CEO Presentation Amended AGM 2023
Released
Released
Announcement PDF
CEO PRESENTATION (AMENDED)
Annual General Meeting – 20 November 2023
Important disclaimers
Nature of Document
This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders,
related bodies, corporate, partners, affiliates, employees, representatives or advisers, make any representation
or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material it
contains. Nothing contained in the Presentation is, or may be relied upon, as a promise, representation or
warranty, whether as to the past or the future, and the Company hereby excludes all warranties that can be
excluded by law.
The Presentation
The presentation contains ‘forward-looking statements’. As set out in more detail on Slide 20, by their nature,
forward-looking statements involve known and unknown risks, uncertainties and other factors because they
relate to events and depend on circumstances that may or may not occur in the future, and assumptions which
may or may not prove to be correct (and may be beyond the Company’s ability to control or predict), any (or
all) of which may cause the actual results or performance of the Company to be materially different from the
results or performance expressed or implied by such forward-looking statements.
No representation is made that any forward-looking statement will come to pass, that any forecast result will
be achieved, or that any assumption on which a forward-looking statement is based is reasonable. Forwardlooking statements are made as at the date of this Presentation, and the Company disclaims any obligation or
undertaking to release any update of, or revision to, any forward-looking statement contained in this
Presentation. contains information relating to Mineral Resources estimates and Ore Reserves estimates. All
persons reviewing this Presentation should refer to the JORC resource statements and competent person
confirmations in the Appendix to this Presentation (slide 22).
Professional Advice recommended
All persons reviewing this Presentation should consider seeking appropriate professional advice before making
any investment decision. Neither the provision of the Presentation nor any information contained in the
Presentation or subsequently communicated to any person in connection with the Presentation is, or should be
taken as, constituting the giving of investment advice to any person.
Forward Looking and Cautionary Statement
As noted above, some statements in this Presentation regarding estimates or future events are forward looking
statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial performance.
Forward looking statements include, but are not limited to, statements preceded by words such as “planned”,
“expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”,
“nominal”, “conceptual” and similar expressions.
Forward looking statements, opinions and estimates included in this Presentation are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and industry
trends, which are based on interpretations of current market conditions. Forward looking statements are
provided as a general guide only and should not be relied on as a guarantee of future performance. Forward
looking statements may be affected by a range of variables that could cause actual results to differ from
estimated results and may cause the Company’s actual performance and financial results in future periods to
materially differ from any projections of future performance or results expressed or implied by such forward
looking statements. These risks and uncertainties include but are not limited to liabilities inherent in mine
development and production, geological, mining and processing technical problems, the inability to obtain
any additional mine licenses, permits and other regulatory approvals required in connection with mining and
third party processing operations, competition for among other things, capital, acquisition of reserves,
undeveloped lands and skilled personnel, incorrect assessments of the value of acquisitions, changes in
commodity prices and exchange rate, currency and interest fluctuations, various events which could disrupt
operations and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate financing
and management’s ability to anticipate and manage the foregoing factors and risks. There can be no assurance
that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements. The forward looking statements in this Presentation are based on current
expectations, estimates, forecasts and projections about the Company and the industry in which it operates.
They do, however, relate to future matters and are subject to various inherent risks and uncertainties. Actual
events or results may differ materially from the events or results expressed or implied by any forward looking
statements. The past performance of the Company is no guarantee of future performance. You are cautioned
not to place undue reliance on any forward looking statement. The forward looking statements in this
Presentation reflect views held only as at the date of this Presentation.
None of Horizon Minerals Limited or its directors, officers, employees, agents or contractors makes any
representation or warranty (either expressed or implied) as to the accuracy or likelihood of fulfilment of any
future looking statement, or any events or results expressed or implied in any forward looking statement,
except to the extent required by law. The Company believes that it has a reasonable basis for making the
forward looking statements in the Presentation, including with respect to any production targets and financial
estimates, based on the information contained in this and previous ASX announcements.
