Group Mineral Resources Statement - Amended
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
1 AUGUST 2024
GROUP MINERAL RESOURCES STATEMENT - AMENDED
Horizon Minerals Limited (ASX: HRZ) (the Company) wishes to update the market on the
announcement dated 25 July 2024 titled ‘Group Minerals Resource Statement’ has been revised
and updated to include various compliance matters related to the listing rules and JORC Code 2012.
The announcement dated 25 July 2024 titled ‘Group Minerals Resource Statement’ has been
replaced with announcement of today and is attached to this cover note dated 1 August 2024 titled
‘Group Minerals Resource Statement – Amended’.
Approved for Release by the Horizon Board
Julian Tambyrajah
Chief Financial Officer &
Company Secretary
Level 2, 16 Ord Street
West Perth WA 6005
T: +61 8 9386 9534
F: +61 8 9389 1597
E: info@horizonminerals.com.au
www.horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
GROUP MINERAL RESOURCES STATEMENT - AMENDED
Following the successful completion of the merger between Horizon Minerals Limited (ASX: HRZ)
and Greenstone Resources Limited (formerly ASX: GSR), additional resource model work and
reviews, the Company is pleased to provide a consolidated statement of group Mineral Resources
as of 30 June 2024.
HIGHLIGHTS
Mineral Resources currently stand at:
o
1.8Moz gold 1
o
20.2Moz silver, 104kt zinc 2
o
283kt nickel, 40.5kt cobalt and 296.2kt manganese (50% owned) 2
Mineral Resources are underpinned by the large cornerstone Boorara and Burbanks assets
Updated Mineral Resource Estimates (MRE) include a maiden MRE for Pinner, an update
for Monument and a revision for Boorara which is currently under an Ore Reserve Study
(ORS) from AMC Consultants
Changes to the gold MREs include:
o
Addition of 297,650oz from Burbanks open pit 3
o
Addition of 167,920oz from Burbanks underground 3
o
Addition of 13,000oz from Pinner 4
o
Addition of 3,000oz from Monument, and 4
o
Reduction of 20,240oz from Boorara 5
Large Mineral Resource base and ongoing studies pave the way for a development profile
aiming at sustained gold production and continuous cashflows
HORIZON MINERALS GOLD MINERAL RESOURCE ESTIMATE 1
Total
Measured
Indicated
Inferred
Total
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
1.31
1.34
56,300
15.74
1.85
935,081
13.66
1.85
811,373
30.55
1.84
1,802,764
Commenting on the Group MRE upgrade, Managing Director and CEO Mr Grant Haywood said:
“It is very pleasing to have the Burbanks and Phillips Find assets under single ownership with
Horizon’s complementary and extensive project base. Together this provides 1.8 million ounce gold
portfolio, which is a great platform to implement our near term strategy of cashflow from operations
and further growth into the medium and long term”.
1
See JORC Table 1 on page 43 and Mineral Resource Table and Confirmations on Page 37-39. 2 see Mineral Resource Table and
Confirmations on Pages 40-41. 3 see Mineral Resource Table and Confirmations on Pages 37-39. 4 see ASX Disclosures on page 6
and Mineral Resource Table and Confirmations on Page 37-39. 5 see ASX Disclosures on page 6 and Mineral Resource Table and
Confirmations on Page 37-39.
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an updated
Mineral Resource Statement for the Company’s gold projects located near Kalgoorlie-Boulder in the
heart of the Western Australian goldfields (Figure 1). In addition, following the merger with
Greenstone Resources, the Company has also added the Burbanks, Phillips Find and 50% owned
Mt Thirsty projects to the Company’s resources.
