Phillips Find - Processing of First Ore
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
12 FEBRUARY 2025
PHILLIPS FIND – PROCESSING OF FIRST ORE
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to provide an update
on the development of the Phillips Find Gold Project (“Phillips Find”).
HIGHLIGHTS
•
Phillips Find Joint Venture (JV) Agreement in place with mining specialists BML Ventures
Pty Limited (BML) to develop and mine two open pits1
•
All management, technical, operational and maintenance roles is being undertaken by BML
with oversight by the Company
•
Low financial risk JV structure with BML funding all project costs, with net cashflow after asset
recovery and repayment of costs to be split 50/50 between Horizon and BML
•
Mine plan involves cutbacks to two existing open pits, Newhaven and Newminster
•
Mining well advanced, with over 800,000 BCM (Bank Cubic Metres) mined to date in both
the Newminster and Newhaven open pits
•
Existing 200,000t Toll Milling Agreement executed with FMR Investments Pty Ltd (FMR) in
May 2024 to be utilised for the Phillips Find JV ore 2
•
First ore from Phillips Find is being hauled to the Greenfields mill, with processing of the first
40,000t ore parcel due to commence next week for a period of approximately two weeks 3,4
Commenting on the mining progress, Managing Director and CEO Mr Grant Haywood said: 2
“We are very pleased to be transporting our first ore from Phillips Find for treatment at the Greenfields
mill. This marks another significant milestone in our journey to become a significant gold producer
and demonstrates the team’s commitment to executing our strategy on schedule. We are now fully
manned up and the team has been making good progress.
We look forward to the next phase as we advance towards first gold production from Phillips Find
and continue generating value for our shareholders in this high gold price environment.”
As announced to the ASX on 7 August 2024. 2 As announced to the ASX on 13 May 2024, 3 See Forward Looking and Cautionary
Statements on Page 6. 4 As announced to the ASX on 12 September 2024.
1
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon is pleased to provide an update on the development and operations at Phillips Find, located
45km north-west of Coolgardie in the heart of the Western Australian goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Mining is progressing with first ore currently being hauled to the Greenfields mill. Ore was mined from
both the Newminster and Newhaven open pits. The first ore parcel of approximately 40,000 tonnes
is scheduled for processing which will start next week for a duration of around two weeks.
Next Steps 1
Haulage of the first stockpile is underway, with first gold pours and revenue due shortly. As the
mining within the JV is being undertaken with BML Ventures who have sole funded the development
at Phillips Find, initial revenue from gold sales will go to the JV to pay for working capital. Both
parties shall receive a 50/50 distribution of net cash after asset recovery and the repayment of
development costs have been covered.
1
See Forward Looking and Cautionary Statements on Page 6.
Page 2 of 6
ASX ANNOUNCEMENT
Figure 2: Mining in the Newhaven open pit at Phillips Find
Figure 3: Mining in the Newminster open pit at Phillips Find
Page 3 of 6
ASX ANNOUNCEMENT
Figure 4: First road trains loading ore
Figure 5: First Phillips Find ore being loaded on route to the Greenfields Mill
Page 4 of 6
ASX ANNOUNCEMENT
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 5 of 6
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results, and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological, mining
and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations,
competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled
personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations
and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate
financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in
the announcement, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Page 6 of 6