source IRESS.
Note timetable is indicative only and may be subject to change at the sole discretion of the Company with the agreement of the Underwriter.
Company Overview
A$175M two tranche placement and share purchase
plan to fully fund the path to standalone gold production
10
0
2
4
6
8
10
$0.00
$0.50
$1.00
$1.50
$2.00
Feb-25 Apr-25 Jun-25 Aug-25 Oct-25 Dec-25 Feb-26
Million
Volume Price
Horizon Minerals – at a glance
11
An attractively priced West Australian gold developer with near-term growth
Capital structure (Pre Offer) Units Current
Share price A$/sh 1.235(1)
Ordinary shares M 205.5(1)
Options and performance rights M 4.6(1)
Market capitalisation A$M 254.8
Cash and cash equivalents A$M 37.5(2)
Debt A$M Nil(2)
Enterprise value A$M 216.3
1. At 16 February 2026.
2. At 31 December 2025. Excludes listed investments with a value of ~A$1.8M.
3. At 30 June 2025.
Warren Hallam
Non-Executive Director
Brendan Shalders
Chief Financial Officer
Adrianna Skok-Muir
Group Mining Engineer
Rob Waugh
Non-Executive Director
Isabel Macchia
Company Secretary
Dirk Richards
Project Manager
High net worth,
retail and other
Golden Crane
Holdings
Directors and
Management
Institutions
Indicative Share Register
*Indicative
Research Coverage
Adjusted to match share structure and volume post 15-to-1 capital consolidation effective 9 December 2025
Horizon Minerals – Board and Management
12
Key experience in operations and value delivery
Ashok Parekh
Non-Executive Chair
Grant Haywood
Managing Director
Rob Waugh
Non-Executive Director
Warren Hallam
Non-Executive Director
Christian Price
GM Corporate
Development
Brendan Shalders
CFO/Joint CoSec
Stephen Guy
Chief Geologist
Adrianna Skok-Muir
Group Mining
Engineer
Isabel Macchia
Company Secretary
Project portfolio
• Large 1,309km2 land package in an attractive
geological setting centred around Kalgoorlie /
Coolgardie
• 1.9Moz Group Mineral Resource1 (34.3Mt @
1.7g/t Au) – ~50% contained within the
cornerstone Burbanks and Boorara deposits
• 2.2Mtpa Black Swan processing plant –
standalone processing hub to unlock the value
of the significant resources base
• February 2026 studies define five year mine
plan from 10 key deposits with strong potential
for mine life extensions
• Additional value and optionality from the
Nimbus Silver-Zinc deposit (contains
20.2Moz Ag, 104kt Zn, and 77koz Au) located
44km from Black Swan – High grade
13
Strategically constructed gold portfolio centered around major geological structures
1. Refer ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026 and Table on page 34.
Our Strategy
14
An attractively priced West Australian gold developer with near-term growth
2027 onwards
First Black Swan gold production
by mid-2027
Now
Production readiness and de
risking
Next 12 months
Black Swan refurbishment and gold
processing conversion
Mining commencement late 2026
All elements in place to support aspirational target to become a ~100kozpa GOLD producer*
Production
Growth
Studies
Upgrade and extend Mineral
Resources
Extend initial +5 year mine life
Grow Mineral Resources and drill test new
exploration targets
Value accretive M&A
Black Swan studies complete
and FEED Studies Underway
Nimbus silver and zinc
production at Black Swan studies
complete
Multiple individual PFS Study updates
Combined PFS Study update
Commence Nimbus studies & drill target
*This is an aspirational statement (and not a production target), the Company does not yet have reasonable grounds to believe the vision can be achieved.
Refer to the Aspirational Statements section in the Disclaimers section of this presentation for further information.
Study Outcomes
Black Swan Processing Hub Studies present positive
results and warrant project advancement
15
Studies Summary
Low capex and capital intensity
• Existing infrastructure replacement value +A$200M
• Total pre-production capital requirement of A$160.5M
• Attractive capital intensity of ~A$1,500/oz of annual production
16
Baseline outcomes expected to be enhanced as further drilling and mining studies are completed
1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
2. Refer ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026.
3. Refer ASX Announcement “Gold Ore Reserve Update” dated 17 February 2026.
Approximate 102koz p.a. production profile
• Total 545koz produced under current mine plan
• C1 Operating Cost A$2,852/oz (approximate)
• AISC A$3,353/oz (approximate)
Robust project economics at A$5,500/oz gold price
• Total revenue of ~A$3BN & EBITDA of ~A$1.26BN
• Free cashflow (pre-tax) of approximately A$959M
• Pre-tax Project NPV8 of approximately A$631M
• Project IRR of approximately 83%
• Payback period of 18 months from start of plant commissioning
Mineral Resource and
Share your feedback
Discover