Quarterly Activities Report 30 June 2025
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
31 JULY 2025
QUARTERLY ACTIVITIES REPORT FOR THE
PERIOD ENDED 30 JUNE 2025
HIGHLIGHTS
•
Steady state safe gold production and revenue from Boorara and Phillips Find via the
existing ore sale and toll milling agreements
o
Boorara Operations mined ~298k dry tonnes at 0.952 g/t mined for 6,446 oz sold
during the June Quarter at an average gold price of $5,104/oz, generating ~$33
million in revenue
o
Ore processed from Phillips Find consisted of 18,676 dry tonnes at 1.97 g/t for
1,132 oz sold at an average price of $5,139/oz, generating ~$5.8 million to the
Phillips Find JV
•
Commencement of the Burbanks Resource Definition drilling programme south of
Coolgardie
•
GR Engineering awarded Black Swan plant engineering study to refurbish and repurpose
the processing facility into a gold plant
•
Life of mine plan studies targeting long term Black Swan Project (BSP) mine feed
commenced by external mining consultants
•
Appointment of experienced mining executive to the Horizon Minerals Board 1
•
Successful $30m two tranche placement with a general meeting held on 10 July 2025
with all resolutions passed including Tranche 2 for ~$18.2 million of the placement.
SEPTEMBER QUARTER ACTIVITIES
1
•
Continued safe gold production and revenue from Boorara and Phillips Find via the
existing ore sale and toll milling agreements.
•
Continuation of process engineering and life of mine studies for the Black Swan Project
mine feed.
•
Ongoing drilling of the Burbanks Resource Definition drill programme.
As announced to the ASX on 1 May 2025
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
HRZ QUARTERLY JUNE 2025
OVERVIEW
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to provide the June
2025 Quarterly Activities Report. Horizon is a gold production and exploration company within
the Kalgoorlie and Coolgardie regions of Western Australia (Figure 1).
Horizon Minerals key objective is near term gold production and exploration upside within our
large tenement package of 1,309 km2. In addition to 1.8Moz of gold resources, the Company
holds a number of multi-commodity assets including the 20.2Moz Ag Nimbus silver-zinc project.
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Activities during the quarter focussed on delivering steady state production from the Company’s
Boorara gold operation, located east of Kalgoorlie, and through the Phillips Find gold project to
the north-northwest of Coolgardie. First gold pour was achieved during the March quarter, from
both Boorara and Phillips Find through separate milling agreements with Paddington Mill and
FMR Investments’ Greenfields Mill respectively, with production ramping up in the June quarter.
Work commenced on the Burbanks drilling programme, as well as generating a long-term
exploration target pipeline and increasing exploration personnel. There was minimal emphasis
on in-ground exploration drilling during the quarter as resources and expenditure remained
focussed on establishing steady state production and saleable ore stockpiles at Boorara and
Phillips Find and generating cashflow for the Company.
Page 2 of 26
HRZ QUARTERLY JUNE 2025
MINE DEVELOPMENT AND OPERATIONS
The Company is successfully executing its strategy of bringing its extensive gold assets into
production and generate strong cashflows in current times of record high gold prices with its
Boorara and Phillips Find Gold Projects both achieving steady state production during the June
quarter following first delivery of Phillips Find ore to the Greenfields Mill for processing and first
gold pour during the March quarter. 2
Boorara Gold Project
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1 km southwest of the Nimbus Silver-Zinc Project site where established offices
are connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
The Mineral Resource Estimate (JORC 2012) for Boorara is shown in Table 1 below:
Table 1: Boorara Mineral Resource Estimate 3
Boorara at 0.5 g/t lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
Measured
Resource category
1.12
1.22
Gold Metal (Oz)
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
The Ore Reserve for Boorara is shown in Table 2 below.
Table 2: Boorara Ore Reserve 4
Location
Boorara Open Pit
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
The Company is not aware of any new information or data that materially affects the information
presented and that the material assumptions and technical parameters underpinning the Boorara
Ore Reserve Study continue to apply and have not materially changed.
2
As announced to the ASX on 31 March 2025.
