Group Mineral Resources Statement - Amended
Released
Released
Announcement PDF
19 May 2025
GROUP MINERAL RESOURCES STATEMENT - AMENDED
Horizon Minerals Limited (ASX: HRZ) (the Company) wishes to update the market on the
announcement dated 29 April 2025 titled ‘Group Mineral Resources Statement’ has been revised
and updated to include various compliance matters related to the listing rules and JORC Code 2012.
The announcement dated 29 April 2025 titled ‘Group Mineral Resources Statement’ has been
replaced with the announcement of today and is attached to this cover note dated 19 May 2025 titled
‘Group Mineral Resources Statement – Amended’.
Approved for Release by the Horizon Board
Julian Tambyrajah
Chief Financial Officer &
Company Secretary
ASX: HRZ
ASX ANNOUNCEMENT
19 May 2025
GROUP MINERAL RESOURCES STATEMENT - AMENDED
Following the successful completion of the merger between Horizon Minerals Limited (ASX:HRZ, the
Company) and Poseidon Nickel Limited (formerly ASX:POS), the Company is pleased to provide a
consolidated statement of group Mineral Resources as of 31 March 2025.
HIGHLIGHTS
•
Mineral Resources currently stand at:
o
1.8Moz gold 1
o
20.2Moz silver, 104kt zinc 2
o
422kt nickel and 7,800t cobalt 3
•
Gold Mineral Resources are underpinned by the large cornerstone Boorara and Burbanks assets
•
Changes to the Companies Mineral Resources include:
o
•
Addition of 422kt Nickel from the acquired Poseidon assets. 4
Large Gold Mineral Resource base and ongoing studies pave the way for a development profile
aiming at sustained gold production and continuous cashflows
HORIZON MINERALS GOLD MINERAL RESOURCE ESTIMATE 1
Measured
Total
•
Indicated
Inferred
Total
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
1.31
1.34
56,300
16.48
1.82
963,081
12.74
1.90
778,373
30.37
1.84
1,797,764
The acquired Nickel Mineral Resources are mine ready for the next upswing in the Nickel price. The
acquired assets include infrastructure important to the development plans of Horizon as a gold
producer.
HORIZON MINERALS NCKEL MINERAL RESOURCE ESTIMATE3
MEASURED
Total
INDICATED
INFERRED
TOTAL
Kt
Ni%
Ni (t)
kt
Ni%
Ni (t)
kt
Ni%
Ni (t)
kt
Ni%
Ni (t)
1,475
0.84
13,200
23,600
0.98
233,500
17,000
1.03
176,000
42,100
1.00
422,700
Commenting on the Group MRE upgrade, Chief Executive Officer Mr Grant Haywood said:
“It is very pleasing to have completed the merger with Poseidon Nickel bringing in the surface infrastructure
including the Black Swan plant to refurbish and convert to a gold plant, but also the substantial Nickel resource
base. We also look forward to increasing our gold resources through further M&A opportunities and organically
through drilling which will commence this current June 2025 quarter”.
1
See Mineral Resource Table and Confirmations on Page 44. 2 see Mineral Resource Table and Confirmations on Pages 46. 3 see
Mineral Resource Table Pages 47 and JORC Table 1 summaries pp 50. 4 see ASX Disclosures pp 4 and Mineral Resource Table Page
47.
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
F: +61 8 8389 1597
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an updated Mineral
Resource Statement for the Company’s projects located near Kalgoorlie-Boulder in the heart of the Western
Australian goldfields (Figure 1). In addition, following the merger with Poseidon Nickel Limited, the Company
adds the Black Swan, Lake Johnston and Windarra nickel resources and associated infrastructure to the
Resource portfolio (Figure 2).
Figure 1 - Kalgoorlie Project Area Locations and Surrounding Infrastructure
Page 2 of 53
ASX ANNOUNCEMENT
Figure 2 - Regional Nickel Assets
Page 3 of 53
ASX ANNOUNCEMENT
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 4 of 53
ASX ANNOUNCEMENT
Listing Rule 5.8 Disclosures
Black Swan Project
BLACK SWAN AND BLACK SWAN STOCKPILES
SITE HISTORY
The Black Swan nickel project originally operated as a joint venture between MPI Mines and Outokumpu.
