Ultra High-Grades Returned in Burbanks Phase 1 Drilling
Released
Released
Announcement PDF
Level 2, 16 Ord Street, West Perth, WA 6005 | PO Box 1064, West Perth, WA 6872 | +61 8 9386 9534
info@horizonminerals.com.au | ACN 007 761 186 | ABN 88 007 761 186 | horizonminerals.com.au
ASX: HRZ
ASX ANNOUNCEMENT
17 December 2025
ULTRA HIGH-GRADES RETURNED IN BURBANKS PHASE 1
DRILLING
HIGHLIGHTS
• A spectacular hit of 0.3m at 5,848g/t Au from 259.17m depth has been intersected in diamond drilling
down plunge of the high-grade Mineral Resource at the Burbanks Project.
• Two thirds of the Phase 1 Burbanks drilling is now completed. Assays for an additional 10 holes have
been received. Highlights as follows1
:
o 0.96m @ 1,762g/t Au from 259.17m, including 0.3m @ 5,848g/t Au (25HBBD024)
o 0.51m @ 14.93g/t Au from 143.66m, 0.39m @ 4.31g/t Au from 147.86m, 0.86m @ 6.53g/t Au
from 150.5m and 1.48m @ 1.54g/t from 167.52m, including 0.35m @ 4.15g/t Au from 168.65m
(25HBBD023)
o 1.18m @ 9.51g/t Au from 122.22m, 0.8m @ 5.10g/t Au from 197.87m and 1.81m @ 9.17g/t
Au from 372.19m (25HBBD018)
o 2m @ 4.97g/t Au form 34m, 0.34m @ 4.94g/t Au from 215.24 (25HBBD016)
o 4.0m @ 2.39g/t Au from 17m, including 2m @ 4.09g/t Au from 17m (25HBBD019)
o 3.0m @ 2.54g/t Au from 57m, including 1m @ 4.32g/t Au from 57m, 0.38m @ 6.83g/t Au from
91.95m, 0.59m @ 4.54g/t Au from 253m and 1.87m @ 4.97g/t Au from 265.96m (25HBBD021)
• Results from the initial 15 holes were reported in October 20252
.
• Horizon commenced a two stage, 30,000m drilling program in late June 2025, with the initial 15,000m
targeting mostly infill to upgrade the existing Burbanks Mineral Resource Estimate of 6.1Mt grading
2.4g/t Au for 466koz3, 4
.
• Underground mining at Burbanks historically produced 324koz @ 22.7g/t Au.
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to report ultra high-grade drill
results from the Phase 1 drill program underway at its 100% owned, high-grade Burbanks gold project, located
9km south of Coolgardie in the Western Australian Goldfields.
Managing Director and CEO Mr Grant Haywood commented:
“The Burbanks resource drilling continues to deliver, with spectacular high-grade intersections announced
today including gold grades of up to 5,848g/t. The drilling program unequivocally highlights the exceptional
grade potential of the system which significantly underpins our strategy to increase high-grade, high margin
feed to our 100% owned Black Swan processing plant.”
1
Refer to Forward Looking and Cautionary Statements on page 13. Note Intercepts are stated as downhole intervals, and due to the
vertical nature of the ore body and restricted collar locations are commonly, but not consistently, at a low angle to the mineralisation.
2
As announced to the ASX on 6 October 2025 “Burbanks Drilling Returning Spectacular Grades”.
3
As announced to the ASX on 1 August 2024 “Group Mineral Resources Statement – Amended”. See JORC Table 3. Burbanks Gold
Mineral Resources detailed on page 11.
4
As announced to the ASX on 26 June 2025 “Growth and Infill Drilling Underway at Burbanks”, see Competent Persons statement on
page 11.
horizonminerals.com.au Page | 2
Drilling Results - Burbanks Main Lode
Infill drilling targeted multiple zones, including:
• A gap between the Main Lode and Burbanks North resources;
• The area south of the Main Lode workings; and
• The Burbanks North resource, particularly its northern extension (Figure 2).
