Presentation Noosa Mining Conference
Released
Released
Announcement PDF
An Emerging Standalone Gold Producer
Noosa Mining Investor Conference | 23-25 July 2025
Important disclaimers
Nature of Document
This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders, related
bodies, corporate, partners, affiliates, employees, representatives or advisers, make any representation or warranty
(express or implied) as to the accuracy, reliability, relevance or completeness of the material it contains. Nothing
contained in the Presentation is, or may be relied upon, as a promise, representation or warranty, whether as to the
past or the future, and the Company hereby excludes all warranties that can be excluded by law.
The Presentation
The presentation contains ‘forward-looking statements’. As set out in more detail on Slide 20, by their nature,
forward-looking statements involve known and unknown risks, uncertainties and other factors because they relate to
events and depend on circumstances that may or may not occur in the future, and assumptions which may or may
not prove to be correct (and may be beyond the Company’s ability to control or predict), any (or all) of which may
cause the actual results or performance of the Company to be materially different from the results or performance
expressed or implied by such forward-looking statements.
No representation is made that any forward-looking statement will come to pass, that any forecast result will be
achieved, or that any assumption on which a forward-looking statement is based is reasonable. Forward-looking
statements are made as at the date of this Presentation, and the Company disclaims any obligation or undertaking
to release any update of, or revision to, any forward-looking statement contained in this Presentation. contains
information relating to Mineral Resources estimates and Ore Reserves estimates. All persons reviewing this
Presentation should refer to the JORC resource statements and competent person confirmations in the Appendix to
this Presentation (slide 22).
Professional Advice recommended
All persons reviewing this Presentation should consider seeking appropriate professional advice before making any
investment decision. Neither the provision of the Presentation nor any information contained in the Presentation or
subsequently communicated to any person in connection with the Presentation is, or should be taken as,
constituting the giving of investment advice to any person.
Forward Looking and Cautionary Statement
As noted above, some statements in this Presentation regarding estimates or future events are forward looking
statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward
looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”,
“projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”,
“conceptual” and similar expressions.
Forward looking statements, opinions and estimates included in this Presentation are based on assumptions and
contingencies which are subject to change without notice, as are statements about market and industry trends,
which are based on interpretations of current market conditions. Forward looking statements are provided as a
general guide only and should not be relied on as a guarantee of future performance. Forward looking statements
may be affected by a range of variables that could cause actual results to differ from estimated results, and may
cause the Company’s actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward looking statements. These risks
and uncertainties include but are not limited to liabilities inherent in mine development and production, geological,
mining and processing technical problems, the inability to obtain any additional mine licenses, permits and other
regulatory approvals required in connection with mining and third party processing operations, competition for
among other things, capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments
of the value of acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations,
various events which could disrupt operations and/or the transportation of mineral products, including labour
stoppages and severe weather conditions, the demand for and availability of transportation services, the ability to
secure adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements. The forward looking statements in this Presentation are based on current expectations,
estimates, forecasts and projections about the Company and the industry in which it operates. They do, however,
relate to future matters and are subject to various inherent risks and uncertainties. Actual events or results may differ
materially from the events or results expressed or implied by any forward looking statements. The past performance
of the Company is no guarantee of future performance. You are cautioned not to place undue reliance on any
forward looking statement. The forward looking statements in this Presentation reflect views held only as at the date
of this Presentation.
None of Horizon Minerals Limited or its directors, officers, employees, agents or contractors makes any
representation or warranty (either expressed or implied) as to the accuracy or likelihood of fulfilment of any future
looking statement, or any events or results expressed or implied in any forward looking statement, except to the
extent required by law. The Company believes that it has a reasonable basis for making the forward looking
statements in the Presentation, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Authorised for release to the ASX by the Board of Directors of Horizon Minerals Ltd.
