Quarterly Activities Report 30 September 2024
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES REPORT FOR THE
PERIOD ENDED 30 SEPTEMBER 2024
HIGHLIGHTS
Strategy to bring in short term cashflow via a pipeline of development ready production
assets through a contract mining / JV and utilising existing regional milling infrastructure
well advanced and being executed 1, 2
All Conditions Precedent of Binding Ore Purchase Agreement (OPA) with Paddington
Gold Pty Ltd satisfied enabling treatment of 1.24Mt of Boorara ore at the 3.8Mtpa
Paddington Mill, located ~56km by road from Boorara 3
AMC Consultants completed Ore Reserves study on Boorara to mine 1.24 Mt of ore at
1.24 g/t over 19 months to recover 45.8 koz of gold at a 92.5% milling recovery 4
Horizon board approves the development of Boorara aiming to generate $30m in free
cashflow at a A$3,600/oz gold price 5
Boorara equipment mobilised, site successfully established and open pit mining
operations underway
Joint Venture (JV) Agreement executed with BML Ventures Pty Limited (BML) to develop
and mine two open pits at Phillips Find utilising existing binding Toll Milling Agreement
(TMA) executed with FMR Investments Pty Ltd (FMR) to treat 200kt of Horizon ore at the
Greenfields Mill near Coolgardie 6
Listed investment of 1,063,094 shares in Ora Banda Mining Ltd sold for $532,943 in cash
Cash at bank of A$1.5 million and listed investments totalling A$7.6 million
DECEMBER QUARTER ACTIVITIES 1
First gold pour from Boorara and mining commencing at Phillips Find
Commence initial work in line with the announcement of the $14m placement and
proposed merger with Poseidon Nickel Limited, including: 8
1
o
Drilling programs – preparatory work to deploy $3M budget and 20,000m program at
Burbanks as a priority and extensional programs at Coote and Crake, and brownfields
drilling at greater Boorara and receive further soil samples from Wilsons
o
Studies - commence scoping work for two parallel workstreams a) engineering study
on the refurbishment and upgrade of the Black Swan plant to include a gold circuit; b)
mining studies to develop a robust pipeline of ore feed to the Black Swan plant
See Forward Looking and Cautionary Statements on Page 26. 2 As announced to the ASX on 29 July 2024 and 7 August 2024
see tables and confirmations on page 23. 3 As announced to the ASX on 6 May and 29 July 2024. 4 As announced to the ASX
on 1 August 2024 and see Tables and Confirmation on page 25. 5 As announced to the ASX on 29 July 2024. 6 As announced
to the ASX on 7 August 2024. 8 As announced to the ASX on 25 October 2024 and see Acquisitions and Divestments below.
OVERVIEW
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to provide the
September 2024 Quarterly Activities Report. Horizon is an exploration and gold production
company within the Kalgoorlie and Coolgardie regions of Western Australia (Figure 1).
A key objective for the Company is on near term gold production and exploration upside within
our large tenement package of 928km2. The Company holds numerous multi - commodity assets
including 1.8Moz of gold resources, the Nimbus Silver Zinc project, 50% of the Mt Thirsty Nickel
Cobalt Manganese project in Western Australia, and listed investments including Richmond
Vanadium Technology (ASX: RVT) which holds the world class 1.8Bt Richmond vanadium
project in northwest Queensland (Figure 6). 1
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Subsequent to the end of the September quarter and at the time of reporting, the company
announced a proposed merger with Poseidon Nickel Limited and a two tranche placement of
$14M. The merged entity shall have in addition to the resource base above, 422kt of Ni metal in
resource, the 2.2Mtpa Black Swan processing facility that is proposed to be refurbished and
upgraded to include a CIL gold circuit, the 1.5Mtpa Lake Johnston processing facility and
untested gold anomalies adjacent to Black Swan. 2
Activities during the quarter focussed on implementation of the strategy of near term cashflow
from mining projects, with mining commencing in August at Boorara to treat 1.24Mt of ore at
Norton Goldfields’ Paddington processing plant and announcing a JV agreement with BML
Ventures to mine the Phillips Find project and treat 200kt of ore via a Toll Milling Agreement with
1
See Summary of Gold and non-Gold Mineral Resources and Confirmation on pages 23-24. 2 As announced to the
ASX on 25 October 2024, see also Cautionary and Forward-Looking Statements on Page 26.