Exploration first began at Black Swan during the nickel boom of the late 1960s when Australian Anglo
American Ltd (AAA) discovered disseminated sulphide nickel mineralisation associated with what would
become the Cygnet and Black Swan deposits. During the early 1990s exploration by the MPI Mines
Outokumpu JV focussed on the massive/semi-massive sulphide deposits of the adjacent Silver Swan,
Gosling, Cygnet and White Swan orebodies.
Underground mining and plant construction began in 1996, with first ore extracted from underground in May
1997. Open pit mining of the Black Swan disseminated sulphide deposit commenced in 2004 and continued
until February 2009 when the mine was placed on care and maintenance. Poseidon Nickel acquired the
project from Norilsk Nickel in July 2014.
The latest MRE update was prepared for Poseidon by independent resource consultants WSP Australia Pty
Limited (WSP), using all available assay data as of May 2023.
The 2023 updated MRE incorporates 10,845 metres of new drilling from 112 Reverse Circulation (RC) drill
holes completed by Poseidon between December 2022 and February 2023 (refer to Table 1, Appendix 2)
from within the confines of the recently dewatered Black Swan open pit. The recent 112-hole drill program
was specifically undertaken to increase the confidence in the Black Swan MRE through infilling the area
extending approximately 125 metres immediately below the existing Black Swan open pit with the objectives
to better delineate the metallurgically important serpentinite and talc-carbonate hosted resources in this area
and to lift most of these resources into Measured and Indicated categories. Increased metallurgical
categorisation confidence in the 2023 MRE was achieved by the addition of non-sulphide Ni assays and
improved domain boundary confidence with the addition of semi-quantitative hyper spectrally estimated talc
grades for all recent RC drill samples.
Below this area, the MRE is based largely on the same historical drill hole data that was used in the previous
2014 and 2022 MREs.
GEOLOGY AND GEOLOGICAL INTERPRETATION
The Black Swan Komatiite Complex (BSKC) is a 3.5km long by 0.6km thick arcuate lens of olivine cumulate
and spinifex textured flows. The complex is enclosed by a broad sequence of proximal facies intermediate
felsic lavas and associated volcanoclastic rocks situated on the NE dipping, NE facing limb of the KanownaScotia anticline. The anticline is located in the upper greenschist – lower amphibolite facies of the Boorara
Domain, one of six tectono-stratigraphic domains making up the Kalgoorlie Terrane.
The complex evolved as a series of episodically emplaced komatiite flows. The flows were channelised
within a dynamic, coevally erupting calc-alkaline submarine environment, which resulted in the formation of
several large felsic bodies (extrusive and intrusive) at various levels within the complex. Early during its
evolution, massive and disseminated nickel sulphides accumulated in favourable locations on and adjacent
Page 5 of 53
ASX ANNOUNCEMENT
to the basal contact of the complex. Post emplacement serpentinization and talc-carbonate alteration,
metamorphism and deformation, was moderate to extreme and was responsible for the destruction of
primary igneous textures throughout much of the complex including low (massive sulphides) to moderate
(disseminated sulphides) modification of the nickel sulphides.
The host lithologies to the Black Swan disseminated sulphide deposit comprise a core area of serpentinite
(dominantly as antigorite) enclosed by broad areas of talc magnesite and dolomite altered komatiites. The
disseminated sulphides form between 2-10% of the host rock. They generally consist of composite grains of
pyrite-millerite-magnetite±violarite in serpentinite areas with vaesite-polydymite becoming significant in the
surrounding talc-carbonate altered rocks.
Two textural sulphide types are recognised:
•
•
fine grained interstitial composite grains between olivine pseudomorphs; and
coarse grained blebby or droplet composites similar in size to the olivine pseudomorphs.