2
Enhanced Board and Leadership
Ashok Parekh – Non-Executive Chairman
Grant Haywood – Managing Director
•
Chartered accountant with over 40 years’ experience who owns a large
Accounting Practice in Kalgoorlie, which he has operated for 38 years
•
Mining Engineer with over 30 years’ experience in underground and open
cut mining operations
•
Awarded the Centenary Medal in 2003 by the Governor General of
Australia and was awarded the Meritorious Service Award by the
Institute of Chartered Accountants, the highest award granted by the
institute in Australia
•
Extensive mining experience managing mining projects from feasibility
through to operations for junior and multi-national companies including
Goldfields Ltd, Saracen Mineral Holdings and Phoenix Gold Ltd
Warren Hallam – Non-Executive Director
•
•
•
Highly experienced metallurgist and mineral economist with over 25
years’ experience financing, developing and operating base metal
and gold projects
Currently also a Non-Executive Director of Poseidon Nickel
(appointed in June 2022)
Has held numerous board and senior executive positions within the
resources sector including Metals X, Metals Exploration and Westgold
Rob Waugh – Non-Executive Director
•
•
•
Senior mining executive with more than 35 years’ experience in the
resources sector, operating predominantly in gold and base metals
Strong track record of exploration and discovery success through
studies advancement and M&A
Held senior exploration management roles at WMC Resources and
BHP and was previously the Managing Director of Musgrave
Minerals, which was acquired for A$200M by Ramelius Resources in
2023.
Julian Tambyrajah – CFO, Company Secretary
•
•
Certified Practicing Accountant and Chartered Company Secretary with
more than 30 years’ experience in commercial and corporate finance
roles in Australia and overseas resource companies, 20 years at CFO level
Extensive experience covering financial and technocommercial areas
including accounting, supply and logistics, project evaluation, feasibility
studies, construction and operations management across small and large
organisations
Stephen Guy – Chief Geologist
•
Geologist with over 25 years of experience in exploration, production and
project start-ups including open pit and underground operations
•
Developed a mining career across Western Australia, NSW and Queensland
with companies including BHP, Newcrest, St Barbara Gold, FMG and
Gindalbie Metals focusing on gold, copper, nickel, base metals and iron ore
3
3
Horizon Minerals – at a glance
Capital structure
Units
Existing
Share price
$/sh
$0.048(1)
No. of ordinary shares
M
2,888.9
Market capitalization
$M
138.7
Cash and cash equivalents
$M
~31.4(1)
Debt
$M
5.7(1)
Enterprise value
$M
113.0
1.8MOZ
Gold Mineral Resource from
30.55Mt @ 1.84 g/t Au
Notes:
(1) As at 17 July 2025, cash and equivalents (unaudited).
(2) Refer ASX announcement dated 6 May 2024
+$30M
Estimated free cash flow from
Boorara ore sale agreement2
2.2Mtpa
Black Swan processing facility
located 40km N of Kalgoorlie
1,309km²
Large, strategic WA Goldfields
landholding
4
Our strategy
Defined pathway to becoming a new independent Australian gold producer
Inflection point for
steady cash flow
generation
Control of 100%-owned
processing
infrastructure
Large resource base to
support standalone
gold production
•
Steady state gold
production achieved
•
•
•
Balance sheet to
strengthen under strong
gold price environment
Refurbishment studies to
be completed by end of
2025
Mining studies underway
targeting initial 5-year
mine plan
•
•
•
Cash flows support
upcoming exploration
drilling and technical
studies
Future exploration focused
on defining mineable
ounces to support Black
Swan feed
Large resource base
supports infrastructure
refurbishment to extend
mine life
•
Resource drilling program
has commenced
All elements in
place to support
aspirational target
to become a
~100kozpa
producer
5
A strategic project portfolio
1.8Moz of Resources; 2.2Mtpa processing facility; 1,309km2 of exploration tenure
• Acquisition of Poseidon completed in February 2025,
granting Horizon ownership of the 2.2Mtpa Black Swan
processing facility (currently on care & maintenance)
• Estimated replacement value of +$150M
• Potential for low-capex refurbishment and
conversion for gold processing
• Large consolidated Resource base and extensive
exploration tenure in an attractive geological position
centred around Kalgoorlie / Coolgardie
• A reinvigorated exploration strategy focused on
defining mineable ounces for Black Swan
• Future drilling weighted towards upgrading
Resource confidence and extending Resources at
baseload deposits
• Reinvigorated exploration focus, targeting a robust
initial 5-year mine plan
• Expedited pathway to becoming a sustainable, high
margin gold producer within the next 18-24 months.
