Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to provide an update
on the development of the Phillips Find (“Phillips Find”) and Boorara (“Boorara”) Gold Projects.
HIGHLIGHTS
Phillips Find
•
Toll processing of the second stockpile of ore from the Phillips Find JV with BML (BML
Ventures Pty Ltd) completed
•
18,676 dry tonnes of ore at 1.97g/t Au and 95.5% metallurgical recovery delivered 1,132.2oz
sold at an average price of $5,140/oz, generating ~$5.8M in revenue to the Phillips Find JV
•
First free cashflow distribution from the project achieved, generating ~$1.5M in net cashflow
directly to Horizon
•
An additional 87,000t of ore will be Toll Treated at the Greenfields Mill in August 2025,
including 27,000t of ore from Boorara, to complete the Toll Milling Agreement with FMR
•
The remaining 70,000t of ore from Phillips Find will be processed at Focus Minerals Limited’s
Three Mile Hill processing plant in September/October 2025 to complete this first phase of
mining at Phillips Find
Boorara
•
Significant ore stockpiles, comprising approximately 190,000 tonnes of high-grade and
126,000 tonnes of low-grade
•
High-grade stockpiles being prioritised for treatment under the Ore Purchase Agreement
(OPA) with Norton Gold Fields to treat at the Paddington Mill for the processing of a total of
1.24Mt of Boorara ore 2
•
March 2025 quarter payments received from Paddington included 100% payment from the
first stockpile and 50% for the second stockpile, yielding $6.3M in revenue
June Quarter Revenues
•
June 2025 quarter to date, $12.8M in revenue received from Paddington, in addition to $7.5M
received from FRM for the treatment of 51,228 dry tonnes at a grade of 0.92g/t Au and
metallurgical recovery of 94.71% for 1,439.3oz sold at an average price of $5,195/oz treated
at FMR Investments’ Greenfields Mill
Commenting on the mining progress, Managing Director and CEO Mr Grant Haywood said: 3
“We are pleased that our haulage and processing activities are ramping up to crystallise the
significant cash we have tied up within our ore stockpiles, with gold production and therefore revenue
increasing significantly from the March quarter with both operations starting to build up cash flow.”
As announced to the ASX on 13 May 2024 and 12 September 2024. 2 As announced to the ASX on 1 August 2024, 3 See Forward
Looking and Cautionary Statements on Page 5.
1
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon is pleased to provide an update on the development and operations at its 100% owned
Phillips Find and Boorara Gold Projects, located ~45km north-west of Coolgardie and ~15km east
of Kalgoorlie-Boulder respectively, in the heart of the Western Australian goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Phillips Find
Mining at Phillips Find has progressed safely and productively with JV partner BML Ventures (BML)
since October 2024 with first gold was poured in February 2025 under the first campaign.
The second campaign of Phillips Find ore has been processed at FMR Investments’ Greenfields Mill
near Coolgardie totalling 18,676 dry tonnes at a grade of 1.97g/t Au and 95.5% recovery. This yielded
1,132.2oz sold at an average price of $5,140/oz, generating ~$5.8M in revenue to the JV.
The second milling campaign occurred over a four-week period, with three weeks of processing
Boorara ore and one week of Phillips Find JV ore. The JV partners have agreed to an early
distribution of cashflow to Horizon from this Phillips Find campaign which comprised selling 300oz of
JV gold at an average price of $5,060/oz, generating ~$1.52M in net cashflow directly to Horizon.
Page 2 of 5
ASX ANNOUNCEMENT
This earlier than scheduled payment is in part due to BML and Horizon renegotiating with FMR on
the timing of milling for the benefit of BML, with the planned June 2025 campaign now occurring in
August 2025. This will be a four-week campaign which would normally comprise one week of Boorara
ore and three weeks of Philips Find ore, however due to the deferral of cash from June to August
2025, Horizon will treat for 10 days instead of seven in August 2025, and receive the early JV
distribution of cash, which has already been received.
The August campaign will be the final processing at Greenfields under the 200kt agreement with
FMR, with the remaining 70kt of Phillips Find ore being processed at Focus Minerals’ Three Mile Hill
plant in September/October 2025.
Processing to date can be seen in the table below.