Page 2 of 26
FMR at their Greenfields plant near Coolgardie. The Mining Proposal, being the last permit
required to undertake mining, was granted during the quarter and mobilisation commenced. 1
Multiple studies continued during the quarter for Kalpini and Pennys Find which are still ongoing,
and the Ore Reserve study for Boorara completed by AMC Consultants. Preproduction activities
continued for the Cannon Underground Gold Project with dewatering due to be completed in the
next quarter.
There was minimal emphasis on drilling during the quarter as resources and expenditure
focussed on preproduction activities aimed at getting assets into production to generate near
term cashflow for the Company. The Company did however receive the final re-assays from the
Burbanks project, with results not identifying any new economic mineralisation, however will
provide invaluable information in the future modelling and upgrading of the resource model.
The company sold the first tranche of its listed investments in Ora Banda Mining Limited, selling
1,063,094 shares for proceeds of $532,943.
During the quarter, experienced mining executive Mr Warren Hallam joined the Company as a
non-executive director, and non-executive directors Mr Jon Price and Mr Chris Hansen resigned
from the board. The board is not seeking a replacement member of the board at this time.
MINE DEVELOPMENT AND OPERATIONS
The Company has a clear strategy of bringing its extensive gold assets into production and
generate strong cashflows in current times of record high gold prices. The Company underpinned
this strategy by securing ore treatment at two processing facilities over the course of the next
19 months during the June 2024 quarter. The Boorara and Phillips Find development ready
projects have progressed to fulfill the ore treatment contracts whilst multiple studies are
advancing across the gold portfolio with the aim to be in sustainable production. 1, 2
Boorara Gold Project
The Boorara Gold Project is located 15km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1 km southwest of the Nimbus Silver-Zinc Project site where established offices
are connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
The Mineral Resource Estimate (JORC 2012) for Boorara is shown below: 3
Table 1: Boorara Mineral Resource Estimate
Boorara at 0.5 g/t lower cut-off grade
Resource category
1
Tonnes (Mt)
Grade (g/t Au)
Measured
1.12
1.22
Gold Metal (Oz)
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
As announced to the ASX on 29 July 2024 and 7 August 2024. 2 see tables and confirmations on page 23 and 25.
2
As announced to the ASX on 1 August 2024 and see Tables and Confirmation on page 25. 3 As announced to the
ASX on 1 August 2024 and also see confirmations and tables on page 23.
Page 3 of 26
The Company engaged AMC Consultants to undertake an Ore Reserve study on open pit
potential at its Kalpini and Boorara projects. In the June 2024 quarter, the Company secured a
1.24Mt Ore Purchase Agreement with Norton Goldfields to treat Boorara ore at the Paddington
processing plant, with all conditions precedent achieved or waived during the current September
2024 quarter.
The Ore Reserve Study was completed during the quarter with optimisation and economic
modelling based on an A$3,300/oz gold price assuming contract mining with pricing received
from reputable contractors and treatment through the Paddington plant. The Ore Reserve shown
in Table 2.
Table 2: Boorara Ore Reserve 1
Location
Boorara Open Pit
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
The company is not aware of any new information or data that materially affects the information
presented and that the material assumptions and technical parameters underpinning the
Boorara Ore Reserve Study continue to apply and have not materially changed.
During the quarter, mining and ore haulage contracts were awarded, the management and
technical teams employed, and mobilisation and site establishment completed. Mining
commenced in August and first ore was on the Run of Mine (ROM) pad by the end of the quarter.