The fine-grained composites are more widely distributed, defining a broad, low grade mineralised horizon
consisting of several discrete lenses (Figure 1). The coarser grained composites are much less widely
distributed, forming small discrete, higher-grade zones within the sulphide rich lenses. They are also unique
to the Black Swan deposit and are generally restricted to the disseminated sulphide lenses developed
between 11 200 N -11 450 N (Black Swan local grid).
The majority of the Black Swan disseminated sulphide mineralisation is contained within a central “main” lens
which is up to 50 metres thick and contains most of the coarser grained blebby sulphides. Consequently, the
main lens is typically higher grade with a S/Ni ratio >1. Up to three much thinner discrete “hanging wall”
sulphide lenses are recognised to the east on the main lens. The hanging wall lenses are typically millerite
dominant with a characteristic S/Ni ratio of <1 when hosted by serpentinite. To the west of the main lens is
the footwall sulphide lens. Consisting dominantly of the finer grained interstitial sulphide composites, the
footwall lens is mostly hosted within talc-carbonate altered komatiites and is typically lower grade than the
main and hanging wall lenses.
DRILLING TECHNIQUES
Exploration and Resource Definition RC and diamond drilling (DDH) have primarily been used to evaluate
the Black Swan disseminated sulphide deposit. Drilling has been carried out on the Project since 1968,
incorporating several lease owners as detailed in Table 1. Not included in Table 1 are the numerous
underground and Black Swan open pit RC grade control holes recorded in the Project drill hole database.
The majority of DDH drilling is NQ and NQ2, the rest being HQ size. All drill holes were routinely surveyed
using a variety of techniques with core orientations carried out using either spearmarks or the Ezimark
orientation systems.
Surface drilling was typically conducted on a spacing of 20 to 50 metres across strike and approximately 50
metres along strike, with drill hole orientation dominantly perpendicular to the strike of the mineralisation.
Underground Poseidon RC and DDH infill drilling undertaken in 2019 and 2021/22 was on 20 metre along
strike sections. Recent in-pit RC drilling by Poseidon infilled between historical drill holes on 10 metre along
strike sections. Historical in-pit grade control drilling was on a 10 metre by 10 metre staggered pattern.
For the most recent Poseidon 112-hole RC drill program, drilling was conducted by Strike Drilling Pty Ltd
using a Schramm T450 and track mounted X350 drill rigs. The holes were drilled 133 mm size and surveyed
Page 6 of 53
ASX ANNOUNCEMENT
using a true north seeking Axis Champ Gyro tool. A north seeking gyro rig aligner was used to align and
collar each hole. A full list of the 112-hole Poseidon RC drill program is provided in Appendix 2.
COLLAR AND DOWNHOLE SURVEY
The Black Swan drill hole database contains drill hole collar coordinates in MGA51, AMG51 and Black Swan
local grid coordinates typically surveyed to an accuracy of ±10 mm. All Black Swan drill holes have been
routinely surveyed (down hole) generally every 30 metres or less. In the case of some early drill holes
(Australian Anglo American Ltd) however, only the hole dip component was measured using the acid vial
method. All subsequent drill holes have been surveyed using a variety of instruments including Eastman
single shot, multi-shot and modern downhole gyro survey instruments.