Coarse grained visible gold in drill core has been observed, hosted in quartz carbonate veining within sheared
basalt or, alternatively, associated with a distinctive garnet-rich diorite that has intruded along the Burbanks
Shear. A spectacular grade of 5,848g/t Au over 0.3m from 259.17m (Figure 1) within an overall significant
intercept of 0.96m @ 1,762g/t Au from 259.17m in (25HBBD024) is a standout result, confirming the
exceptional potential for down dip extensions to the high-grade gold mineralisation. This key intercept provides
compelling evidence for immediate resource expansion potential in this critical infill area.
Figure 1: Visible gold in a quartz vein at 259.3m from hole 25HBBD024. The interval grades 0.3m @ 5848g/t Au
from 259.17m (refer Table 1). 5
Core width is NQ2 and ≈ 50.5mm in diameter for scale.
Phase 1 comprises 45 holes, with 35 holes completed to date for a total of over 10,000m (Figure 2). Assay
results have been returned for the first 25 holes, with the latest 10 holes included in this report. Four of these
5
The Company confirms that the observations of native gold documented in the drill core photograph in Figure 1 of this announcement
are for illustrative purposes only and should not be considered indicative of the grade or metal content of the mineralisation. Visual
estimates of mineral abundance should never be considered a proxy or substitute for laboratory analysis. The accompanying laboratory
assay results for this interval from hole 25HBBD024, are required to determine grade of the mineralisation reported (0.3m @ 5848g/t Au
from 259.17m) and are contained at Table 1 of this announcement.
horizonminerals.com.au Page | 3
holes have results returned only for selected intervals with the remainder expected in early 2026. Highlights
are shown on the cover page, and full results in Table 1. Intercepts are not true widths but stated as downhole
intervals due to the vertical nature of the ore body and restricted collar locations, and are commonly, but not
consistently, at a low angle to the mineralisation. Drill collar coordinate details for the program drilled to date
are shown in Table 2.
While the program successfully intersected high-grade gold mineraliation through these zones, significantly
improving continuity, the very high-grade result in 25HBBD024 was recorded in the Main Lode-Burbanks North
bridge that lies outside the current resource boundary (Figure 3 and 4).
Figure 2: Burbanks Mining Centre showing the location of the completed holes in the current drill program
and representative long and cross sections.
horizonminerals.com.au Page | 4
Figure 3: Cross-section on local grid (+/- 10m) showing hole 25HBBD024 and historical drilling with the down
hole gold intersections >1.0g/t and sampled areas where assay results are pending
horizonminerals.com.au Page | 5
Critical to understanding and expanding the Burbanks deposits is the identification of high-grade plunging ore
shoots (Figure 4). These ore shoots have become apparent with the combination of recent drilling, reviewing
historical data and reports, as well as through the increased understanding of the structural controls on
mineralisation with input from external consultants.
Figure 4: SW NE schematic long section on local grid showing the location of drilling around the Main Lode, the
current MRE categories, historical pierce points and recent drill traces with pierce points >1.0g/t.
Drilling Results - Burbanks North
Burbanks North continues to deliver exceptional results, confirming existing mineralisation with numerous high-
grade lodes intersected in holes 25HBBD016-18 that align with the current mineralisation interpretation.
Excitingly, some of the drillholes have new intersections of high-grade gold mineralisation that sit outside of
the current mineralised envelope (Figures 5 and Figure 6). Zones of strong shearing with chlorite-biotite
alteration and sulphide (pyrite and phyrrhotite) development are clearly mapped aiding interpretations for
further targeting.
In addition to the drilling results contributing to confirming and expanding the Mineral Resource Estimate for
Burbanks, Horizon is collecting as much key information as possible that will assist in future studies, mine
design and infrastructure.
horizonminerals.com.au Page | 6
Figure 5: Cross-section on local grid (+/- 10m) showing hole 25HBBD018 and historical drilling with the down
hole gold intersections >1.0g/t.
horizonminerals.com.au Page | 7
Figure 6: SW NE schematic long section on local grid showing the location of drilling in the 2025 drill program
around Burbanks North. The current MRE categories, historical pierce points and recent drill traces with pierce
points >1.0g/t.