Figure 1: Kalgoorlie project area locations and surrounding infrastructure
The gold MREs include an updated Monument MRE and a maiden MRE for Pinner, both part of the
larger Cannon project area, and a review of the cornerstone Boorara project. A summary of the
revised MREs are as follows:
Monument 740,000t grading 1.18g/t Au for 28,000oz at a 0.5g/t Au cut-off grade 1
Pinner 330,000t grading 1.21g/t Au for 12,844oz at a 0.5g/t Au cut-off grade 1
Boorara 10.53Mt grading at 1.27g/t Au for 428,000oz at a 0.5g/t Au cut-off grade 2
1
see ASX Disclosures on page 6 and Mineral Resource Table and Confirmations on Page 37-39 and JORC Table 1 on page 43. 2 see
ASX Disclosures on page 6 and Mineral Resource Table and Confirmations on Page 37-39 and JORC Table 1 on page 99.
Page 2 of 213
Cannon, Monument and Pinner Project Overview
The Cannon deposit (Figure 1) is located 30 km east-southeast of Kalgoorlie in the Eastern
Goldfields region of Western Australia on granted mining leases M25/333 and M25/357. The Cannon
mine and surrounding area is dominated by mafic to ultramafic rocks of the Bulong Complex overlain
by a sequence of felsic volcanics, volcaniclastics and sediments. Lithologies present include
komatiitic mafics and ultramafics, peridotites, basalts and gabbros. Sedimentary rocks include
shales and cherts with rare, banded iron formation. The geological structure is complex and
dominated by the Cannon shear which is recognised as a key ingredient for local gold and possibly
nickel sulphide mineralisation.
The gold mineralisation at the adjacent Pinner deposit is similar to Cannon and consists small pods
of semi-continuous mineralisation with three dominant directions that highlight the structural
complexity observed at Pinner. The dominant lodes trend SW/NE, N/S, and E/W with cross cutting
faults influencing the geometry.
Gold mineralisation within the Monument deposit consists of two main zones oriented NNW and NW,
dipping steeply to the west. There is some indication of faulting through the centre of the mineralised
area.
Figure 2: Cannon Project area showing surrounding prospects
Page 3 of 213
The updated Mineral Resource Estimate (JORC 2012) for Monument is shown below: 1
Monument at 0.5 g/t lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
-
-
Inferred
0.92
1.11
33,000
Total
0.92
1.11
33,000
Measured
Gold Metal (Oz)
-
Indicated
The maiden Mineral Resource Estimate (JORC 2012) for Pinner is shown below: 1
Pinner at 0.5 g/t lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
Gold Metal (Oz)
Measured
-
-
Indicated
0.06
1.02
2,091
-
Inferred
0.27
1.25
10,753
Total
0.33
1.21
12,844
Boorara Overview
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1 km southwest of the Nimbus Silver-Zinc Project site where established offices are
connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
The updated Mineral Resource Estimate (JORC 2012) for Boorara is shown below: 2
Boorara at 0.5 g/t lower cut-off grade
Resource category
Measured
Tonnes (Mt)
Grade (g/t Au)
1.12
1.22
Gold Metal (Oz)
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
1
See JORC Table 1 on page 43 and Mineral Resource Table and Confirmations on Page 37-39 and ASX Disclosures on page 6. 2 See
JORC Table 1 on page 99 and Mineral Resource Table and Confirmations on Page 37-39 and ASX Disclosures on page 6.
Page 4 of 213
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 5 of 213
Listing Rule 5.8 Disclosures
Pinner and Monument
Regional Geology
The Project is located within the Bulong District of the East Coolgardie Mineral Field and is on the
Hampton Hill pastoral lease.
The Bulong South Project area lies within the Kurnalpi Terrane of the Norseman-Wiluna Greenstone
Belt. This terrane includes the former Gindalbie and Laverton Terranes. It is currently defined as
being bounded by the Ockerburry Fault System to the west and the Hootanui Fault System to the
east.
The Kurnalpi Terrane comprises a series of thin, linear north-north-westerly trending, fault bounded
domains of dominantly mafic–felsic volcanic sequences with prominent lateral facies changes.