First gold and revenue is due in the next quarter. Mining is to occur over the course of 14 months
and processing at Paddington over 19 months. Using a A$3,600/oz gold price and actual contract
and processing costs, the project is forecast to make $30m over that period. 2
Phillips Find Project
During the June 2024 quarter, optimisation and design work on Phillips Find was undertaken by
BML Ventures Pty Ltd (BML) in relation to a potential JV opportunity to mine cutbacks at
Newminster and Newhaven. Following this work, a schedule and financial model was developed
which showed strong cashflows. During the quarter, Horizon and BML executed a Joint Venture
(JV) Agreement to develop and mine two open pits at Phillips Find utilising the existing 200kt Toll
Milling Agreement executed with FMR Investments Pty Ltd (FMR). 3
Under the JV, all management, technical, operational and maintenance roles will be undertaken
by BML with oversight by the Company. This is a low financial risk JV structure with BML to fund
all project costs, with net cashflow after the asset recovery and repayment of costs to be split
50/50 between Horizon and BML. This allows Horizon to focus 100% on delivering on its Boorara
gold project whilst also mining another asset in parallel being managed by another capable and
reputable party.
Preparation of soil, waste and ore characterisation work to provide baseline information to
support environmental approvals of the project was completed early in the quarter allowing the
Mining Proposal (MP) to be submitted to DEMIRS for assessment. The MP was assessed and
approved late in the quarter. Mobilisation, site establishment and initial clearing and grubbing
shall occur in October 2024 with mining commencing in the December quarter. The Company
also renegotiated the milling schedule with FMR, with the 200kt of Phillips Find ore to be treated
from February through to June 2025.
1
As announced to the ASX on 1 August 2024 and see tables and confirmations on page 23. 2 As announced to the
ASX on 29 July 2024 and see Tables and Confirmation on page 25. 3 As announced to the ASX on 7 August 2024 Page 4 of 26
and also see confirmations and tables on page 23.
Figure 2: The Newminster Open pit at Phillips Find, September 2024
Cannon Underground Project
The Cannon gold project is located 30 km east-southeast of Kalgoorlie-Boulder (Figure 1) via
existing roads. The Mineral Resource Estimate (JORC 2012) for Cannon is shown below. 1
Table 3: Cannon Mineral Resource Estimate
Cannon at 1.0g/t Au lower cut-off grade
Resource category
Indicated
Tonnes (t)
176,000
Grade (g/t Au)
5.10
Gold Metal (Oz)
28,580
Inferred
51,000
2.30
3,750
Total
226,000
4.40
32,330
There exists significant potential for resource growth down plunge and along strike to the North
of the Cannon shear zone. Further drilling is planned from surface and underground during the
mining sequence to assess these opportunities. 2
A Pre-Feasibility Study (PFS) comprising underground decline development from a portal within
the historical open pit under a contract mining and toll milling model was undertaken. The key
outcomes of the study are summarised in the table below: 3
1
See tables and confirmations on page 23. 2 See also Cautionary and Forward-Looking Statements on Page 26. 3 As
announced to the ASX on 29 March 2022 and see Tables and Confirmation on page 25.
Page 5 of 26
Table 4: Cannon PFS Results
Measure
PFS Outcome
Lateral Development (m)
1,264
Vertical Development (m)
131
Development Ore (kt)
15.0
Stoping Ore (kt)
120
Total Mined Ore (kt)
135
Gold grade (g/t)
4.1
Stope Mining Recovery
95%
Milling Recovery (%)
90%
Recovered Gold (oz)
15,910
Free Cashflow at A$2,600/oz Au Price (A$m)
10.1
All development approvals have been received for Cannon. Dewatering continued during the
quarter and is almost completed (Figure 3). Dewatering activities will continue at Cannon until
the pit has been dewatered and ready for development. Due to prioritising the Phillips Find
project, along with mining the Boorara project, development of Cannon shall be placed on hold.
Figure 3: Cannon open pit dewatering progress, September 2024.