• Targeting first gold production of Black Swan by end
of 2026
6
Portfolio overview
Complementary assets with wide Resource growth potential
Boorara Gold Project
Continuous gold production via an Ore Sale
Agreement
• First gold pour from the Boorara Gold Project
achieved on 14 January 2025
• Binding Ore Sale Agreement for processing 1.24Mt of
Boorara ore at Paddington until Q2 2026
• Cash flows of +A$30M1 at gold price of A$3,600/oz
from Boorara to support Black Swan refurbishment
study work and future exploration drilling
• Treatment to date of 303 kt @ 0.89g/t Au for 8,015
oz sold at an average gold price of A$4,977/oz,
generating ~A$39.9M in revenue (unaudited) 2
• Current gold price now above A$5,000/oz
(1) For full exploration and production details, refer to ASX announcement dated 6 May 2024, 31 March 2025 and 29 April 2025
(2) As of 21 July 2025.
8
Phillips Find
Delivery of additional gold ounces under a toll
milling agreement
• Low financial risk Joint Venture (JV) Agreement with mining
specialists BML Ventures Pty Limited (BML) to fund all project
costs and undertake all management, technical, operational and
maintenance roles.
• Up to 200kt of ore to be processed at FMR Investments (FMR)’
Greenfields mill under greenfields toll milling agreement
• First gold pour from Phillips Find achieved on 24 February 2025
• Processing of ore parcels from Phillips Find consisted of 56,300
dmt @ 1.63g/t for 2,807 oz at an average price of $4,894/oz,
generating ~$13.7M to the Phillips Find JV (2)
• New toll milling agreement executed to treat 70,000t of ore in
September/October 2025 to be processed at Focus Minerals
Limited’s (Focus) Three Mile Hill processing plant
• Additional 80,000t processing capacity at the Greenfields mill
which can be used for Horizon ore.
(1) For full exploration and production details, refer to ASX announcement dated 13 May
2024, 7 August 2024, 31 March 2025 and 29 April 2025
(2) As announced to ASX 18 June 2025.
9
Poseidon’s Black Swan processing facility
2.2Mtpa processing facility strategically located ~40km north of Kalgoorlie
• 2.2Mtpa processing facility (C&M) and associated
infrastructure
• Optionality for an initial 1.5Mtpa throughput
• Black Swan concentrator readily amenable to
processing gold through cost-effective
refurbishment and addition of new CIL circuit
• All requisite mining, regulatory and environmental
approvals in place with dedicated grid power and
water access
• Proximal to >1Moz gold resources along with
several prospective greenfields targets(1)
• Strategically located within 40km of Kalgoorlie;
easy access to labour, spares and consumables
• GR Engineering appointed to lead engineering
study work program and has commenced mill
refurbishment and conversion studies
Notes: (1) There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
10
Poseidon’s Black Swan process facility
Existing flotation circuit and planned changes to facilitate gold production
Gold conversion
Carbon
in leach
Crush
Grind
Refurbishment
Flotation
Elution
Gold room
Au
Ag/Zn + Ni
Concentrates
Future refurbishment
option
11
Strong pipeline to support Black Swan
Horizon’s 30Mt of existing gold Resources with ~50,000m of drilling budgeted in FY25/261
Black Swan Ni
Nimbus Zn/Ag
Coote
Cannon
Greater Boorara
Crake
Burbanks
Phillips Find
Wilson’s
Teal
Penny’s Find
Boorara
Rose Hill
Kalpini
~300koz
~700koz
~480koz
Advanced drilling target
Resource definition &
expansion
Operations
Greenfields
Base metal project
Notes: (1) Expected to be funded by free cash flows from Boorara and Phillip’s Find.
12
Reinvigorated exploration strategy
Clear focus on improving Resource confidence and growing mineable ounces
• Resources of 1.8Moz on prolific geological structures
around Kalgoorlie / Coolgardie
• Continuous 50,000m drilling programme to expand and
improve confidence in current 1.8Moz gold resource1.