3 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
4 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
Page 3 of 26
HRZ QUARTERLY JUNE 2025
Table 3: Quarterly production data *
Boorara Gold
Project
UoM
Jul-Sep
Oct-Dec
Jan-Mar
Apr-Jun
Qtr. 1
Qtr. 2
Qtr. 3
Qtr. 4
FY25 YTD
MINING & HAULAGE
Mined
Ore Mined
tonnes
-
112,212
195,727
298,042
605,981
Mined Grade [est.]
gr/t
-
0.838
0.954
0.952
0.932
Gold Mined
oz
-
3,024
6,005
9,125
18,154
tonnes
-
27,936
72,354
221,299
321,589
Hauled Grade [est.]
gr/t
-
0.798
0.880
0.936
0.911
Gold Hauled
oz
-
717
2,047
6,659
9,423
Hauled
Ore Hauled
PROCESSING & REVENUE
Milled
Ore Milled
tonnes
-
6,242
71,744
227,661
305,647
Milled Grade
gr/t
-
0.798
0.842
0.907
0.889
Contained Gold
oz
-
160
1,941
6,636
8,737
Gold Produced
oz
-
-
1,163
6,446
7,609
Average Price
A$/oz
-
-
4,256
5,104
4,975
Revenue
$AM
-
-
4.9
33
37.9
Sales
* The above table of production data was unaudited as at the time of this report.
During the quarter mining and ore haulage from Boorara continued to progress at steady state
with ~298k dry tonnes at 0.952 g/t mined for 6446 oz of gold ore sold in the June Quarter at an
average gold price of $5,104/oz, generating ~$33 million in revenue (Figure 2). Boorara has
continued to deliver ore as per the corporate plan during the June quarter.
In addition to the ore treated at and hauled to the Paddington Mill during the quarter, by the end
of the quarter the Company had generated ~200 kt of high-grade ore stocks on the Boorara
and/or Paddington ROM pads, plus ~90 kt of lower-grade ore stockpiled at Boorara.
Page 4 of 26
HRZ QUARTERLY JUNE 2025
Figure 2: Loading ore at Boorara to transport to the Paddington Mill
Phillips Find Project
The project is centred 45km north-northwest of Coolgardie (Figure 1) covering over 10km strike
of prospective greenstone stratigraphy, and includes the Phillips Find Mining Centre (PFMC)
where approximately 33,000oz of gold was produced between 1998 and 2015 from three open‐
pit operations; Bacchus Gift, Newhaven and Newminster.
Under the Joint Venture (JV) Agreement between Horizon Minerals and BML Ventures Pty
Limited (BML), all management, technical, operational and maintenance roles will be undertaken
by BML with oversight by the Company. This is a low financial risk JV structure with BML to fund
all project costs. Net cashflow after the asset recovery and repayment of costs to be split 50/50
between Horizon and BML. This allows Horizon to focus 100% on delivering its Boorara gold
project.
During the June 2025 quarter, continued steady state production has been achieved from the
Newhaven and Newminster open pits (Figure 3 and Figure 4) with completion of the first
processing campaign of ore from the Phillips Find JV with BML under the 200,000t Toll Milling
Agreement with FMR Investments Pty Ltd (FMR) to treat Horizon ore from February to July 2025
at the Greenfields Mill. The ore processed from Phillips Find consisted of 18,676 dry tonnes at
1.97 g/t for 1,132 oz at an average price of $5,139/oz, generating ~$5.8 million to the Phillips
Find JV.
Page 5 of 26
HRZ QUARTERLY JUNE 2025
Figure 3: Mining the Newhaven pit at Phillips Find
Figure 4: Mining the Newminster pit at Phillips Find
Page 6 of 26
HRZ QUARTERLY JUNE 2025
Black Swan Project Update
During the quarter, Horizon appointed GR Engineering Services (GRES) to undertake a PreFeasibility Study (PFS) for the conversion of the Black Swan processing plant from nickel to gold.
The study is progressing well and remains on track for completion in the December 2025 quarter.
GRES commenced the PFS with trade-off studies to confirm the optimum configuration of the
comminution circuit for gold processing. The work assessed the SAG mill operation (SS-SAG),
as proposed in the previous Poseidon Nickel DFS, and confirmed the existing circuit is
appropriately sized to process the softer Horizon gold ores at a minimum sustainable rate of 1.5
million tonnes per annum.