EXPLORATION AND EVALUATION
During the quarter, the Company provided a Group Mineral Resources Statement following the
completion of the merger in June 2024 with Greenstone Resources Limited (formerly ASX:
GSR). The Company’s Mineral Resources currently stand at: 1
1
1.8Moz gold
20.2Moz silver, 104kt zinc
283kt nickel, 40.5kt cobalt and 296.2kt manganese (50% owned)
As announced to the ASX on 1 August 2024, also see Tables and Confirmations on Pages 23-24.
Page 6 of 26
Penny’s Find Gold Project
The 100% owned Penny’s Find gold project is located 50km northeast of Kalgoorlie-Boulder in
the heart of the Western Australian goldfields (Figure 1). The project presents an early
underground development and production opportunity to generate cash under a toll milling and
underground contractor / JV arrangement. 1
The Pennys Find MRE was updated in the December 2023 quarter from recent drilling, which
extended the resource at depth and added some peripheral lodes, primarily to the North. The
deposit also remains open at depth and will be tested from underground drilling positions. 1,2
The additional drilling was included in a Resource update completed during the March 2024
quarter which estimated a 63,000 ounce underground resource for Pennys Find (Table 1).
Table 5: Pennys Find Minerals Resource Estimate (JORC 2012) 3
Pennys Find underground (<260m RL) at 1.5g/t Au cut-off grade
Resource category
Indicated
Tonnes (t)
Grade (g/t Au)
Gold metal (oz)
305,000
5.19
51,000
Inferred
123,000
3.02
12,000
Total
429,000
4.57
63,000
A prefeasibility study using underground mining methods continued during the quarter. In line
with the current inflationary environment, the Company sought updated input pricing for the
financial analysis from a reputable underground mining contractor to increase the robustness of
the economic analysis for the study. 1
Kalpini gold project
During the June 2024 quarter, AMC Consultants were engaged to undertake an Ore Reserves
Study on Kalpini using open pit mining methods cutting back the existing Gambia and Camelia
open pits, and with a potential new pit in the Atlas area. Input costs were based on recent contract
pricing received for Boorara, and AMC reviewed Horizon’s data in relation to the modifying
parameters for the Ore Reserve, inclusive of the resource model and estimate, hydrogeological
and geotechnical studies.
Initial optimisation showed strong cashflows at the current gold price with the project being quite
price sensitive to both a cost and commodity price perspective. To gain increased confidence in
the pricing, the Company sought pricing from a reputable contractor based on an indicative
schedule for Kalpini provided by AMC. Updated pricing was received late in the quarter from the
contractor, with reopitmisation and design work now restarted based on the revised data.
Burbanks Project
Numerous zones within previously drilled holes have been identified as potentially intercepting
unmodelled ore lodes. Of the 75 holes identified, sampling results were returned for 18 holes as
reported in the March 2024 quarter by GSR. The remaining samples were received during the
quarter. No significant assays were received from these samples however the information shall
assist evaluating geological continuity and resource confidence.
Subject to the end of the quarter, the company announced an equity placement of which $3M
and 20,000m shall be drilled at Burbanks over the course of the next two years. Work is ongoing
to assess the potential for medium-term cashflows from near surface resources, potentially
1
See forward Looking and Cautionary Statements on Page 26. 2 As announced to the ASX on 29 December 2024
and see tables and confirmation on page 23.
Page 7 of 26
adding to the pipeline of projects Horizon currently has underway. Flora and Fauna surveys shall
be undertaken in the next quarter over spring near Burbanks South.
Nimbus Silver-Zinc Project 1
The Nimbus silver-zinc project, adjacent to the Boorara gold mine, 17km east-southeast of
Kalgoorlie-Boulder in the goldfields of Western Australia (Figure 1). The Nimbus Project is sits
2km east of the Company’s cornerstone Boorara project. The Nimbus mine site is on granted
mining leases M26/490 and M26/598 and easily accessed from the Kalgoorlie-Bulong Road via
an unsealed haul road. The Nimbus Project was mined in two stages from January 2004 - May
2006. Ore treatment was undertaken at an onsite mill utilising a Merrill-Crowe circuit. The Nimbus
Silver-Zinc Project was placed on care and maintenance in 2007 after producing 3.6Moz of silver
from 318kt of ore processed at a grade of 353g/t Ag.