External Geological Expertise
Horizon has also engaged an external consultant with significant experience with the Burbanks deposit to
assist with providing technical support, advice, and training for the exploration team. The Burbanks narrow
vein, high-grade gold deposit contains highly complex geology, alteration, and structural controls on the
mineralisation. Understanding these elements is critical to understanding the deposit for drill planning, mineral
resource estimation, and orebody extension. This valuable geological support will continue as needed for the
upcoming drilling programs and mine planning.
Next Steps
The Company will continue to report assay results from Phase 1 as they become available. All assay results
are expected to be received by the end of the March 2026 quarter, enabling the completion of an updated
Mineral Resource Estimate in the June 2026 quarter. Ore Reserve studies based on the improved confidence
in resource classification from Inferred to Indicated in the updated Mineral Resource Estimate will then follow.
The 15,000m Phase 2 extensional drilling program aimed at growing the resource base at Burbanks is planned
to commence early in 2026.
horizonminerals.com.au Page | 8
Overview - Burbanks
A two-phase extensional and infill drilling program commenced at Horizon’s 100% owned, high-grade,
Burbanks gold project in late June 2025, with a total of 30,000m of reverse circulation (“RC”) pre-collars and
diamond drill tails planned. Burbanks is located 9km south of Coolgardie in the world-renowned Western
Australian Goldfields (Figure 7).
Figure 7: Horizon’s project locations, regional geology and surrounding infrastructure
Phase 1 of the drill program is currently underway, comprising ~15,000m of mostly infill drilling to enhance
resource continuity and confidence. In addition to the infill drilling, several Phase 1 drill holes are designed to
test targets at depth and along strike outside the existing Burbanks Mineral Resource Estimate (Refer Figure
4 and Figure 6). The reminaing Phase 1 drill results are expected through to the March 2026 quarter.
Phase 2 comprises ~15,000m of extensional drilling, targeting along strike and down dip of known high grade
lodes with drilling commencing in early 2026.
The Phase 1 infill program plans to enhance resource continuity and resource confidence, and transition more
of the resource from the Inferred to Indicated category. This will facilitate the conversion to Ore Reserves, and
the development of a mining plan, essential steps for project advancement at Burbanks.
horizonminerals.com.au Page | 9
Table 1 - Significant intervals for holes 25HBBD0016-024, 027. Some assay results for holes 25HBBD022-024 and
25HBBD027 are still outstanding at the time of reporting. Intercepts are down hole and not true width and were
calculated based on a sample returning an assay value of greater than 1.0g/t Au over an interval not less than
0.2m and not greater than 1.2m, with not more than 1m of internal dilution. Intervals are based on geology and no
top cut off was applied. No significant result is represented as NSI in the table. All other assays from the reported
drill holes were below the defined cut-off grade of 1.0g/t Au and are not considered material for public reporting.