• Key targets for 2025 drilling include:
•
•
•
•
•
•
Burbanks
Wilsons
Greater Boorara
Coote-Crake
Penny’s Find
Kalpini
• Balance of resource infill, resource extension and new
discovery drilling to provide continuous news flow over the
remainder of 2025.
Notes: (1) Expected to be funded by free cash flows from Boorara and Phillip’s Find.
13
Burbanks project
Significant Resource upside to be unlocked from a key cornerstone asset with scale and grade
• Located on a granted mining lease 9km south of
Coolgardie
• Supported by a network of existing infrastructure
including grid power and sealed roads
• Historic production estimated at +420koz
• Combined MRE of 465.5koz @ 2.80g/t Au
• Large scale 297.6koz open pit and high-grade
underground (4.4g/t Au)
• Significant extension potential with only 30% of the
upper 500m mineralised horizon tested to date.1
• Minimal drilling completed since 2022
• Last Resource update added 188koz from 10,000m of
drilling
• ~30,000m drilling programme commenced at
Burbanks to support Black Swan five-year initial mine
plan
Burbanks Mineral Resource Estimate
Resource
Category
Indicated
Cut-off
Inferred
Total
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Burbanks OP
0.5
1.43
2.00
92,780
3.43
1.90
204,870
4.86
1.90
297,650
Burbanks UG
2.5/2.0
0.12
4.30
16,730
1.07
4.40
151,190
1.19
4.40
167,920
Notes:
(1) Refer to Greenstone Resources ASX announcement dated 5 July 2023 for all exploration details and see Confirmations slide 24.
14
Poseidon’s Black Swan – gold prospectivity
Untested gold anomalies emerging adjacent to the process plant infrastructure
• Limited previous gold focused exploration in the area – only 5%
of drill assays have tested for gold
• Drill intersections grading up to 6.41g/t Au
• Wide spaced soil sampling program completed over the entire
Black Swan tenement package in August 2024
• Numerous gold nuggets located
• Identified a new 6.5km long gold trend around Black Swan
• The most coherent anomaly, located at Wilson’s (North
Anomaly), is 1.4km by 1km in size and immediately north of the
existing nickel mines and associated infrastructure
• Infill sampling results awaited to refine high priority targets for
later in 2025
Notes:
(1) Refer to Poseidon Nickel ASX announcement dated 24 September 2025 for all exploration details
15
Platform for regional consolidation
>1Moz of gold resources in region are without a clear processing solution
• Opportunities for non-producers to access third
party gold processing infrastructure in the WA
Goldfields is becoming increasingly difficult
• Conversion of a 2.2Mtpa processing facility to
gold production has potential to unlock stranded
gold resources in the region
• Potential to partner with third parties via joint
venture, toll milling, and ore purchase
arrangements
• Further scope to unlock value through asset sales
or corporate transactions
• Horizon will assess these opportunities to add
mine life which are accretive to Horizon
shareholders
16
Operational timeline
Indicative timeline of upcoming cash flow and pathway to gold from Black Swan
Target key workstreams
(Forward 24 months)
Boorara gold production
Phillips Find gold production
Additional toll treatment/ore sales
2025
Q1
🗸🗸
🗸🗸
Q2
2026
Q3
Q4
Q1
Q2
Q3
Q4
Black Swan conversion studies
Black Swan refurb & conversion work
Mining studies
Black Swan gold processing
🗸🗸 First Gold Production
17
An Emerging Standalone Gold Producer
Sustained cash flow generation
from gold produced at Boorara
and Phillips Find
Pursuing a low-risk, low-capital
approach to gold production
through toll milling and ore sales