2
Corporate summary
Capital Structure 1
Shares
M
700.9
Listed Options
M
51.8
Share price
A$
0.031
Market capitalisation
A$M
21.7
Cash and listed investments
A$M
14.8
Debt
A$M
7.7
Enterprise value
A$M
14.6
Board
5%
55%
40%
Top 20 (ex
Board)
Other
$0.08
7,000,000
$0.07
6,000,000
$0.06
5,000,000
$0.05
4,000,000
$0.04
3,000,000
$0.03
2,000,000
$0.02
$0.01
1,000,000
$0.00
0
Volume
1. As at 16 November 2023
Price
3
Projects overview
A premium gold mining address in the heart of the WA Goldfields
• Mineral Resources of 1.26Moz gold
• Total landholding of ~1,040km2 with 342km2
under option agreements
• Projects located around existing gold
processing facilities and the mining centre of
Kalgoorlie
• Combination of advanced deposits with
near-term production potential and earlier
stage exploration targets
• Gold focus alongside multi-commodity
exploration potential
• Consistent resource growth and new
discoveries across the portfolio
• Asset consolidation and divestment
opportunities remain under review
4
Growth strategy
Generating cash under a contract/JV mining and toll milling model
Develop a series of low
tonnage, high-grade
gold mines
First mine at Cannon
followed by Penny’s Find
and Rose Hill
Utilise existing regional
processing facilities
under a toll milling/joint
venture model
Operating cash flow to
fund future drilling,
studies and new mining
operations
Build scale over time to
reduce risk and capture
more transformational
growth options
Economic studies to
maximise optionality for
the 20Moz Ag Nimbus
silver-zinc project
5
Repositioning the business
Building a stronger foundation to support the growth strategy
• Divestment and monetisation of non-core assets to reduce overheads and expenditure commitments
• Reduction in corporate costs to align with current toll milling/joint venture operating model
• Continue to evaluate selective low cost, value accretive opportunities to add to the portfolio
• Unlock shareholder value through the completion of internal restructuring and the IPO of Richmond Vanadium
Technology Limited (ASX: RVT)
A$750,000
reduction of annual
project expenditure
commitments
33%
of tenure divested to
credible partners since
1 July 2022
Annual overheads have
fallen by
A$1.36M
for FY24
41%
reduction in total
headcount
6
Portfolio optimisation
Successful divestment of non-core projects to build shareholder value
• Divestment of non-core assets and sale of
listed investments generated proceeds of
A$8.9 million in the past ~18 months
• Funding to be directed towards exploration
and development of core projects
• Majority of divestments include a trailing
royalty or contingent payment to retain
exposure to future upside
• Reduced expenditure commitments and
administrative costs drives greater
operational efficiency
• Gold asset divestments largely completed
in the near-term
• New opportunities will continue to be
considered as they arise
Date
Project Area
Counterparty
Consideration (A$)
11/08/22
Kangaroo Hills & Phoenix
Greenstone Resources Ltd
(ASX: GSR)
$300k (cash)
19/01/23
Menzies gold project
Kingswest Resources Ltd
(ASX:KWR)
$1.3M (cash)1
05/07/23
Yarmany (7 tenements)
Metal Hawk Ltd (ASX:
MHK)
$400k (cash/shares)
17/07/23
Gunga West
FMR Investments
$300k2 (cash)
30/08/23
19 tenements in the Baden
Powell and Windanya area
Dundas Minerals Ltd (ASX:
DUN)
$500k (cash/shares)
23/10/23
62 East Kalgoorlie tenements
Northern Star Resources
Ltd (ASX: NST)
$3.1M cash3
Upcoming
Janet Ivy & Otto Bore
royalties
Vox Royalty Corp
$3.0M4 (shares)
Total Consideration
(1)
(2)
(3)
(4)
$8.9M (cash/shares)
Transaction announced 9 July 2019 for total consideration of $8 million including $3.375 million cash and $4.625 million in Kingswest shares at the time of the transaction.
Transaction announced 20 June 2022 for a total consideration of $400,000 including cash toll milling allocation into FMR’s 1Mtpa Greenfields Mill. $300,000 of the total payment
was received on 17 July 2023 following completion of conditions precedent.