Komatiite horizons are thin and discontinuous and more common to the west, with the major
occurrence centred on the Bulong Anticline. Locally, regions of calc-alkaline volcanic and epiclastic
deposits and banded iron-formation are found.
Monument – Local Geology
The Monument area is underlain by predominantly fine grained ultramafics, high-MgO basalts and
minor komatiites. There are also several black shale units which more than likely represent interflow
sedimentary horizons between the mafic and ultramafic flows. A small granitoid intrudes these
lithologies in the southern parts of M25/333.
The prospect geology consists of a series of narrow, NNW-trending felsic dykes intruding a package
of predominantly komatiitic ultramafics with minor basaltic flows. Late-stage NE trending brittle faults
cut the dykes in several places, however the only significant offset occurs near the middle of the
deposit, where there is also a change in orientation of the mineralisation from NNW in the north to
N-S in the southern zone. Modelling of the interpreted continuation of the main felsic dykes has
allowed for a high success rate in intercepting gold.
Gold mineralisation within the Monument deposit consists of two main zones oriented NNW and NW,
dipping steeply to the west. There is some indication of faulting through the centre of the mineralised
area. Anomalous intercepts are also associated with other felsic units and these interpreted crosscutting NE trending faults.
The best intersections occur within or on the margins of felsic intrusive units that run the length of
the deposit along the NW trend.
Page 6 of 213
Figure 1 - Monument Mineralised Lodes
Pinner – Local Geology
Pinner lies immediately south of Cannon and has been interpreted as an extension of the Cannon
mineralisation. Mineralisation is hosted within fine grained basaltic and ultramafic rocks and display
discrete alteration associated with quartz veining and lesser amounts of carbonate veining.
Petrological examination has identified an alteration assemblage of albite-quartz-biotite-pyrite with
carbonate associated with the gold mineralisation. Minor gold mineralisation is also associated with
thin felsic porphyry intrusives.
Page 7 of 213
Figure 2 - Pinner Lodes 2024
Drilling Techniques
Face sampling Reverse Circulation (RC) percussion drilling and HQ diamond core were used to
sample the deposit. RAB drilling from early reconnaissance work was not used in the resource.
Drill hole collar positions have been surveyed by Differential GPS to an accuracy of +/- 0.1m. The
grid system used for locating the collar positions of drill holes is the Geocentric Datum of Australia
(GDA94), Zone 51 (MGA Projection).
Topographic control in the area is provided by SRTM regional data and local mine site surveying.
Elevations are recorded in Australian Height Datum (AHD).
Down hole surveys used an Eastman single shot system or an EMS tool (Reflex EZ shot), by the
relevant drill contractor.
All drill holes were geologically logged.
Sampling and Sub-Sampling Techniques
RC drill holes were sampled at 1m intervals via a cone-splitter connected via a cyclone directly to
the drill stream, or via spear sampling for 2 m to 4 m composites. Samples were taken dry.
Page 8 of 213
Historically, individual RC drilling samples were cone split from the drill rig or put through a 3-tier
riffle splitter and collected into pre-numbered calico bags. Diamond core was sampled as half core.
Diamond core was sampled at geologically defined intervals no greater than 1.3 m and no less than
0.15 m. Sampling did not cross lithological boundaries.
Field duplicates were collected at every 10th metre mark on each hole. Certified Reference Material
(standards) were submitted with the field samples at a rate of 1:20.
Sample analysis method
Preparation and analysis of samples was undertaken historically by either Genalysis or
Minanalytical, and by SGS for the recent HRZ drilling.
Sample size presented for analysis was approximately 2 kg. Samples were pulverised to 85%
passing 75 micron, or 90% at 106 micron in the 2013-2016 programs. Each sample was completely
pulverised, to produce a 25 g, 40 g or 50 g charge for fire assay with AAS finish. Selected samples
from some programs were submitted for multi element analysis.