Current agreements allow for
consistent gold production
over the next +12 months
Black Swan study advancing to
support standalone gold
production strategy
Cash inflows of ~A$30M from
Boorara to support upcoming
activities
Black Swan conversion to gold
processing to be underpinned
by an initial 5-year plan
Ramp up of production aligned
with record gold prices of
>A$5,000/oz Au
Highly experienced Board and
Management with strong
regional expertise
Contact
Grant Haywood
Managing Director and CEO
+61 (08) 9386 9534
admin@horizonminerals.com.au
www.horizonminerals.com.au
PO Box 1064 West Perth WA 6872
Appendices
Mineral Resource Estimate
Gold projects
Project
Boorara OP
Cutoff
Indicated
Inferred
Total
Au g/t
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
0.5
1.12
1.22
43,700
-
6.85
1.28
281,100
2.56
1.26
103,500
10.53
1.27
428,300
1.43
2.02
92,800
3.43
1.86
204,900
4.86
1.90
297,700
0.12
4.26
16,700
1.07
4.39
151,200
1.19
4.38
167,900
0.54
2.40
2.09
12,700
0.73
2.32
54,400
0.00
2.27
208
0.00
2.27
208
1.82
-
0.19
0.48
-
41,700
27,900
0.05
1.71
2,800
0.53
1.81
30,700
0.65
1.15
24,300
0.77
1.30
32,300
1.43
1.23
56,600
0.19
4.80
2.28
3,500
0.23
4.29
32,100
0.92
1.11
32,800
0.92
1.11
32,800
1.02
-
0.05
0.06
-
28,600
2,100
0.27
1.25
10,800
0.33
1.21
12,800
0.31
5.19
51,000
0.12
3.02
12,000
0.43
4.57
63,000
1.40
2.41
108,600
0.47
2.03
30,700
1.87
2.31
139,300
0.33
4.49
47,100
0.18
4.78
4.60
74,900
0.09
2.05
6,100
0.29
1.99
18,300
0.97
2.59
80,700
0.77
1.98
-
0.51
-
-
27,800
49,200
1.74
2.32
129,800
1.01
1.96
63,700
0.80
2.50
64,500
1.81
2.20
128,100
1.33
1.47
63,100
0.08
1.27
3,400
1.42
1.46
66,500
0.42
1.54
21,000
0.42
1.54
21,000
0.66
1.20
25,500
0.66
1.20
25,500
0.60
1.20
23,000
0.60
1.20
23,000
Burbanks OP
0.5
Burbanks UG
2.5/2.0*
Phillips Find OP
0.5
Phillips Find UG
2
Golden Ridge
1
Golden Ridge North
0.8
Cannon UG
1
Monument
0.5
Pinner
0.5
Pennys Find
1.5
Kalpini
0.8
Rose Hill UG
2
Rose Hill OP
0.5
Jacques-Peyes
0.8
Teal
1
Crake
0.8
Coote
1
Capricorn
0.5
Baden Powell
0.5
Total
Measured
-
0.19
-
1.31
-
1.96
-
1 .33
12,300
55,900
-
-
-
15.75
-
1.85
-
935,300
-
13.43
1.88
Refer to ASX announcement 29 April 2025 and see confirmations on page 45. Horizon confirms that all material assumptions included in the initial announcement
dated 29 April 2025 continue to apply and have not materially changed.
811,600
30.49
1.84
21
Oz
1,802,900
Ore Reserve Estimate
Gold projects
Cannon Ore Reserve
Category
Tonnes
Au (g/t)
Ounces
Proven Reserve
–
–
–
Probable Reserve
135,000
4.1
17,680
Total Reserve
135,000
4.1
17,680
Reserve Category
Tonnes
(Mt)
Au (g/t)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
Tonnes
(Mt)
Au (g/t)
Gold Metal (kOz)
Proven
–
–
–
Probable
328.3
3.2
33.4
Total
328.3
3.2
33.4
Boorara Ore Reserve
Location
Boorara Open Pit
Penny’s Find Ore Reserve
Location
Penny’s Find UG
Reserve Category
Refer to ASX announcement 1 August 2024 and see confirmations on page 25.
22
Mineral Resource Estimate
Nimbus silver-zinc project
Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au)
Category
Mt
Ag (g/t)
Au (g/t)
Zn (%)
Ag (Moz)
Au (kt)
Zn (kt)
Measured Resource
3.62
102
0.09
1.2
11.9
10
45
Indicated Resource
3.18
48
0.21
1.0
4.9
21
30
Inferred Resource
5.28
20
0.27
0.5
3.4
46
29
Total Resource
12.08
52
0.20
0.9
20.2
77
104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2,800g/t Ag top cut)
Category
Mt
Ag (g/t)
Zn (%)
Ag (Moz)
Zn (kt)
Measured Resource
-
-
-
-
-
Indicated Resource
0.17
762
12.8
4.2
22
Inferred Resource
0.09
797
13.0
2.2
11
Total Resource
0.26
774
12.8
6.4
33
Refer to ASX announcement 1 August 2024 and see confirmations on page 24.