Payment terms include additional potential deferred payments including discovery payments of A$20/ounce for any JORC compliant mineral resources located on the
tenements, capped at 2Moz and a NSR of 0.5% on all metals and minerals extracted
Transaction occurred 29 March 2021, with total consideration of $7.0 million separated into two payments. The second payment of $3.0 million trigger became due following
Vox’s receipt of cumulative royalty transaction payments totalling $750,000
Cannon Gold
Operation
Fully approved
All mining and development
works approvals secured
Fully funded
US$5 million facility with
Nebari Partners fully drawn
First gold in 2024
Subject to a final investment
decision by Horizon’s Board
8
Cannon Gold Operation
Pre-Feasibility Study shows a high-returning first mining project
• Maiden Ore Reserve of 135kt grading 4.1g/t Au for 17,680oz
Measure
• Potential for further growth down plunge and along strike
from future drilling programs (including underground)
Lateral Development
1,264m
Vertical Development
131m
Development Ore
15.0kt
Stoping Ore
120kt
Total Mined Ore
135kt
• A 200kt processing allocation has been reserved with FMR
Investments’ (FMR) Greenfields Plant in 2024
• Discussions with mining contractors and potential JV mining
partners are underway
• A formal Financial Investment Decision (FID) by the Horizon
Board is expected by June 2024
• First gold production expected within eight months of FID
• Open pit opportunities at Monument, Pinner and Golden
Ridge North are being investigated to supplement
underground feed at Cannon
Gold grade
PFS Outcome
4.1g/t Au
Stope Mining Recovery
95%
Milling Recovery
90%
Recovered Gold
15,910oz
Capital Costs (incl development)
A$4.3M
C1 Costs
A$1,644/oz
All in Sustaining Costs
A$1,873/oz
Free Cashflow at A$2,600/oz gold price
A$10.1M
Refer to ASX announcement 29 March 2022 for full Pre-Feasibility Study outcomes.
The Company confirms that all material assumptions included in the initial announcement dated 29 March 2022
continue to apply and have not materially changed.
9
Mining pipeline
Potential mining projects to follow Cannon
Penny’s Find
Rose Hill
Cannon Area
MRE: 43,000oz at 5.0g/t
MRE: 74,900oz at 4.6g/t
• Previous open pit mined
18,350oz
• Mine evaluation and
infrastructure review
• Monument and Pinner
targets located within
1km of Cannon
• Gold recovery of 92.4%
• Current strategy to mine
oxide and transitional
material via an open pit
• Decline from existing pit
• Successful drill program
in the June quarter 2023
• Resource update in the
December quarter 2023
• Feasibility studies to
follow
• Able to leverage Cannon
mining infrastructure
• Potential new open pits
• Underground mining of
fresh rock to follow
• Maiden MRE for
Monument of 25,000oz
• Maiden Ore Reserve in
June quarter 2024
• Follow-up drilling in the
September quarter 2023
• Resource updates for
both targets this year
10
Resource extensions
Penny’s Find mining centre open to the north and at depth
• Drilling at Penny’s Find in the June quarter
confirms the northern high grade plunge is
open at depth
• A two hole RC program was completed in the
September quarter to support conversion to
an Ore Reserve
• Updated MRE to be delivered in the
December 2023 quarter
• Underground drilling planned to test the
Penny’s high grade mineralisation between
400m-500m below surface
11
Project generation
Numerous high quality exploration and development opportunities centred on Boorara
• Potential open cut and underground options being investigated in the
Boorara deeps where thick, high-grade mineralisation has been drilled
(e.g., BODH027 57m @ 2.97g/t Au) at the Royal deposit
• Boorara regional exploration includes newly found prospects at
Kanowna South and untested VMS geochemical indicator signatures
close to Nimbus for further Ag-Zn potential
• Golden Ridge North including untested DHEM conductors within
nickeliferous komatiites and newly discovered mineralisation south of
Golden Ridge
• Lakewood discovery of anomalous Ni-PGE bedrock associated with
mafic/ultramafic intrusives
• Cannon regional exploration including Monument, Homerton as well as
nickel potential at Euston and Blair North
12
Project generation
High quality exploration opportunities abound at Binduli North
• Resource base expansion at the Crake/Coote projects (currently
87,450oz Au)
• Further drilling planned at Kestrel and Honeyeater prospects,
where significant high grade mineralisation was discovered in
2021
• High grade porphyry mineralisation discovered near Teal at Wills
Find opens a new, but sparsely drilled, trend associated with the