Pinner - Estimation methodology
Three primary mineralisation trends were identified at Pinner – E-W, NEE – SWW and ESE – WNW.
Continuous zones were flagged and modelled in Seequent Leapfrog Geo.
The 3D mineralisation models were use in block model construction and grade estimation in Geovia
Surpac.
Grade estimation for the Pinner deposit was carried out using linear estimation methods. A multipass estimation plan was used for all estimation domains. An Inverse Distance algorithm using a
power of two (ID2) was used to estimate Au only. Waste domains were not estimated.
Only samples from AC, RC and Diamond drill holes were used in the estimation of grades. No RAB
samples were used as annular return samples can become contaminated. High-grade outlier
samples were managed with top cutting.
Hard boundaries were used between domains so that a domain was estimated with only the samples
within that domain. No boundary was applied between different oxidation state material within a
domain.
Search ellipses were aligned with the mineralisation orientation. Search distances were set to ensure
adequate samples were found to make an estimate. Pass 1 used a search ellipse 40 m x 20 m x
10 m. Pass 2 expanded the sample search to 60 m and pass 3 to 80 m. Pass 4 used a minimum
sample requirement of 2. See figures below.
71% of blocks were estimated by the first estimation pass; 17% by the second pass and the
remainder by passes 3 and 4.
Bulk density was assigned to the model based on values used in the 2020 Cannon resource model.
The model and grade estimation were validated by visual inspection of the blocks compared to the
drilling, and statistically comparing average domain composite grades to model grades.
Page 9 of 213
No metallurgical assumptions have been applied to the mineral resource estimation. It is assumed
that the mineralisation at Pinner will produce similar recoveries to the adjacent Cannon Gold Mine,
when processed by a similar method.
No economic or other modifying factors have been applied to the MRE.
The Pinner MRE has been reported at a 0.5 g/t Au cut-off. Given the deposit’s proximity to
infrastructure and being adjacent to the mined Cannon open pit, the current price of gold and
comparison to similar operation in the Coolgardie/Kalgoorlie goldfields, 0.5 g/t Au is considered a
reasonable reporting cut-off grade by the Competent Person.
Monument - Estimation methodology
The geological model for Monument was constructed using Seequent’s Leapfrog Geo software.
Mineralised intervals were coded by lode and the lodes modelled as veins. A minimum 2 m downhole
interval was maintained. RC, Diamond and RAB drillholes were used to inform the geological model.
Vein boundaries were modelled to limit the distance projected from drillhole data.
Grade estimation for the Monument deposit was carried out using linear estimation methods. A multipass estimation plan was used for all estimation domains.
Ordinary Kriging was used to estimate Au only. Waste domains were not estimated.
Only samples from RC and Diamond drill holes were used in the estimation of grades. No RAB
samples were used as annular return samples can become contaminated.
High-grade outlier samples were managed with top cutting in selected domains.
Hard boundaries were used between domains so that a domain was estimated with only the samples
within that domain. No boundary was applied between different oxidation state material within a
domain.
Search ellipses were aligned with the mineralisation orientation. Search distances were set to ensure
adequate samples were found to make an estimate – Pass 1 40 m. Pass 2 expanded the sample
search to 60 m and pass 3 to 80 m. Pass 4 used a minimum sample requirement of 2 and a search
raduis of 160 m.
82% of blocks were estimated by the first estimation pass; 12% by the second; 5% in passes 3 and 4.
2% of blocks remain un-estimated.
The model and grade estimation were validated by visual inspection of the blocks compared to the
drilling; and statistically comparing average domain composite grades to model grades.
No metallurgical assumptions have been applied to the mineral resource estimation. The proximity
to the Cannon Mine suggests similar recoveries can be expected, when processed by a similar
method.
Page 10 of 213
No economic or other modifying factors have been applied to the MRE.