The PFS is broadly focused on two core areas: a (brownfields) upgrade of the existing
comminution circuit and the design of a new (greenfields) gravity and CIL circuit to support gold
processing. The existing flotation circuit from the original nickel processing plant will be retained
in care and maintenance, preserving flexibility for future nickel or flotation-based gold operations.
To date, the PFS has delivered process design criteria, preliminary flowsheets, equipment lists,
and layout concepts, all of which are currently under review.
In parallel, Horizon has engaged a range of specialist consultants and engineering firms to
progress early-stage engineering, scoping studies, and technical investigations across key
infrastructure areas including power supply, water supply, site roads, haulage corridors, tailings
storage, accommodation, and communications. These groups are actively reviewing and
validating infrastructure assumptions, conducting gap analyses, and ensuring alignment with the
proposed processing plant design. This work is a key part of Horizon’s strategy to de-risk
development and ensure that infrastructure planning is technically robust and fully integrated into
the broader project.
Figure 5: Black Swan processing plant
Page 7 of 26
HRZ QUARTERLY JUNE 2025
EXPLORATION AND EVALUATION
A programme of extensional and infill drilling commenced during the quarter at the company’s
Burbanks Project south of Coolgardie (Figure 1). 5 Drilling will be conducted over two phases of
RC (pre-collars) and diamond drill (tails) programs for a total of 30,000 planned drill metres in
key areas to enhance resource continuity and confidence to enable future conversion to an Ore
Reserve as well as targeted extensional drilling of known high grade lodes.
Guided by the phase 1 results, the second phase of drilling will target down-dip and strike
extensions of known high-grade lodes, aiming to further expand and grow the resource base.
The exploration strategy also includes targeting the projected extensions of the recently identified
Burbanks North as well as parallel structures to the east.
Planning and approvals for the second phase of Burbanks drilling also commenced during the
quarter as well as further refinement of the exploration target pipeline and development of the
Resource portfolio.
Early in the quarter Horizon completed and released a consolidated statement of group Mineral
Resources as of 31 March 2025. 6 The updated group Mineral Resource Statement includes the
addition of 422 kt Nickel into the resource portfolio from the Poseidon assets of Black Swan, Lake
Johnston and Windarra nickel resources and associated infrastructure following the merger with
Poseidon Nickel Limited finalised in the first quarter of 2025.
Life of mine plan studies have been undertaken by an external mining consultant targeting long
term Black Swan Project (BSP) mine feed. External consultants targeting infrastructure and
technical requirements of the studies have also been engaged to support the Life of mine plan.
To support project delivery, Horizon has appointed a full-time environmental approvals specialist
responsible for overseeing approvals across the Company’s broader project portfolio. While the
role covers all Horizon operations, it will be critical in managing the approvals pathway and
timelines specific to the Black Swan Project. This includes reviewing existing permits, identifying
regulatory gaps, and securing additional approvals required for construction and operation.
Horizon places a high value on the environmental approvals process and recognises its essential
role in maintaining compliance, reducing project risk, and enabling timely development in line
with regulatory expectations.
ACQUISITIONS AND DIVESTMENTS
Horizon and Poseidon Nickel Limited (ASX: POS) (Poseidon) have completed the merger
between the two companies by way of Schemes of Arrangement under the Corporations Act
2001 (Cth), whereby Horizon acquired 100% of the fully paid ordinary shares in Poseidon (Share
Scheme) and 100% of the unlisted Poseidon options (Options Scheme, and together with the
Share Scheme, the Schemes).
The transaction has consolidated Horizon’s large gold resource and Poseidon’s Black Swan
processing infrastructure in the Kalgoorlie-Coolgardie-Lake Johnston districts. The combination
provides a pathway for sustainable, long-term gold production and cashflow as an independent
mid-cap producer.
5
6
As announced to the ASX on 26 June 2025.
As announced to the ASX on 19 May 2025,
Page 8 of 26
HRZ QUARTERLY JUNE 2025
Subsequent to the end of the June quarter, Metal Hawk Limited (ASX: MHK) notified the
Company that they would not exercise their option under the Yarmany Project Option and Sale
Deed (as announced to the ASX on 5 July 2023), with this project now 100% retained by Horizon.