regional Abattoir Shear Zone
• New and untested mineralisation models at the Jacques-TealPeyes project with further drilling planned
• Regional exploration, particularly around the Janet Ivy shear where
numerous historic holes have encountered patchy clay hosted
gold, has not been followed up in adequate detail
13
Nimbus silver-zinc deposit
A high-grade VHMS system on the edge of Kalgoorlie
• Mineral Resource containing 20.2Moz
silver and 104kt zinc
• High-grade lode containing 6.4Moz
silver (774g/t) and 33kt zinc (12.8%)
• Potential to extend mineralisation along
strike and at depth below 400m
• Located adjacent to the Boorara gold
deposit with shared infrastructure
• Historical production of 3.6Moz of highgrade silver (352g/t Ag)
• Further economic studies to maximise
future optionality underway
14
Project generation – Lithium
Strategic location in a world-class lithium producing district
• Recent purchase of two lithium prospects
(Bridgetown-Greenbushes package) for $75k
cash and 4.0M Horizon shares
• Five additional Exploration Licence applications
to consolidated landholding
• Greenfield opportunity strategically located
near Bridgetown in WA, ~20km from the
world-class Greenbushes lithium operation
• Favourable geology and structure in a Tier-1
lithium region with substantial prospectivity
• Bridgetown-Donnybrook shear zone hosts
giant Greenbushes Sn-Ta-Li deposit and
continues south for another 20km
15
Our sustainability journey
Pathway to growing a sustainable and profitable business
Objective
Our journey
Data driven ESG strategy
To go beyond our obligations
and to continuously look for
ways to integrate sustainability
across our business.
Sustainability is a journey and
it is a business imperative to
lay robust sustainability
foundations to actively
monitor, measure and
improve on our material risks
and opportunities.
As our organisation grows and
we gather more data, we will
look to communicate our
progress with our
stakeholders.
16
Our sustainability strategy
Practical, data driven and fit for business scale
Established our Environmental, Social,
Governance (ESG) baseline early
Collected and verified our data against
international metrics
Aligned with global Sustainable
Accounting Standards Board (SASB)
Metals and Mining Framework
Conducted gap analysis and identified
areas of value creation
Conducted a materiality assessment
across our organisation and key
contractors to align internal and external
expectations around ESG
Adopted ESG technology to collect,
verify and report on our progress going
forward
17
Investment highlights
A WA Goldfields gold production and discovery growth story
Growth strategy reset to
a sequence of low
tonnage, high grade and
high margin gold mines
Utilise existing regional
gold processing facilities
under a contract/joint
venture operating model
Attractive valuation with
a low enterprise value
and the Cannon mining
operation fully funded
Build cashflow, build
scale and unlock more
transformation growth
opportunities
Reinvestment into
building mining pipeline
and continuing
exploration program
Assess opportunities to
rationalise the portfolio
to realise value and keep
overheads low
18
Contact
Grant Haywood
Chief Executive Officer
+61 (08) 9386 9534
admin@horizonminerals.com.au
www.horizonminerals.com.au
PO Box 1104 Nedlands WA 6909
19
Mineral Resource Estimate
Gold deposits
Project
Cutoff
Measured
Inferred
Indicated
Total
Au g/t
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Boorara OP
0.5
1.28
1.23
50,630
7.19
1.27
294,140
2.6
1.3
103,470
11.03
1.26
448,240
Golden Ridge
1.0
0.47
1.83
27,920
0.1
1.7
2,800
0.52
1.82
30,720
Golden Ridge North
0.8
0.65
1.15
24,260
0.77
1.30
32,340
1.42
1.23
56,600
Cannon UG
1.0
0.19
4.80
28,620
0.1
2.3
3,450
0.23
4.29
32,070
Monument
0.8
0.39
1.97
25,000
0.39
1.97
25,000
Pennys Find
1.5
0.20
5.45
35,000
0.1
3.6
8,000
0.27
4.99
43,000
Kalpini
0.8
1.40
2.43
108,000
0.5
2.0
31,000
1.87
2.33
139,000
Rose Hill UG
2.0
0.33
4.50
47,100
0.2
4.8
27,800
0.51
4.60
74,900
Rose Hill OP
0.5
0.09
2.00
6,100
0.29
2.00
18,400
Jacques-Peyes
0.8
0.97
2.59
81,000
0.8
2.0
49,000
1.74
2.32
130,000
Teal
1.0
1.01
1.96
63,680
0.8
2.5
64,460
1.81
2.20
128,140
Crake
0.8
1.33
1.47
63,150
0.1
1.3
3,300
1.42
1.46
66,450
Coote
1.0
0.4
1.5
21,000
0.42
1.54
21,000
Capricorn
0.5
0.7
1.2
25,500
0.70
1.20
25,500
Baden Powell
0.5
0.6
1.2
23,000
0.60
1.20
23,000
8.16
1.60
420,120
23.22
1.69
1,262,000
Total
0.19
1.47
2.00
1.33
12,300
62,930
13.83
1.75
779,000
Refer to ASX announcement 19 July 2023 for full disclaimers and JORC Table 1.