Table 1 - Drilling Campaigns (RC And DDH Excluding Grade Control Holes)
Company
Year
Holes Drilled
Metres Drilled
Australian Anglo American Ltd
1968-74
8
1899
Consolidated Exploration Ltd
1990-91
30
3362
MPI/OEVJV
Outokumpu Exploration
Ventures
Outokumpu Exploration
Ventures
1995-98
9
3163
1999-01
25
4402
2001
7
2581
MPI Nickel Pty Ltd
2003
6
609
MPI Nickel Pty Ltd
2004
29
3071
Norilsk
2005/08
99
29684
Poseidon (RC underground)
2019
14
2481
Poseidon (DDH underground)
2021/22
24
5144
Poseidon (RC in-pit)
2022/23
112
10845
363
67241
Total
Page 7 of 53
ASX ANNOUNCEMENT
Figure 3 – Schematic Black Swan Geological Cross Section 11,280 N Showing Broad Geological Domains, Recent In-Pit
RC Drill Holes and Resource Block Grades Above 0.4% Nickel
Figure 4 - Schematic Black Swan Geological Cross Section 11,280 N Showing Mineral Resource Categories
Page 8 of 53
ASX ANNOUNCEMENT
SAMPLING AND SUB-SAMPLING TECHNIQUES
The Black Swan mineralisation is identified visually by recording the host rock, texture and proportion of
nickeliferous sulphide composites present which, underpins the development of the geological and
mineralisation domains used in the modelling and estimation process. DDH core is the most dominant
sample type. DDH samples are divided into the logged domains, with no individual sample generally being
greater than 1.2 metres or less than 0.2 metres. Core samples are sawn and mostly sampled as half core,
unless duplicates were taken, which required samples to be quarter core. RC samples were typically
collected using rig mounted cone splitters over intervals between 1.5 metres (Poseidon 2019) and 2.0
metres for in-pit grade control drilling and the most recent RC in-pit program completed by Poseidon.
SAMPLE ANALYSIS METHOD
Sample preparation and analysis of the Black Swan drill hole samples has been conducted by several
independent certified laboratories over the life of the Project using a range of techniques, predominantly xray fluorescence (XRF) or ICP-MS and ICP-OES. Analyses varied from a few critical elements to broad
multi-element suites.
For the most recent 112-hole Poseidon RC drill program, a total of 5,426 samples were dispatched to SGS in
Perth. Post sample receipt and drying, sample preparation consisted of crushing and pulverisation, followed
by four-acid digest. The SGS ICP-OES technique code was ICP41Q. Each sample was analysed for a total
of eleven elements, including nickel, copper, cobalt, arsenic and sulphur. Non sulphide nickel (NsNi)
determinations, technique code CSE01V, were also performed on most RC samples. In addition, all RC
samples from the 112-hole program were hyper spectrally scanned by Corescan in Perth to estimate the
respective talc content of each 2 metre RC sample.
DENSITY DATA
The Black Swan drill hole database contains in excess of 49,000 Specific Gravity (SG) determinations, of
which 13,128 were used in the 2023 MRE, with 3,881 SG determinations added from the Poseidon 2021/22
24-hole DDH program. Virtually all density measurements were performed using the immersion technique
(Archimedes water displacement method). The density was calculated as a wet density even though core
was often left to dry for some time. In some sampling programmes a representative section of core was used
for measurements, instead of entire core sample.
QUALITY ASSURANCE AND QUALITY CONTROL
Throughout the life of the Black Swan project, beginning with the MPI Mines/Outokumpu JV in 1995, industry
standard quality control measures have been used to monitor the quality and performance of the various
laboratories providing analytical services to the Project. Despite minor issues from time to time the quality
control checks, including field duplicates, standard and reference assays, laboratory repeat assays and blind
pulp repeats show reasonable accuracy and precision.
Certified Reference Material (CRM) insertion rates varied slightly over the life of the Project but typically
followed accepted industry practice at the time. For the recent 112-hole Poseidon RC program QAQC
samples comprising CRMs standards, blanks and cone split duplicate samples were submitted at a rate of 1
in 20 throughout the course of the program. In total 59 standards, 52 blanks and 319 field duplicate samples
were analysed as part of the 112-hole program. Analysis of the results demonstrate a high degree of
reliability can be assigned to the SGS analytical results.
Page 9 of 53
ASX ANNOUNCEMENT
ESTIMATION METHODOLOGY
Poseidon updated the Black Swan interpreted lithology and mineralisation domains using the recent 112hole RC drill data. This interpretation was provided to WSP as scanned 10 metre spaced cross sections,
along with an updated drill hole database for the project. WSP reviewed the provided interpretation and
completed explicit modelling of the lithology using the sectional interpretation, within Vulcan. The
mineralisation domains were interpreted and implicitly modelled using Leapfrog Geo. Vulcan was then used
to build a block model above 10900 RL to support grade estimation and Mineral Resource Classification.