Hole ID From (m) To (m) Intercept Width (m) Au g/t
25HBDD016 34.00 36.00 2.00 4.97
25HBDD016 215.24 215.58 0.34 4.94
25HBDD016 219.79 220.20 0.41 3.10
25HBDD016 260.58 261.07 0.49 2.57
25HBDD016 265.14 266.09 0.95 1.23
25HBDD016 274.00 275.27 1.27 1.30
25HBDD016 307.23 307.57 0.34 1.16
25HBDD017 87.54 87.93 0.39 1.09
25HBDD017 109.20 111.10 1.90 1.55
25HBDD017 271.44 272.00 0.56 1.03
25HBDD017 276.24 277.00 0.76 1.21
25HBBD018 84.30 84.84 0.54 2.02
25HBBD018 122.22 123.4 1.18 9.51
25HBBD018 197.87 198.67 0.80 5.10
25HBBD018 208.24 212 3.76 1.05
25HBBD018 258.45 260.5 2.05 2.14
25HBBD018 289.28 289.69 0.41 2.29
25HBBD018 291.00 293.35 2.35 1.54
25HBBD018 299.82 300.27 0.45 1.01
25HBBD018 372.19 374 1.81 9.17
25HBBD018 429.00 429.72 0.72 1.58
25HBBD019 17.00 21.00 4.00 2.39
including 17.00 19.00 2.00 4.09
25HBBD019 109.37 110.56 1.19 1.59
25HBBD019 141.48 142.32 0.84 1.09
25HBBD019 157.00 157.95 0.95 2.47
25HBBD020 175.00 177.60 2.60 1.37
25HBBD021 57.00 60.00 3.00 2.54
including 58.00 59.00 1.00 4.32
25HBBD021 91.95 92.33 0.38 6.83
25HBBD021 120.00 121.16 1.16 1.15
25HBBD021 123.00 125.57 2.57 1.13
horizonminerals.com.au Page | 10
25HBBD021 253.00 253.59 0.59 4.54
25HBBD021 265.96 267.83 1.87 4.97
including 266.64 266.98 0.34 15.61
25HBBD022 NSI
25HBBD023 20.00 21.00 1 3.72
25HBBD023 60.08 60.77 0.69 1.73
25HBBD023 143.66 144.17 0.51 14.93
25HBBD023 147.86 148.25 0.39 4.31
25HBBD023 150.50 151.36 0.86 6.53
25HBBD023 154.72 155.07 0.35 1.08
25HBBD023 157.87 158.79 0.92 2.35
25HBBD023 162.27 163.61 1.34 1.80
25HBBD023 165.51 165.82 0.31 1.51
25HBBD023 167.52 169.00 1.48 1.54
including 168.65 169.00 0.35 4.15
25HBBD023 172.74 173.21 0.47 1.35
25HBBD023 194.32 194.88 0.56 1.09
25HBBD024 219.49 220.1 0.61 1.17
25HBBD024 259.17 260.13 0.96 1835
including 259.17 259.47 0.3 5848
25HBBD027 266.28 267.00 0.72 1.67
Table 2 - Collar location details, in GDA94, Zone 51 and local mine grid.
Hole Id MGA94
East
MGA94
North
Local
East
Local
Noth
RL Dip Azi EOH
(m)
Assay
Status
25HBBD016 323493 6567950 1666 7662 402 -60 130 393.6 Returned
25HBBD017 323917 6568271 1769 8183 399 -65 130 290.9 Returned
25HBBD018 323437 6567314 2046 7149 384 -60 310 496.8 Returned
25HBBD019 323248 6567084 2058 6851 381 -59 297 345.1 Returned
25HBBD020 323059 6566755 2136 6480 387 -64 310 369.0 Returned
25HBBD021 323251 6567120 2036 6880 382 -59 308 319.8 Returned
25HBBD022 323146 6566908 2099 6651 385 -50 308 269.8 Partial
25HBBD023 323256 6567116 2043 6881 381 -60 308 375.7 Partial
25HBBD024 322963 6566676 2115 6357 391 -59 325 327.0 Partial
25HBBD025 322570 6566474 1956 5945 396 -69 130 270.0 Pending
25HBBD026 322965 6566673 2119 6356 391 -64 324 365.0 Pending
25HBBD027 322536 6566438 1954 5895 398 -65 130 279.7 Partial
25HBBD028 323267 6567194 1999 6946 382 -74 310 65.0 Pending
horizonminerals.com.au Page | 11
25HBBD029 322548 6566455 1953 5916 397 -69 130 324.5 Pending
25HBBD030 323389 6567753 1719 7445 399 -55 120 326.7 Pending
25HBBD031 323015 6566887 2015 6549 389 -55 130 299.7 Pending
25HBBD032 323029 6567128 1865 6738 385 -76 127 513.8 Pending
25HBBD033 323141 6567280 1847 6927 383 -70 130 470.0 Pending
25HBBD034 323374 6567774 1694 7451 400 -72 124 431.4 Pending
25HBBD035 323280 6567179 2019 6943 382 -60 130 65.0 Pending
Table 3. Horizon Minerals Limited – Burbanks Gold Mineral Resources*
Project Cutoff Measured Indicated Inferred Total
Au ppm Mt
Au
ppm Ounces Mt
Au
ppm Ounces Mt
Au
ppm Ounces Mt
Au
ppm Ounces
Burbanks OP 0.5 1.43 2.02 92,800 3.43 1.86 204,900 4.86 1.90 297,700
Burbanks UG 2.5/2.0 0.12 4.26 16,700 1.07 4.39 151,200 1.19 4.38 167,900
Total 1.55 2.19 109,500 4.50 2.46 356,100 6.05 2.39 465,600
*Appropriate rounding applied.