4,728
Revenue
Received to JV
(A$M)
7.921
Completed
1,132.2
5,140
5.819
Completed
2,807.5
4,894
13.74
Completed
HG Ore
Stockpile
Tonnes
(t)
Grade
(g/t)
Recovered
Ounces (oz)
Gold Price
A$/oz
1
37,624
1.46
1,675.3
2
18,676
1.97
Total
56,300
1.63
Status
Boorara
Mining at Boorara has continued from Pit 2 (North) and Pit 4 (South) with ~190kt of high-grade ore
stocks currently on the Boorara and/or Paddington ROM pads, and ~126kt of lower-grade ore
stockpiled at Boorara. As anticipated, grades are improving in line with depth.
In addition to the treatment of Boorara ore at Paddington, a campaign was also processed through
FMR Investments’ Greenfields Mill near Coolgardie in April 2025 totalling 51,228 dry tonnes at a
grade of 0.92g/t Au and a metallurgical recovery of 94.71% for 1,439.3oz sold at an average price of
$5,195/oz, generating ~$7.5M of revenue to Horizon.
As previously reported, there was a hiatus in ore haulage to Paddington between ore parcel 1 and 2
whilst mining was undertaken through lower grade zones in the pits and as a result of time delays
with the grade determination and the payment process.
Mining of high-grade ore has now achieved steady state and continuous ore haulage and processing
is expected to continue to Paddington.
Road Train Haulage to Mill
Dec-24
Jan-25
Feb-25
Mar-25
Apr-25
May-25
Tonnes
27,936
24,372
0
47,982*
55,009*
98,449*
Grade (g/t)
0.80
0.8
0
0.92
1.04
0.87
Contained Metal (oz)
717
627
0
1,420
1,836
2,752
* Includes haulage to FMR Investments’ Greenfields Mill as well as Paddington haulage
Revenues received in 2025 at Paddington have been $2.8M in January, $2.2M in February, $1.3M
in March, $3.0M in April, $6.2M in May and $3.6M in the month of June to date, totalling $19.1M,
broken down by stockpile below. This excludes the $7.5M revenue received from treatment at
Greenfields received in May and June 2025.
Page 3 of 5
ASX ANNOUNCEMENT
Cost performance in the June half has been impacted by the establishment of stockpiles, lower than
expected grade performance in the early stages of mining at Boorara and higher strip ratio. With
continuous ore production and haulage now achieved at Boorara and grade control drilling at the
operations well advanced, along with lowering strip ratios while grades improve, the operations are
now well set-up for stronger cost performance and cash flow generation in the December half 2025.
HG Ore
Stockpile
Tonnes
(t)
Grade
(g/t)
Recovered
Ounces (oz)
Gold Price
A$/oz
1
50,604
0.791
1,163
4,256
Revenue
Received
(A$M)
4,951
Status
2
22,239
0.789
510
4,784
2.441
Completed
Completed
3
26,376
0.983
757
5,066
3.836
Completed
4
27,806
0.944
793
5,100
4.046
Completed
5
31,005
0.775
-
-
1.775
6
31,338
0.877
-
-
2.049
7
37,291
0.95
-
-
-
8
46,338
1.001
-
-
-
Other
Stockpiles
83,800
0.91*
-
-
-
Hauling, 50% of
revenue received
Hauling, 50% of
revenue received
Grade determined,
ready to haul
Hauling, 50% of
revenue invoiced
($4.4M)
Building or determining
grade of stockpiles
* Indicates mine claimed grade, not grade determined via stockpile drilling and assays. Stockpiles as of 6am 16 June 2025.
Next Steps 1
The next campaign of ore treatment at FMR’s Greenfields mill is scheduled to commence in early
August 2025 and will comprise approximately 27kt of Boorara ore and 60kt of Phillips Find ore that
completes Horizon’s contract with FMR. The remaining 70kt of high-grade Phillips Find ore is
scheduled to be processed in September/October 2025 through Focus Minerals’ Three Mile Hill
processing plant.
Mining, haulage and continuous treatment from Boorara shall continue at steady state through the
Paddington plant.
A further mining and processing update is expected in the Company’s June 2025 Quarterly Report.
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 4 of 5
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results, and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological, mining
and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations,
competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled
personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations
and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate
financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in
the announcement, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Page 5 of 5
Share your feedback
Discover