Overall block model dimensions were 9900-10700E, 10800-11700N and 10900 to 11370RL.
Drill hole samples were composited to two metre downhole intervals and coded with the interpreted
mineralisation zone and lithology codes for use in grade estimation. Grade estimation was carried out using
the linear estimation method of Ordinary Kriging for nickel, sulphur, arsenic, iron, magnesium oxide, nonsulphide nickel (NsNi), cobalt, copper, talc content and density. Estimation was controlled by mineralisation
domains and in some cases by lithology, based on statistical analysis of the drill hole composite statistics.
Search restrictions were applied for high-grade outliers to limit the spatial influence of these values during
estimation.
Mineral Resource classification was applied to the block model, based primarily on the drill hole spacing
which has a strong influence on the local confidence in the geological interpretation and grade estimation.
Mineralisation contained within the interpreted mineralisation domains was interpreted to have sufficient
geological confidence to meet Measured or Indicated classification.
The additional 112-hole RC drill data has improved the confidence of the 2023 MRE, with the significant
increase in the tonnage and grade of the Indicated Mineral Resource. These increases resulted from
conversion of Inferred Mineral Resource in the critical area immediately below the existing Black Swan pit.
Overall, the changes in 2023 with additional drilling and improved more tightly constrained geological
interpretation has slightly reduced the MRE tonnage but has increased the grade and contained metal. The
MRE for the Black Swan Open Pit is reported in accordance with the JORC Code (2012 Edition).
RESOURCE CLASSIFICATION
Classification of the Mineral Resources was based on the geological complexity, data quality, drill hole
spacing, number of samples and primarily the Ni estimation quality.
Poseidon has concluded that the geological understanding, interpretation, data quality and sample QAQC
are of sufficient quality to support the MRE. WSP has applied the classification to the block model based on
wireframes interpreted from observed drill hole spacing and estimation quality.
CLASSIFICATION STRATEGY
The classification applied to the block model is based primarily on the drill hole spacing which has a strong
influence on the local confidence in the geological interpretation and grade estimation. Only mineralisation
contained within the interpreted mineralisation domains was interpreted to have sufficient geological
confidence to meet Measured or Indicated classification.
The broad distribution of the classification categories is shown in Figure 4.
Wireframes were interpreted for the various classes for assigning classification to blocks based on the
following criteria:
Page 10 of 53
ASX ANNOUNCEMENT
MEASURED
Areas of the modelled mineralisation which is covered by grade control drilling with typical drill hole spacing
of 10 metres by 10 metres. Estimations have used multiple samples from a number of holes and high sample
counts. Average distance to samples is typically less than 20 metres.
INDICATED
Areas of the modelled mineralisation which is covered by drilling with typical drill hole spacing of 20 metres
by 20 metres. Estimation have used multiple holes and a reasonable number of samples. Average distance
to sample is typically less than 30 metres.
INFERRED
Areas of the modelled mineralisation with lower estimation confidence, or mineralisation (above 0.4% Ni)
outside of the interpreted domains with adequate spatial continuity. Limited number of holes and samples to
support the estimation, or default grades used. Expected average distance to samples and extrapolation is
below 50 metres.
MINERAL RESOURCE
Based on previous mining and milling experience the resource is reported at a cut off of 0.4% Ni
Table 2 - Black Swan 0.4% Ni Cut Off
2023
Tonnage (mt)
Ni (%)
Ni (kt)
Measured
0.8
0.78
7
Indicated
15.1
0.73
111
Inferred
10.4
0.69
71
TOTAL
26.3
0.72
189
MINING AND METALLURGY
The Black Swan deposit has been mined and milled previously so material properties processing parameters
are well understood (Table 3). The resource is reported above 10,900 m RL, a depth extrapolated from an
optimal pit shell for the previous resource model. Current economics are not favourable for mining but there
is the expectation of metal price recovery and mining in the future.