Confirmation
To the extent that this announcement contains references to prior exploration results which have been cross
referenced to previous market announcements made by the Company, unless explicitly stated, no new
information is contained. The information in this report that relates to Horizon’s Mineral Resources estimates
is extracted from and was originally reported in Horizon’s ASX announcement titled “Group Mineral Resource
Statement – Amended” (Burbanks, Phillips Find) on 1 August 2024, which is available at www.asx.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in those announcements continue to apply and have not materially changed. The
Company confirms that the form and context of the Competent Person’s findings in relation to those Mineral
Resources estimates or Ore Reserves estimates have not been materially modified from the original market
announcements.
Competent Persons Statement – Burbanks
The information in this document that relates to exploration results, geology and data compilation is based on
information compiled under the supervision and review of Mr. Stephen Guy, a Competent Person who is a
Member of The Australian Institute of Geoscientists (8203).
Mr. Guy is the Chief Geologist for Horizon Minerals, is a full-time employee of the Company and holds shares
and options in the Company. Mr. Guy has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr. Guy consents to the inclusion in this announcement of the matters based
on this information in the form and context in which it appears.
The information in the report to which this statement is attached that relates to the estimation and reporting of
global gold Mineral Resources at the Burbanks deposits is based on information compiled by Mr Glenn Poole,
BSc, a Competent Person and a current Member of the Australian Institute of Mining and Metallurgy. Mr Poole
horizonminerals.com.au Page | 12
is former Chief Geologist of Greenstone Resources Pty Ltd a wholly owned subsidiary of Horizon Minerals,
and has sufficient experience relevant to the style of mineralisation and deposit type under consideration and
to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Poole
consents to the inclusion in the report of matters based on his information in the form and context in which it
appears.
For further information, please contact:
Grant Haywood Michael Vaughan
Managing Director and CEO Investor and Media Relations – Fivemark
grant.haywood@horizonminerals.com.au michael.vaughan@fivemark.com.au
+61 8 9386 9534 +61 422 602 720
JOIN HORIZON MINERALS INTERACTIVE HUB
Visit https://investors.horizonminerals.com.au/auth/signup for
Horizon Minerals’ Interactive InvestorHub
Horizon Minerals
Email: info@horizonminerals.com.au
horizonminerals.com.au Page | 13
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements. They
include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward
looking statements include, but are not limited to, statements preceded by words such as “planned”,
“expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”,
“nominal”, “conceptual” and similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
as are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be relied on as a
guarantee of future performance. Forward looking statements may be affected by a range of variables that
could cause actual results to differ from estimated results, and may cause the Company’s actual performance
and financial results in future periods to materially differ from any projections of future performance or results
expressed or implied by such forward looking statements. These risks and uncertainties include but are not
limited to liabilities inherent in mine development and production, geological, mining and processing technical
problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals required
in connection with mining and third party processing operations, competition for among other things, capital,
acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of
acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various
events which could disrupt operations and/or the transportation of mineral products, including labour stoppages
and severe weather conditions, the demand for and availability of transportation services, the ability to secure
adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current ASX Listing
Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in the
announcement, including with respect to any production targets and financial estimates, based on the
information contained in this and previous ASX announcements.
horizonminerals.com.au Page | 14
Appendix 1 – JORC Table 1
Burbanks Project – 2025
JORC Code (2012) Table 1, Sections 1 and 2
The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition) guidelines for the reporting of Mineral Resources.