20
Ore Reserve Estimate
Cannon gold deposit
Category
Tonnes
Au (g/t)
Ounces
Proven Reserve
–
–
–
Probable Reserve
135,000
4.1
17,680
Total Reserve
135,000
4.1
17,680
Refer to ASX announcement 29 March 2022 for full disclaimers and JORC Table 1.
21
Mineral Resource Estimate
Nimbus silver-zinc project
Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au)
Category
Mt
Ag (g/t)
Au (g/t)
Zn (%)
Ag (Moz)
Au (kt)
Zn (kt)
Measured Resource
3.62
102
0.09
1.2
11.9
10
45
Indicated Resource
3.18
48
0.21
1.0
4.9
21
30
Inferred Resource
5.28
20
0.27
0.5
3.4
46
29
Total Resource
12.08
52
0.20
0.9
20.2
77
104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2,800g/t Ag top cut)
Category
Mt
Ag (g/t)
Zn (%)
Ag (Moz)
Zn (kt)
Measured Resource
0
0
0
0
0
Indicated Resource
0.17
762
12.8
4.2
22
Inferred Resource
0.09
797
13.0
2.2
11
Total Resource
0.26
774
12.8
6.4
33
Refer to ASX announcement 24 March 2023 for full disclaimers and JORC Table 1.
22
Mineral Resource disclosure
Competent Person Statements
The information in this presentation that relates to Mineral Resources is based on information compiled by Mr David O’Farrell, other than for Golden Ridge North and Monument. Mr
O’Farrell is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employees of Horizon Minerals Ltd. The information was prepared under the JORC Code
2012. Mr O’Farrell has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a
Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’. Mr O’Farrell consents to the
inclusion in this report of the matters based on their information in the form and context in which they appear. The Company confirms that the form and context of the Competent
Person’s findings in relation to those Mineral Resources estimates have not been materially modified from the original market announcements.
The Information in this presentation that relates to Ore Reserves is based on information compiled by Mr Anthony Keers, a Competent Person who is a Member of the Australasian
Institute of Mining and Metallurgy. Mr Keers is an independent consultant of Horizon. Mr Keers has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr Keers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The
Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material
assumptions and technical parameters underpinning the estimates in those announcements continue to apply and have not materially changed.
The information in this presentation that relates to the Estimation and Reporting of Gold Mineral Resources at the Golden Ridge North and Monument deposits is based on information
compiled by Mr Stephen Godfrey, a Competent Person, who is a current Fellow of the Australian Institute of Mining and Metallurgy (FAusIMM 110542) and Member of the Australian
Institute of Geoscientists (MAIG 3993). Mr Godfrey is the Resource Development Manager for Horizon Minerals Ltd and has sufficient experience relevant to the style of mineralisation
and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Godfrey consents to the inclusion in the report of matters based on the information in the form and context in which it
appears.
Information in this announcement that relates to exploration results is based on information compiled by David O’Farrell who is the Exploration Manager of Horizon Minerals. Mr
O’Farrell is a Member of The Australian Institute of Mining and Metallurgists (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity that he is undertaking, to qualify as Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr O’Farrell consents to the inclusion in the document of the information in the form and context in which it appears.
Share your feedback
Discover