Page 11 of 53
ASX ANNOUNCEMENT
Table 3 - Mining and Processing Parameters
Description
Value
Mining Dilution (%)
10%
Mining Recovery (%)
95%
Closure cost ($/t waste)
0.2
Nickel price (US$/lb)
8.50
Processing rate (Mtpa)
2.2
Processing cost ($/t ore)
18.64
Annual discount (%)
8
Process recovery serpentinite (%)
70
Process recovery talc (%)
56
Slope angles (deg)
45
Mining cost ore ($/bcm)
6 to 15.72
Mining cost waste ($/bcm)
5.4 to 14.3
Drill and Blast transition waste ($/bcm)
0.96
Drill and Blast transition ore ($/bcm)
1.08
Drill and Blast fresh waste ($/bcm)
2.64
Drill and Blast fresh ore ($/bcm)
2.76
Revenue Factor
1.0
Exchange rate (US$/AUD$)
0.70
COMPETENT PERSON STATEMENTS
The information in this report that relates to Exploration Targeting and Results is based on, and fairly
represents, information compiled and reviewed by Ms Karyn Parker, who is an employee of Poseidon Nickel,
and is a Member of The Australian Institute of Geoscientists.
The information in this report which relates to the Black Swan Mineral Resource is based on, and fairly
represents, information compiled by Mr Richard Gaze and Mr Drew Luck. Mr Gaze is Technical Director and
full-time employee of WSP Australia Pty Limited based in Perth WA and is a Member of the Australasian
Institute of Mining and Metallurgy. Mr Luck is a Senior Geologist and full-time employee of WSP Australia Pty
Limited based in Brisbane QLD and is a Member of the Australasian Institute of Mining and Metallurgy.
Ms Parker, and Messrs Gaze and Luck have sufficient experience which is relevant to the style of
mineralisation and type of deposits under consideration and to the activity which they are undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code 2012). Ms Parker and Messrs
Gaze and Luck consent to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Page 12 of 53
ASX ANNOUNCEMENT
STOCKPILES
The Black Swan Operation includes seven Indicated and Inferred ore stockpiles, as listed in Table 4, for a
total of 1.6 Kt at 0.5% Ni. The stockpile locations are illustrated in Appendix B.
Table 4 - Black Swan Stockpiles
Stockpile
Resource
Category
Tonnes Kt
Ni%
Recovery
Rec Ni%
Blue
Inferred
367
0.53
0.59
0.31
Indicated
Indicated
Indicated
Indicated
Indicated
Indicated
367
38
16
39
579
76
447
1195
0.53
0.6
0.8
0.7
0.45
0.62
0.49
0.49
0.59
0.64
0.73
0.69
0.52
0.49
0.39
0.48
0.31
0.38
0.59
0.49
0.23
0.3
0.19
0.24
1562
0.5
0.51
0.26
sub-total Inferred
Crushed
Yellow
Lime
Blue
Talc (HG)
Talc (LG)
sub-total Indicated
Total Stockpile Inventory
(Indicated and Inferred)
COMPETENT PERSON’S STATEMENT
The information in this report which relates to the Mineral Resource is based on information compiled by
Andrew Weeks who was a full-time employee of Golder Associates Pty Ltd, at the time of reporting and a
Member of the Australasian Institute of Mining and Metallurgy. Andrew Weeks has sufficient relevant
experience to the style of mineralisation and type of deposit under consideration and to the activity for which
he is undertaking to qualify as a Competent Person as defined in the JORC Code (2012). Mr Weeks
consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Page 13 of 53
ASX ANNOUNCEMENT
Silver Swan
GEOLOGY AND GEOLOGICAL INTERPRETATION
The Silver Swan Massive (SSM) deposit comprises four narrow, high grade nickel sulphide mineralised shoots,
located along the basal ultramafic contact of the Black Swan Komatiite (BSK). The BSK is a large extrusive
ultramafic flow that can be traced over a 3,500m strike length and extends at least 1,600m below surface. The
width of the BSK varies from 150 to 600m in the central area of the flow, which narrows significantly along
strike north and south of the central portions of the flow.