MacPhersons Resource Limited (MRP) completed due diligence in August 2011 and purchased
the Nimbus property on 8th September 2011 from Kalgoorlie Ore Treatment Company Pty Ltd
(KOTC). In June 2019 the former Intermin Resources Limited finalised its merger with MRP,
becoming Horizon Minerals Ltd.
The old plant was removed and the area rehabilitated. The mine office and other infrastructure
is still in place and operational and on grid power and is currently being used by the management
and technical teams operating the Boorara mine site.
As a consequence of the historic mining and processing of ore, Nimbus was classified as a
contaminated site by the Department of Water and Environmental Regulation (DWER) in 2006
as ‘Contaminated – Remediation Required’ under the Contaminated Sites Act. This has
restricted some activities at the site. Following the merger with MacPherson Resources in 2019,
Horizon undertook a Mandatory Review Audit process under the Contaminated Sites Act to carry
out cleanup works to reclassify the site. The Company completed the clean-up in 2022 and the
MAR report was completed and submitted to DWER to reclassify the site during the current
September 2024 quarter. The MAR report is currently under assessment.
An independent review by Australian Mining Consultants (AMC) and Sedgmen was
commissioned in 2022 to assess the historic data, mine optimisations and metallurgical work to
evaluate the optimal pathway forward for the project. The review highlighted the potential of the
project through underground mining the fresh higher-grade ore below the historic Discovery pit
and generating a silver and a zinc concentrate for sale to potential offtake partners. A gold
concentrate was also assessed to improve overall life of mine given the need for additional
tonnage to underpin a concentrator at site.
Given the drilling success to date along the Gretel-Nimbus-Brindabella trend and the potential
for repeat high grade lenses at Nimbus deeps and along strike, a drilling campaign has been
designed to assess untested drilling targets identified below the Nimbus pits.(Figure 4 and Long
section through showing open zones down dip/plunge extensionFigure 5).
Cautionary Statement – Exploration Target
The potential quantity and grade of the Exploration Target is conceptual in nature. There has been
insufficient exploration to estimate a Mineral Resource and there is no certainty that further exploration
work will result in the determination of mineral resources. See the basis of exploration target announced to
the ASX on 28 August 2024 on pages 6 and 15-17, also Tables on pages 21-24, Competent Persons
Statement on Pages 18 of that announcement.
1
As announced to the ASX on 28 August 2024 and see tables and confirmation on page 24 and see forward Looking
Page 8 of 26
and Cautionary Statements on Page 26.
Figure 4: Long section through Ag Lode 211 showing down dip/plunge extension
Figure 5: Long section through showing open zones down dip/plunge extension
1
As announced to the ASX on 9 December 2020, see also Tables and Confirmations on Page 23.
Page 9 of 26
ACQUISITIONS AND DIVESTMENTS
The Company entered into separate option and sale agreements with Metal Hawk Limited (ASX:
MHK) over its Yarmany West tenure as announced to the ASX on 5 July 2023, and Dundas
Minerals Limited (ASX: DUN) over its Baden Powell and Windanya tenements as announced to
the ASX on 30 August 2023. Both options are for a term of 24 months and should either or both
parties exercise their respective options, there is potential for Horizon to receive additional
revenue via cash and/or shares. For further information please refer to the respective
announcements.
Subsequent to quarter end, Horizon and Poseidon Nickel Limited (ASX: POS) (Poseidon) have
agreed to a merger to be conducted by way of Schemes of Arrangement under the Corporations
Act 2001 (Cth), whereby Horizon will acquire 100% of the fully paid ordinary shares in Poseidon
(Share Scheme) and 100% of the unlisted Poseidon options (Options Scheme, and together with
the Share Scheme, the Schemes), subject to the satisfaction of various conditions.