23
Mineral Resource & Ore Reserve disclosure
Confirmations
Horizon’s Gold Mineral Resources
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted from and was originally reported in Horizon’s ASX announcements: “Updated Boorara Mineral Resource Delivers a 34% Increase in
Gold Grade” (Boorara) 27 April 2021, “Group Mineral Resource Statement – Amended”, (Burbanks, Phillips Find) 1 August 2024, “High Grade Drill results and Resource Update for Rose Hill”, (Rose Hill, Golden Ridge) 4 February
2020, “Maiden Resources for Monument and Golden Ridge North” (Golden Ridge North), 19 July 2023, “Investor Presentation June 2022”, (Cannon) 31 May 2022, “Group Mineral Resource Statement – Amended”, (Monument,
Pinner) 1 August 2024, “Pennys Find Resource Update”, (Pennys Find) 29 December 2023, “Kalpini Gold Project Mineral Resource Update” (Kalpini) 28 September 2021, “Jacques Find- Peyes Farm Mineral Resource update”
(Jaques-Peyes) 15 September 2021, “Intermin’s Mineral Resources Grow 30% to over 560,000 Ounces”, (ASX:IRC) (Teal) dated 19 September 2018, “Updated Crake Resource improves in quality” (Crake) 7 September 2021, “Gold
resources increase to 1.24moz” (Coote, Capricorn, Baden Powell) dated 28 September 2022, each of which is available at www.asx.com.au.
Horizon’s Minerals Resources at Burbanks were originally reported by Greenstone Resources (GSR) in “Global Gold Resource Increases 57% to 520,134oz”, on 5 July 2023. Horizon Minerals resources at Phillips Find were originally
reported by Greenstone Resources (GSR) in “Interim Update Increases Resource by 128% to 332,114oz”, on 20 September 2022.
Horizon confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning
exploration results and the estimates in those announcements continue to apply and have not materially changed. The Company confirms that the form and context of the Competent Person’s findings in relation to those Mineral
Resources estimates or Ore Reserves estimates have not been materially modified from the original market announcements.
Non-gold Mineral Resources
The information is this Presentation that relates to Horizon’s exploration results and Mineral Resources estimates on the Nimbus Silver Zinc Project is extracted from and was originally reported in Intermin’s and MacPhersons’ ASX
Announcement “Intermin and MacPhersons Agree to Merge – Creation of a New Gold Company Horizon Minerals Ltd” dated 11 December 2018 and in MacPhersons’ ASX announcements “Quarterly Activities Report” dated 25
October 2018, “New High Grade Nimbus Silver Core Averaging 968 g/t Ag” dated 10th May 2016 and “Nimbus Increases Resources” dated 30th April 2015, and “Group Mineral Resources Statement - Amended”, 1 August 2024.
The information is this report that relates to Horizon’s Mineral Resources estimates on the Nimbus Silver Zinc Project was originally reported in Horizon’s ASX announcement: “Nimbus Silver Update” (Nimbus, Nimbus Expl Trgt)
28 August 2024 which is available at www.asx.com.au.
Horizon confirms that the form and context of the Competent Person’s findings in relation to those Mineral Resources estimates have not been materially modified from the original market announcements.
Gold Ore Reserves
The information in this report that relates to Horizon’s Ore Reserves is extracted from and was originally reported in Horizon’s ASX announcements “Positive Results for Cannon Underground Gold Project and Feasibility Study
Update”, (ASX:HRZ) (Cannon) dated 29 March 2022, and “Boorara Ore Reserve Supports Development” (Boorara) dated 1 August 2024, each of which is available at www.asx.com.au.
Horizon confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning
the estimates in those announcements continue to apply and have not materially changed. Horizon confirms that the form and context of the Competent Person’s findings in relation to those Mineral Resources estimates or Ore
Reserves estimates have not been materially modified from the original market announcements.
24
Share your feedback
Discover