The four shoots that were assessed for this MRE are Goose, Peking Duck, Fledgling-Canard and Tundra-Mute
(Figure 1). There is remnant mineralisation located within the Goose shoot, and the top 15m of the FledglingCanard shoot has also been mined. The Peking Duck and Tundra-Mute shoots are unmined, other than some
limited development in the upper portions of Tundra-Mute.
Within the Black Swan stratigraphy there are several late felsic to intermediate intrusive unites, typically
described as porphyritic dykes which have stoped out the mineralisation. These have been depleted from the
mineralisation by resetting the density to 0.00. As with the previous estimates, these have been modelled to
ensure that any mineralisation is suitably accounted for.
The BSK hosts both disseminated nickel sulphide (Black Swan Disseminated - BSD), and massive sulphide
nickel mineralisation (Silver Swan - SSM, White Swan - WSM, Cygnet - CM, Gosling - GM and Golden Swan
- GSM). The SSM mineralisation is the most significant massive sulphide accumulation within the BSK,
extending from 195m to 1,550m below surface and consisting of a series of narrow, variably sized vertical
shoots.
As a function of the depth of the SSM and the location of the available drilling locations, the majority of the
2019 and earlier drilling was drilled at very acute intersection angles to the mineralisation. The 2020 and 2021
drilling aimed at improving the drillhole intersections and providing infill data for the 2019 MRE.
The 2020 and 2021 drilling programmes predominantly tested the Tundra-Mute shoot, with only a very limited
number of drillholes testing the Fledgling-Canard and Peking-Duck shoots, and no additional drilling into the
Goose shoot.
Following completion of the exploration drilling in the last quarter of 2021, the interpretations were updated.
The 2022 updated interpretations were prepared by Snowden Optiro, primarily using the logged lithology codes
identifying the predominantly massive sulphide lithologies, combined with rock geochemistry.
Page 14 of 53
ASX ANNOUNCEMENT
Figure 5: Long section looking West showing simplified layout of the Silver Swan Deposits.
Page 15 of 53
ASX ANNOUNCEMENT
DRILLING TECHNIQUES
The pre-2020 drillhole downhole surveys were completed using a range of surveying methods ranging from
acid etch for the very early (1960 and 1970s) drilling, through to north seeking gyro/REFLEX tools. As a
consequence of the previous mining at Silver Swan, there is confidence in the downhole survey data. This
confidence is further supported by the observation by the Poseidon team that the 2020 and 2021 drilling
program intersected the mineralisation extremely close to the target depths predicted from the 2019 estimate.
The Silver Swan MRE update is based on the 38 holes of the exploration and resource drilling program
undertaken by Poseidon in 2021. Drilling was conducted by Webdrill using a Diamec Smart 6 Mobile Carrier
rig. The holes were drilled in NQ2 and the core was orientated using the Trucore Orientation Tool and surveyed
using the DHS DeviGyro OX tool.
Figure 6 - Long section showing historic and recent drilling around Silver Swan Deposits. The 2021 programme is shown
as thicker drill traces.
Page 16 of 53
ASX ANNOUNCEMENT
Figure 7 - Cross section looking North showing 2019 and 2021 program collar locations and improved drilling angles for
2021 Tundra-Mute program
Page 17 of 53
ASX ANNOUNCEMENT
SAMPLING AND SUB-SAMPLING TECHNIQUES
The Silver Swan mineralisation was identified visually using the presence, texture and proportion of
nickeliferous sulphide material, and lithology. Samples were divided into logged domains, with no individual
sample being greater than 1.2m or less than 0.2m. Core samples are sawn and were sampled as half core,
unless duplicates were taken, which required samples to be quarter core. All sampling was as diamond core.
Certified Reference Material (CRM) standards and blank samples were submitted at nominal rate of 1 in 20
(achieved rate was 1 in 14 for the CRMs).
SAMPLE ANALYSIS METHOD
The pre-2020 assay data was generated by a range of techniques, predominantly x-ray fluorescence (XRF) or
ICP-MS and ICP-OES. No details of the historical sample preparation are available; however, as noted, the
previous mining s
Share your feedback
Discover