The Monument MRE has been reported at a 0.5 g/t Au cut-off. Given the deposit’s proximity to
infrastructure and existing successful mining operations, the current price of gold and comparison to
similar operation in the Coolgardie/Kalgoorlie goldfields, 0.5 g/t Au is considered a reasonable
reporting cut-off grade by the Competent Person.
Pinner - Classification
Resource classification reflects the confidence in the geological interpretation and grade estimation.
The near surface well drilled lodes 2 and 8 have been classified as Indicated. The other domains
have been classified as Inferred with the distal north-eastern edge of domain 9 left unclassified.
Monument – Classification
Classification has taken into account the geological confidence, distribution of data and confidence
in the reliability of the estimated resource given the nature of the deposit.
The Resource is classified as inferred due to a lack of Density data. Density values have been
adopted from the nearby Cannon deposit.
If the density data was available estimation passes 1 and 2 would be classified Indicated. Pass 3
would be Inferred. Pass 4 would be an exploration target (confirmation drilling required).
This classification is in line with the CP’s view of the deposit. It is estimated that measured density
values for the Monument deposit could change the resource tonnes by ±5%.
Boorara
Geology and Mineralisation Interpretation
Boorara is hosted within the Boorara Shear Zone (BSZ), a major tectonic feature of the Kalgoorlie
Terrrane. At Boorara the BSZ contains a number of ultramafic, mafic-volcanic and sedimentary units.
The host Boorara Dolerite package has a 4km strike length, and consists of layers of pyroxenite,
dolerite and granophyric coarse-grained quartz dolerites. The package is at its widest in the northern
area (500m) due to intercalated dolerite, high magnesian basalt (komatiite) and sediment units. The
central and southern parts of the project generally lack the internal komatiites and sediments and
averages less than 60m width.
The local geology has been extensively mapped and relogged by Dr Gerard Tripp and forms the
basis for the compilation of a 3D geological model for the Boorara deposit and the construct of
mineralisation domains. Additionally, the vein analysis provides significant support for the grade
continuity analysis.
Due to the change in deposit characteristics along its strike length, the Boorara deposit is divided
into three areas; Regal, Crown Jewel and Royal.
Page 11 of 213
The Regal mineralisation is dominantly hosted in stockworks within quartz dolerites or on the margins
of sedimentary units. These consist of moderately NE dipping veins within steeply dipping zones.
The Crown Jewel area has mineralisation within a moderately north-east dipping zone within the
quartz dolerite. This is a continuation of the Royal (southern stockwork) style of mineralisation, but
with a narrower zone of quartz dolerite and shallower dip.
The Royal area presents as well-developed steeply north-east dipping zones containing high
frequency vein arrays developed proximal to shears at the upper and lower contacts of the dolerite
unit.
Drilling Techniques
The deposit was sampled using Reverse Circulation (RC), Diamond drillholes (DDH) and Grade
Control RC (GCRC) on spacings ranging from 4 m x 10 m and 4 m x 4 m (vertical) at Royal, nominally
4 m x 10 m (vertical) at Crown Jewel and 5 m x 10 m (angled) at Regal. The exploration/resource
development drilling patterns were typically spaced at 10 – 20 m x 20 m but can extend out to >100
m spacing where deeper. An approximate total of 337 RC holes, 50 DDH holes and 812 GCRC holes
were drilled for 133,695 m, 8,537 m and 22,978 m respectively. Other types of sampling such as
trenches, Aircore and RAB drilling were not used in the Mineral Resource Estimate.
Sampling Techniques
Reverse Circulation drilling was used to obtain 1m samples from which approximately 1.5 – 2 kg was
pulverised to produce a 50 g charge for fire assay. RC chips were geologically logged. Diamond
Core was logged and sampled by cutting PQ, HQ, NQ2 core along the orientation line and submitting
the half core for assay. Sample intervals were determined by the supervising geologist.