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
The Company recognises the importance of Environment, Social and Governance (ESG) factors
and is committed to continuous improvement in this regard.
During the quarter, a review continued of all internal policies, procedures, and governance
principles to identify improvements and opportunities to ensure we meet or exceed our corporate
license to operate.
The Company previously worked with BDO Global to conduct an analysis of the business to
identify opportunities to improve the Company’s ESG performance. Materiality surveys were
completed for both internal and external stakeholders and completed a workshop to map the
opportunities and generate an initial sustainability report. The aim of the process is to develop
systems and processes to ensure we meet or exceed our social license to operate and adopt the
sustainability report covering current and future activities.
CORPORATE / FINANCE
On 1 May 2025, the Company appointed Mr Rob (Robert) Waugh MSc, BSc, FAusIMM, MAIG
to join its Board as a Non-Executive Director.
Rob has more than 35 years’ experience in the resources sector with the majority in gold and
base metals. Rob has held senior exploration management roles at WMC Resources Limited
(WMC) and BHP Billiton Limited (BHP), prior to his role as Managing Director of Musgrave
Minerals Limited which culminated in the $200 million acquisition by Ramelius Resources Limited
in late 2023.
On 30 May 2025, Tranche 1 of a two tranche placement was completed with funds raised of
approximately A$11.8 million before costs. The remaining $18.2 million was to be approved by
shareholders at a general meeting held on 10 July 2025. Subsequent to the June quarter,
shareholders approved all resolutions in the 10 July 2025 general meeting which included
Tranche 2 of the placement, and the ratification of previous share issues under Listing Rule 7.1
and 7.1A.
Total cash at bank as at 30 June 2025 was A$15.7 million. In addition, the Company holds
investments in ASX listed companies with a current value of approximately A$2.1 million (Table
5).
As previously announced to the ASX on 19 October 2022 and 23 November 2022, the Company
executed financial agreements with Nebari LLC for a US$5 million Convertible Loan Facility in
two tranches of US$2 million and US$3 million respectively. Both tranches have been drawn
down. For further information and terms of the Loan Agreement, we refer you to the ASX
announcement dated 19 October 2022.
During the June quarter, Nebari gave notice to convert USD1,307,112 from the convertible loan
with Nebari Gold Fund 1, LP for 50,900,000 ordinary shares being issued on partial conversion
of the convertible loan.
In accordance with ASX Listing Rule 5.3.5, approximately $37,000 was paid to related parties or
their associates during the quarter, comprising Non-Executive Director fees and superannuation.
Page 9 of 26
HRZ QUARTERLY JUNE 2025
Table 4: Issued Share Capital
HRZ
Fully Paid Ordinary Shares
Issued at
30 June 2025
2,466,042,792
HRZO
Listed Options
(exercise price 8.7c, expiry 21 Sep 2025)
26,723,171
HRAZO Unlisted Options (exercise price 5.19c, expiry 3 Sep 2026)
18,024,910
HRZAN
24,594,600
Code
Class of securities
Director & Employee Performance Rights
Expired
HRZOB Listed Options (exercise price 9.7c, expiry 30 Jun 2025)
51,871,015
Table 5: Listed Company Investments
Company
Number
Value at 30 June 2025
Richmond Vanadium Technology
19,958,992
1
$1,596,719
Metal Hawk Limited
1,134,430 1
$470,788
Dundas Minerals Limited
3,234,327 1
$51,749
TOTAL
1.
$2,119,256
Liquid asset
This quarterly report has been authorised by the board of directors for release.