The proposed transaction will consolidate Horizon’s large gold resource and Poseidon’s Black
Swan processing infrastructure in the Kalgoorlie-Coolgardie-Lake Johnston districts. The
combination provides a pathway for sustainable, long-term gold production and cashflow as an
independent mid-cap producer. 1
RICHMOND VANADIUM PROJECT
The Richmond Vanadium Project is located 650 km west of Townsville and 250 km east of Mt
Isa in NW Queensland (Figure 8) and is owned 100% by RVT with Horizon owning 8.94% of
RVT. The project tenements cover ~1,400 km2 of Cretaceous Toolebuc Formation and the
advanced Lilyvale deposit north of Richmond.
As announced to the ASX on the 13 December 2022, RVT (ASX: RVT) completed its IPO raising
$25 million (before costs) and listed on the ASX. As part of the IPO, eligible Horizon shareholders
were issued 20 million RVT shares via an in-specie distribution with 19.8 million RVT shares
retained by the Company representing 8.94% of RVT’s issued capital. The current value of the
Company’s holding in RVT can be seen in the Corporate / Finance section below.
Figure 6: Richmond Vanadium Project location and surrounding infrastructure
Page 10 of 26
For more information on Richmond Vanadium Technology and the project, we refer you to their
website at www.richmondvanadium.com.au or the ASX under ticker code RVT.
WHITE RANGE GOLD PROJECT (Divested)
Horizon has divested the White Range gold project in the Northern Territory to Red Dingo
Corporation Pty Ltd. The Company is currently attending to some remediation issues at the site
prior to making application for return of environmental bonds held by the Northern Territory
Department of Primary Industry and Resources.
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
The Company recognises the importance of Environment, Social and Governance (ESG) factors
and is committed to continuous improvement in this regard. During the quarter, a review
continued of all internal policies, procedures, and governance principles to identify improvements
and opportunities to ensure we meet or exceed our corporate license to operate.
The Company previously worked with BDO Global to conduct an analysis of the business to
identify opportunities to improve the Company’s ESG performance. Materiality surveys were
completed for both internal and external stakeholders and completed a workshop to map the
opportunities and generate an initial sustainability report. The aim of the process is to develop
systems and processes to ensure we meet or exceed our social license to operate and adopt the
sustainability report covering current and future activities.
Waste rock, soil and ore samples were received for Phillips Find during the quarter for
characterisation work as part of the baseline data required for environmental approvals. The
Mining Proposal was submitted and subsequently approved during the quarter.
CORPORATE / FINANCE
In line with the ASX compliance reporting the Company released its Annual Report and Corporate
Governance Statement 2024 during the quarter.
During the quarter, the Company was pleased to advise the appointment of experienced mining
leader Mr Warren Hallam as a non-executive director to the Horizon board. Non-executive
directors Mr Jon Price and Mr Chris Hansen resigned from the board.
Total cash at bank as at 30 June 2024 was A$1.5 million. In addition, the Company holds
investments in ASX listed companies with a current value of approximately A$7.6 million (See
Table 7). The company sold the first tranche of its listed investments in Ora Banda Mining Limited,
selling 1,063,094 shares for proceeds of $532,943. Subsequent to the quarter, the Company
announced a two tranche share placement of $14.0m to institutions and sophisticated investors
to support the proposed merger of the Company and Poseidon Nickel Limited. 1
As previously announced to the ASX on 19 October 2022 and 23 November 2022, the Company
executed financial agreements with Nebari LLC for a US$5 million Convertible Loan Facility in
two tranches of US$2 million and US$3 million respectively to pay for and advance the Cannon
gold project. Both tranches have been drawn down. For further information and terms of the Loan
Agreement, we refer you to the ASX announcement dated 19 October 2022.
In accordance with ASX Listing Rule 5.3.5, A$21k was paid to related parties or their associates
during the quarter, comprising Non-executive and Executive Director fees and superannuation.