Sampling Analyses Method
Samples were assayed for Au ppm only for this program. Assays were determined by 50 g fire assay
with AAS finish samples grading >5 g/t were repeat assayed and if a sample exceeded 100 g/t or
coarse gold is suspected then a screen fire assay (Au-SCR22AA) has been undertaken on those
samples and those results reported instead of the fire assay result. Detection limits are typically
accurate to 0.01 g/t Au.
Estimation Methodology
Mineralisation was domained as two mineralisation sets (termed the “Contact” Lodes and “Flat”
Lodes) which were then estimated as separate block models that were then joined together for the
final model. The Contact Lode mineralisation model relates to the vein stockworks contained within
steeply dipping granophyric dolerites. The Flat lode mineralisation relates to sheeted extensional
quartz vein arrays that are developed between the contact lodes at Regal, and mainly on the footwall
side of the Crown Jewel and Royal deposits. These models were estimated separately, and the
Contact lodes were overprinted onto the Flat Lode mineralisation model.
In terms of the interpretation process where Flat lode Mineralisation domains cross-cut the Contact
domains the samples were used to form the wireframes and the composites are used to inform both
models. The tenor of the mineralisation is very similar for both domains so is not considered to be
an issue likely to cause over-estimation issues in the model.
Grades were composited to 1 m downhole constrained within the mineralised domains. To avoid
loss of data from small ‘residuals’ at the end of a composite (i.e., small intervals that might otherwise
Page 12 of 213
be excluded), a “best fit” compositing routine that divided each mineralised intercept into equal
lengths that was as close as possible to 1m was chosen.
High grade results within the deposit were capped by analysing histograms, log histograms, log
probability plots and spatial analysis of individual high grades. Top-cuts for the Contact Lodes were
selected on a lode by lode basis and top-cuts for the Flat Lodes were selected on a domain grouping
basis. Top cuts varied between 8 g/t and 43 g/t gold. Low grade subdomains within the Contact
Lodes were all top-cut to 2 g/t gold. Top-cuts were applied to composites prior to estimation.
Flat lode model:Flat lode domains were grouped into seven orientation domains and variography was undertaken.
The Regal flat Lodes (88 domains) were individually estimated by ordinary kriging dynamic
anisotropy, using hard domain boundaries. The search ellipse for the Regal Lodes was aligned to
the local orientation of the mineralised trend of each domain using dynamic anisotropy. The Crown
Jewel and Royal Lodes were estimated as a group, using ordinary kriging with a search ellipse
flattened across strike to force a strong anisotropic search. Flat lodes were estimated into a parent
block of 10 m (Y) x 10 m (X) x 5 m (Z) with sub celling to 1m (X,Y,Z).
Contact lode model:Categorical indicator variography was completed for each of the Contact lodes using dynamic
anisotropy to control the search at a 0.25 g/t gold Indicator. This estimation was used to define the
low grade subdomains. Variography was undertaken on the flat lode high grade sub-domains which
were individually estimated by ordinary kriging using dynamic anisotropy with hard boundaries
applied apart from Domain 101, 301 and 401. Contact lodes were estimated into a parent block of
10m (Y) x 20m (X) x 5m (Z) with sub celling to 1m (X) by 2m (Y) by 1m (Z).
For both models three search passes were run. The size of the initial anisotropic search ellipsoid
was based on the variogram ranges. The searches were oriented in the same directions as the
variograms i.e., parallel to the individual vein geometries.
Cut-off Grade
The cut-off grades for Mineral Resource Estimation reporting are 0.5 g/t gold for open pit resources
and the Mineral Resource has been reported above the 200 mRL (approximately 200 m below
ground level) as the boundary for open pit RPEEE (“Reasonable Potential for Eventual Economic
Extraction”)
Previously reported MREs have used the same cut-off grade based on reasonable prospects of
eventual economic extraction using optimisation shells run by Mining Consultants using assumed
cost scenarios.