Julian Tambyrajah
CFO & Company Secretary
31 July 2025
For further information contact Horizon on:
T: + 61 8 9386 9534
Page 10 of 26
HRZ QUARTERLY JUNE 2025
APPENDICES
TENEMENT SCHEDULE
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
L26/261
100%
-
-
M26/346
100%
-
-
M26/499
100%
-
-
M26/549
100%
-
-
M26/621
100%
-
-
P26/4256
100%
-
-
P26/4579
100%
-
-
P26/4580
100%
-
-
MLA26/855
100%
-
-
PLA26/4318
100%
-
-
E26/220
100%
-
-
P24/5143
-
-
100%
P24/5144
-
-
100%
P24/5145
100%
-
-
P24/5146
100%
-
-
P24/5147
-
-
100%
P24/5148
-
-
100%
P24/5149
-
-
100%
P24/5150
100%
-
-
P24/5151
-
-
100%
P24/5152
-
-
100%
P24/5153
-
-
100%
P24/5154
-
-
100%
P24/5155
100%
-
-
P24/5156
100%
-
-
P24/5157
100%
-
-
P24/5158
100%
-
-
P24/5159
-
-
100%
P24/5160
100%
-
-
P24/5348
100%
-
-
P24/5415
100%
-
-
P24/5637
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BINDULI
BLACK FLAG
Page 11 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P24/5638
100%
-
-
P24/5639
100%
-
-
P24/5640
100%
-
-
E70/5980
100%
-
-
E70/5981
100%
-
-
E70/6551
100%
-
-
ELA70/6552
100%
-
-
ELA70/6553
100%
-
-
E70/6554
100%
-
-
ELA70/6555
100%
-
-
E25/349
100%
-
-
E25/543
100%
-
-
E25/564
100%
-
-
L25/48
100%
-
-
L25/50
100%
-
-
L25/51
100%
-
-
M25/182
100%
-
-
M25/327
100%
-
-
M25/329
100%
-
-
M25/330
100%
-
-
M25/333
100%
-
-
M25/357
100%
-
-
P25/2449
100%
-
-
P25/2633
100%
-
-
P25/2670
100%
-
-
P25/2733
100%
-
-
P25/2748
100%
-
-
P25/2755
100%
-
-
P25/2761
100%
-
-
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BLACK FLAG
BRIDGETOWN-GREENBUSHES
CANNON GOLD MINE
CHADWIN
P16/3121
Page 12 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Prospect/Tenement
Notes
Percentage interest
held at the end of
the quarter
Percentage interest
Percentage
acquired during
interest disposed
the quarter
during the quarter
WESTERN AUSTRALIA
COOLGARDIE
E16/589
100%
-
-
E16/590
100%
-
-
E16/591
100%
-
-
E16/592
100%
-
-
LA15/429
100%
-
-
LA15/430
100%
-
-
M26/41
100%
-
-
M26/433
100%
-
-
M26/534
100%
-
-
L27/88
100%
-
-
M27/485
100%
-
-
P26/4535
-
-
100%
P27/2380
100%
-
-
P27/2381
100%
-
-
G27/1
100%
-
-
L27/90
100%
-
-
L27/91
100%
-
-
L27/92
100%
-
-
L27/93
100%
-
-
M27/156
100%
-
-
M15/1204
100%
-
-
M15/652
100%
-
-
P15/6380
100%
-
-
GOLDEN RIDGE (NIMBUS)
KALPINI
KANOWNA BELLE (NIMBUS)
PENNY’S FIND
ROSE HILL
Page 13 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E26/209
100%
-
-
P26/4316
100%
-
-
P26/4317
100%
-
-
P26/4319
100%
-
-
P26/4320
100%
-
-
P26/4321
100%
-
-
P26/4322
100%
-
-
P26/4323
100%
-
-
P26/4324
100%
-
-
P26/4325
100%
-
-
P26/4326
100%
-
-
P26/4327
100%
-
-
P26/4328
100%
-
-
P26/4329
100%
-
-
P26/4330
100%
-
-
P26/4331
100%
-
-
P26/4332
100%
-
-
P26/4333
100%
-
-
P26/4334
100%
-
-
P26/4335
100%
-
-
P26/4336
100%
-
-
P26/4337
100%
-
-
P26/4338
100%
-
-
P26/4339
100%
-
-
P26/4340
100%
-
-
P26/4341
100%
-
-
P26/4342
100%
-
-
P26/4343
100%
-
-
P26/4344
100%
-
-
P26/4345
100%
-
-
P26/4350
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
LAKEWOOD
Page 14 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
100%
-
-
100%
-
-