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
Sampling was conducted using multipurpose Reverse Circulation (RC) and Diamond
Core (DD) drilling rig from surface.
For RC drilling, samples were collected as both 4m composites and 1m splits using
a cyclone and cone splitter to obtain a ~2-3kg representative samples.
Diamond drilling was used to obtain ½ NQ2 core samples of various lengths
(minimum 0.2m and maximum 1.2m), from which 1-3kg of material is collected for
assaying.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
RC samples were collected directly from a cyclone and cone splitter mounted on the
rig to give 4m composites and a 1m split.
The cyclone and splitter were cleaned regularly to minimize contamination.
horizonminerals.com.au Page | 15
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
For DD drilling, samples were collected as half-core (NQ2) using geological intervals
and mineralisation boundaries which is considered appropriate for this style of
mineralisation.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Field duplicates, QAQC certified reference standards and blanks were
collected/inserted at a rate of 1 in every 20m (maximum) through pre-determined
mineralised zones.
All samples were crushed and split to produce a 500g jar for Photon assay.
Sampling and QAQC procedures are carried out using Horizon protocols consistent
with industry best practice.
Drilling Techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
RC drilling was carried out using a face sampling hammer with a 127mm (5”) drill bit.
DD was NQ2 through the main zones of mineralisation. Core was oriented every 6m
where possible using an electronic orientation tool.
horizonminerals.com.au Page | 16
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Drill sample recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
Sample recoveries for RC are visually estimated qualitatively on a metre basis and
recorded in the database.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Drilling contractors adjust their drilling approach to specific conditions to maximise
sample recovery.
RC samples were visually assessed for recovery and moisture. A cyclone and cone
splitter were used to provide uniform sample.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No sample recovery issues have been identified.
No sample bias has been identified.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
All drilled intervals (RC and DD) are logged and recorded.
Data for DD core was recorded for regolith, lithology, veining, fabric (structure), grain
size, colour, sulphide presence, alteration, oxidation state, fractures, and RQD.
Horizon considers the data to be of an appropriate level of detail to support future
resource estimations.
horizonminerals.com.au Page | 17
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
Logging is both qualitative and quantitative in nature depending on the field being
logged.
Logging of RC chips and DD core was qualitative, both were photographed.
RC chips trays and DD core is stored at the Company’s core yard on-site at Burbanks.
The total length and percentage of the relevant
intersections logged.
All drillholes are logged in full.
Sub-sampling
techniques and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
DD core is cut in half next to the orientation line. The right-side of the core is collected
for analysis and the left side retained for reference.
Duplicate samples were submitted at a rate of 1:20m through mineralised zones and
certified reference standards were inserted at a rate of 1:20m (maximum) through
mineralised zones based on geological interpretation.
Samples were sent to Intertek Laboratories, where they were dried and crushed to 2
mm before a 500 g split was taken for photon assay.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
All RC samples were passed through cyclone and cone splitter, and a 2-3kg split
sample is collected for each 1m interval and similarly a 4m interval.
horizonminerals.com.au Page | 18
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
4m samples were collected and sent to Intertek to be dried and crushed to 2mm
before a 500g split was taken for photon assay.
1m split samples were collected for analysis from selected zones based on field
logging and >0.3g/t returned assay. All other zones within the RC were sampled by
collecting a 4m composite sample.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample type and size is considered appropriate for this type and style of
mineralisation
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Laboratory QA/QC controls during the analysis process include duplicates for
reproducibility, blank samples for contamination and standards for bias.
The laboratories used have generally demonstrated analytical accuracy at an
acceptable level within 95% confidence limits.
Laboratories also employ their own internal QA/QC protocols.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Laboratory duplicates were generated from the coarse crushed material as part of
the analytical process to monitor sample precision.
For diamond core, the core was orientated and consistently cut next to the orientation
line, with the right-hand side of the core submitted for assay. This procedure ensures
that sampling is systematic and representative of the in-situ material.
horizonminerals.com.au Page | 19
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The sample size is considered appropriate for this type and style of mineralisation
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
RC and DD
Share your feedback
Discover