Page 11 of 26
1
As announced to the ASX on 25 October 2024 and see Forward-looking and Cautionary Statement on Page 26.
Table 6: Issued Share Capital
Issued at 30
September 2024
1,118,559,102
Class of securities
Fully Paid Ordinary Shares (HRZ)
Listed Options (HRZOB, strike price 9.7c, expiry 30 Jun 2025)
51,871,015
Listed Options (HRZO, strike price 8.7c expiry 21 Sep 2025)
26,723,151
Director & Employee Performance Rights
0
Table 7: Listed Company Investments
Company
Number
Value at 30 September 2024
Richmond Vanadium Tech.
19,833,363
1
$5,950,009
Ora Banda Mining
2,126,182 2
$1,339,498
Metal Hawk Limited
1,134,430 3
$192,853
4
$97,030
Dundas Minerals Limited
3,234,327
TOTAL
$7,579,390
1.
In mandatory escrow for 24 months to 13 December 2024
2.
In mandatory escrow for 3, 6 and 9 months (3 equal tranches out of mandatory escrow 9 July 2024, 9
October 2024 and 9 January 2025). Tranche 1 sold in during the quarter, two tranches remain.
3.
Liquid asset (out of mandatory escrow from 4 January 2024)
4.
Liquid Asset (out of mandatory escrow from 29 February 2024)
This quarterly report has been authorised by the board of directors for release.
Julian Tambyrajah
CFO & Company Secretary
28 October 2024
For further information contact Horizon on:
T: + 61 8 9386 9534
Page 12 of 26
APPENDICES
TENEMENT SCHEDULE – SEPTEMBER 2024
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
L26/261
100%
-
-
M26/346
100%
-
-
M26/499
100%
-
-
M26/549
100%
-
-
M26/621
100%
-
-
P26/4256
100%
-
-
P26/4579
100%
-
-
P26/4580
100%
-
-
MLA26/855
100%
-
-
PLA26/4318
100%
-
-
E26/220
100%
-
-
P24/5143
100%
-
-
P24/5144
100%
-
-
P24/5145
100%
-
-
P24/5146
100%
-
-
P24/5147
100%
-
-
P24/5148
100%
-
-
P24/5149
100%
-
-
P24/5150
100%
-
-
P24/5151
100%
-
-
P24/5152
100%
-
-
P24/5153
100%
-
-
P24/5154
100%
-
-
P24/5155
100%
-
-
P24/5156
100%
-
-
P24/5157
100%
-
-
P24/5158
100%
-
-
P24/5159
100%
-
-
P24/5160
100%
-
-
P24/5348
100%
-
-
P24/5415
100%
-
-
P24/5637
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BINDULI
BLACK FLAG
Page 13 of 26
TENEMENT SCHEDULE – SEPTEMBER 2024 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P24/5638
100%
-
-
P24/5639
100%
-
-
P24/5640
100%
-
-
E70/5980
100%
-
-
E70/5981
100%
-
-
ELA70/6551
100%
-
-
ELA70/6552
100%
-
-
ELA70/6553
100%
-
-
E70/6554
100%
100%
-
ELA70/6555
100%
-
-
E25/349
100%
-
-
E25/543
100%
-
-
E25/564
100%
-
-
L25/48
100%
-
-
L25/50
100%
-
-
L25/51
100%
-
-
M25/182
100%
-
-
M25/327
100%
-
-
M25/329
100%
-
-
M25/330
100%
-
-
M25/333
100%
-
-
M25/357
100%
-
-
P25/2365
100%
-
-
P25/2449
100%
-
-
P25/2633
100%
-
-
P25/2670
100%
-
-
P25/2733
100%
-
-
P25/2748
100%
-
-
P25/2755
100%
-
-
P25/2761
100%
-
-
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BLACK FLAG
BRIDGETOWN-GREENBUSHES
CANNON GOLD MINE
CHADWIN
P16/3121
Page 14 of 26
TENEMENT SCHEDULE – SEPTEMBER 2024 con
Share your feedback
Discover