M24/919
100%
-
-
M24/959
100%
-
-
P24/4817
100%
-
-
P24/5046
100%
-
-
P24/5464
100%
-
-
P24/5507
100%
-
-
P24/5508
100%
-
-
MLA24/1004
100%
-
-
MLA24/1020
100%
100%
-
E15/1655
100%
-
-
E16/494
100%
-
-
E16/497
100%
-
-
E16/503
100%
-
-
E16/506
100%
-
-
E16/507
100%
-
-
E16/510
100%
-
-
E16/519
100%
-
-
E16/521
100%
-
-
E16/525
100%
-
-
E16/526
100%
-
-
P16/3212
100%
-
-
P16/3213
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
WHITE FLAG
E26/168
M26/616
1
WINDANYA
YARMANY
YARMANY
Page 15 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E25/511
100%
-
-
L25/32
100%
-
-
L25/35
100%
-
-
L25/36
100%
-
-
L26/240
100%
-
-
L26/252
100%
-
-
L26/266
100%
-
-
L26/270
100%
-
-
L26/274
100%
-
-
L26/275
100%
-
-
M25/355
100%
-
-
M26/29
100%
-
-
M26/161
100%
-
-
M26/277
100%
-
-
M26/318
100%
-
-
M26/490
100%
-
-
M26/598
100%
-
-
P25/2403
-
-
100%
P25/2404
-
-
100%
P25/2405
-
-
100%
P25/2450
100%
-
-
P25/2469
100%
-
-
P25/2470
100%
-
-
P25/2471
100%
-
-
P25/2472
100%
-
-
P25/2473
100%
-
-
P25/2474
100%
-
-
P25/2475
100%
-
-
P25/2526
100%
-
-
P25/2551
100%
-
-
P25/2552
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
Page 16 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P25/2643
100%
-
-
P25/2644
100%
-
-
P25/2645
100%
-
-
P25/2646
100%
-
-
P25/2647
100%
-
-
P25/2697
100%
-
-
P25/2732
100%
-
-
P26/4199
100%
-
-
P26/4204
100%
-
-
P26/4205
100%
-
-
P26/4206
100%
-
-
P26/4207
100%
-
-
P26/4208
100%
-
-
P26/4299
100%
-
-
P26/4300
100%
-
-
P26/4301
100%
-
-
P26/4302
100%
-
-
P26/4381
100%
-
-
P26/4382
100%
-
-
P26/4383
100%
-
-
P26/4384
100%
-
-
P26/4385
100%
-
-
P26/4386
100%
-
-
P26/4405
100%
-
-
P26/4431
100%
-
-
P26/4432
100%
-
-
P26/4505
100%
-
-
P26/4509
100%
-
-
P26/4510
100%
-
-
P26/4518
100%
-
-
P26/4582
100%
-
-
P27/2265
-
-
100%
P27/2266
-
-
100%
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
Page 17 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P27/2267
-
-
100%
P27/2269
-
-
100%
P27/2429
100%
-
-
P27/2466
100%
-
-
P27/2467
100%
-
-
M15/161
100%
-
-
M15/731
100%
-
-
MLA15/1845
100%
-
-
P15/5249
100%
-
-
P15/5412
100%
-
-
P15/6314
100%
-
-
P15/6381
100%
-
-
P15/6382
100%
-
-
PLA15/6417
100%
-
-
PLA15/6549
100%
-
-
P15/6757
100%
-
-
P15/6774
100%
-
-
P15/6775
100%
-
-
100%
-
-
M16/130
100%
-
-
M16/133
100%
-
-
M16/168
100%
-
-
M16/171
100%
-
-
M16/242
100%
-
-
M16/258
100%
-
-
M16/550
100%
-
-
MLA16/556
100%
-
-
MLA16/597
100%
-
-
P16/2985
100%
-
-
P16/2986
100%
-
-
P16/2987
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
BURBANKS
PHOENIX
2
2
M15/119
PHILLIPS FIND
2
Page 18 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P16/2988
100%
-
-
P16/2998
100%
-
-
P16/2999
100%
-
-
P16/3037
100%
-
-
P16/3038
100%
-
-
P16/3039
100%
-
-
P16/3040
100%
-
-
P16/3041
100%
-
-
P16/3042
100%
-
-
P16/3043
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
PHILLIPS FIND
2
P16/3084
3
85%
-
-
P16/3085
3
85%
-
-
P16/3086
3
85%
-
-
P16/3087
3
85%
-
-
P16/3088
100%
-
-
P16/3358
100%
-
-
PLA16/3525
100%
-
-
100%
-
-
G27/2
100%
-
-
L24/219
100%
-
-
L24/222
100%
-
-
L27/57
100%
-
-
L27/58