Boorara MRE update
The Boorara MRE was reported 27 April 2021in ASX announcement “Boorara Resource Update
Increases Gold Grade by 34%”. In July 2021 a minor error was noted in the density assignment in
the resource model resulting in a 4.4% drop in the reported gold metal content to the current 428,000
oz Au. The change was not considered material and presented no risk to the reasonable prospect
Page 13 of 213
for eventual economic extraction. The change has been incorporated into, and reported with, the
new Ore Reserve.
Mineral Resource Classification
Blocks have been classified as Measured, Indicated, Inferred or Unclassified based on drill hole
spacing, geological continuity and estimation quality parameters.
Mining and Metallurgical Parameters
Gold grades and geometry of the mineralised veins are amenable to open pit mining. No dilution for
mining has been incorporated into the model. The model and reported Mineral Resources are for
the mineralised lodes only, and further mining studies are required to determine the appropriate
amount of dilution. Trial mining in 2016 and 2020 and reconciliation of ore shall also assist in
determining the appropriate mining parameters.
Metallurgical test work on Boorara was completed by ALS Laboratories in 2014, 2015, a further two
test work programs occurred in 2016 and another in 2018 and 2019, Bureau Veritas in 2011 and
2021 and two programs in 2017 in addition to ore characterisation testwork undertaken in 2017 by
HydroGeoSense. Test work was undertaken on the various lodes and weathering profiles through
master and bulk composites. In addition, trial mining in 2016 of the Royal lodes processed at FMR
Investments’ Greenfields Mill, and trial mining in 2020 of the Regal and Crown Jewel lodes treated
at Golden Mile Milling’s Lakewood plant, enabled confirmation of metallurgical recoveries, reagent
consumptions and optimal processing parameters for plant design.
Comminution test work included SAG Mill Comminution Data, Unconfined compressive strength
(UCS), Crushing Work Index, Bond Ball Work Index, Bond Abrasion Index which indicate the
transitional/fresh ore on average is of medium hardness and moderately abrasive.
Metallurgical recovery test work included gravity and CIL leach test work and direct leach test work
at various grind sizes which showed moderate to high gravity recovery and high leach recovery, with
milling confirming these results averaging typically above 40% gravity recovery and achieving overall
recovery of 94.5% across all lodes at Boorara.
BURBANKS
Geology and Geological Interpretation
The Coolgardie Goldfield is a constituent of the Yilgarn Craton's Eastern Goldfields, lying on the
western margin of the Kalgoorlie Terrane within the ca. 2.7 Ga Norseman-Wiluna Greenstone Belt.
A series of deformed amphibolite facies mafic-ultramafic volcanic and intrusive rocks overlain by
felsic volcanic and sedimentary rocks comprise the greenstone belt of the goldfield.
The gold deposits of the Coolgardie Goldfield have been categorised historically by the alteration
assemblage and zonation around the lodes, or the structural and lithological setting of the deposit.
The four categories based on structural and lithological relationships advanced by Knight (1993) are
(1) deposits along sheared porphyry-ultramafic contacts, (2) gabbro-hosted quartz vein sets, (3)
fault-bound quartz vein sets, and (4) laminated quartz reefs. Of these styles, laminated quartz reefs
have produced approximately half of all gold from the goldfield, including the two largest producers,
Burbanks and Bayleys.
Page 14 of 213
The Burbanks gold deposit is hosted by the high-Mg basalt and dolerite of the Burbanks Formation.
Alteration and several phases of metamorphism within the sequence has produced varying
mineralogy, texture, and grain size within the mafic precursor, which historically has led to the
description of gabbro and garnetiferous diorite as part of the host sequence. Recent work by Stewart
(2015) has divided the sequence into five tectonostratigraphic units:
Fine-grained amphibolite with a basaltic-doleritic appearance
Coarse-grained amphibolite with a gabbroic appearance
Gneissic amphibol
Share your feedback
Discover