100%
-
-
L27/59
100%
-
-
L27/74
100%
-
-
L27/75
100%
-
-
L27/77
100%
-
-
L27/78
100%
-
-
L27/95
100%
-
-
L27/96
100%
-
-
M27/200
100%
-
-
M27/214
100%
-
-
M27/216
100%
-
-
M27/39
100%
-
-
BLACK SWAN
4
Page 19 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Prospect/Tenement
Notes
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
WESTERN AUSTRALIA
LAKE JOHNSTON
4
E63/2244
5
80%
-
-
E63/2256
5
80%
-
-
G63/5
100%
-
-
G63/8
100%
-
-
L63/51
100%
-
-
L63/52
100%
-
-
L63/55
100%
-
-
L63/57
100%
-
-
M63/163
100%
-
-
M63/282
100%
-
-
M63/283
100%
-
-
M63/284
100%
-
-
M63/292
100%
-
-
M63/293
100%
-
-
M63/294
100%
-
-
M63/522
100%
-
-
M63/523
100%
-
-
M63/524
100%
-
-
100%
-
-
G38/21
100%
-
-
L38/118
100%
-
-
L38/119
100%
-
-
L38/220
100%
-
-
L38/121
100%
-
-
L38/122
100%
-
-
L38/199
100%
-
-
L38/218
100%
-
-
L38/225
100%
-
-
L39/184
100%
-
-
L39/221
100%
-
-
L39/224
100%
-
-
M261SA
100%
-
-
M38/1244
100%
-
-
M38/1245
100%
-
-
M39/1075
100%
-
-
WINDARRA
4
Page 20 of 26
HRZ QUARTERLY JUNE 2025
TENEMENT SCHEDULE continued
Prospect/Tenement
Notes
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
JOINT VENTURES
WESTERN AUSTRALIA
YARMANY – GOLD TIGER RESOURCES (AUS) LIMITED
E16/492
6
25%
-
-
E16/499
6
25%
-
-
MT THIRSTY – CONICO LTD (FORMERLY AUSTRALIAN COBALT LTD)
E63/1267
7
50%
-
-
E63/1790
7
50%
-
-
GLA63/9
7
50%
-
-
L63/80
7
50%
-
-
L63/81
7
50%
-
-
L63/91
7
50%
-
-
MLA63/669
7
50%
-
-
P63/2045
7
50%
-
-
R63/4
7
50%
-
-
80%
-
-
LAKE JOHNSTON – ESSENTIAL METALS
E63/1784
8
Notes
(1)
Royalty of A$1 per tonne of ore mined and treated from M26/616 is payable to Pamela Jean Buchhorn.
(2)
On 18 June 2024, Horizon implemented the merger with Greenstone Resources Limited. The transaction
brought Greenstone’s complementary assets over to Horizon as listed in the above tenement schedule.
(3)
Hayes Mining Pty Ltd own 15% interest in P16/3084 to P16/3087.
(4)
On 19 February 2025, Horizon implemented the merger with Poseidon Nickel Limited. The transaction brought
Poseidon’s complementary assets over to Horizon as listed in the above tenement schedule.
(5)
In December 2023, Poseidon entered into a farm-in agreement with Mantis Resources to earn-in up to 100%
ownership interest in the two tenements which are close proximity to the Lake Johnston Project.
(6)
An earn-in JV whereby Gold Tiger Resources (Australia) Limited can earn 90% over 4 stages (4 years) by
spending A$300,000 and paying Horizon A$120,000 non-refundable cash amounts. Gold Tiger Resources
(AUS) Limited has earned a 75% interest, leaving Horizon with a 25% interest.
(7)
The Mt Thirsty Cobalt-Nickel-Manganese Project is a large laterite hosted resource, held in a 50:50 joint venture
by Horizon (formerly Greenstone Resources) and Conico Ltd (ASX:CNJ). Conico Ltd is the Joint Venture
manager. The Project is located 16km from the historic mining town of Norseman, Western Australia. 150km
to the north lies Kalgoorlie, the epicentre of the West Australian mining industry and 195km to the south is the
port of Esperance. Access to the site is primaril