Mining Commences at Phillips Find
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
7 AUGUST 2024
MINING TO COMMENCE AT PHILLIPS FIND
HIGHLIGHTS
•
Joint Venture (JV) Agreement executed with BML Ventures Pty Limited (BML) to develop
and mine two open pits at Phillips Find
•
Existing 200kt Toll Miiling Agreement executed with FMR Investments Pty Ltd (FMR) to be
utilised for Phillips Find JV ore
•
All management, technical, operational and maintenance roles to be undertaken by BML with
oversight by the Company
•
Low financial risk JV structure with BML to fund all project costs, with net cashflow after the
asset recovery and repayment of costs to be split 50/50 between Horizon and BML
•
Mining Proposal (MP) submitted to DMIRS and is currently under assessment
•
Mobilisation and site establishment is imminent, with mining commencing in the September
2024 quarter subject to MP permit being approved
•
First gold production planned for the December 2024 quarter, subject to permitting
•
Processing at FMR’s Greenfields mill to be undertaken for a period of eight months under the
Toll Milling Agreement
•
Mining at Phillips Find is independent of mining at Boorara being treated at Norton Gold
Fields’ Paddington mill, with production and cashflows now coming in from two production
sources
•
Current Australian gold price provides favourable environment to deliver strong margins and
cashflow generation
Commenting on the JV agreement, Managing Director and CEO Mr Grant Haywood said:1
“We are pleased to have partnered up with BML Ventures, who have a proven track record of
delivering projects in the eastern goldfields of Western Australia. BML will be managing and sole
funding the Phillips Find JV which greatly derisks the project for the Company, particularly from a
financial perspective. This agreement does not require any capital from Horizon and allows us to
keep our focus on our Boorara startup. The Cannon Project will be paused until sufficient cash flows
are generated from our two production sites, Boorara and Phillips Find, to sole fund rather than joint
venture.
We look forward to generating cash over the next 19 months from two gold mining projects in this
very strong gold price environment.”
1
See Forward Looking and Cautionary Statements on Page 5.
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to announce that it
has executed through its wholly owned subsidiary, Greenstone Resources Limited, an open pit
mining Joint Venture (JV) Agreement with BML Ventures Pty Ltd (“BML” or the “Miner”) for the
Phillips Find Gold Project (“Phillips Find” or “Project”). The proposed mining project is 100% owned
and located 45 km north-west of Coolgaride, Western Australia in the heart of the Western Australian
goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Phillips Find Overview
The Project covers over 10 kilometres of strike over prospective greenstone stratigraphy and
includes the Phillips Find Mining Centre (PFMC) where approximately 33,000 ounces of gold has
been produced between 1998 and December 2015 from three open‐pit operations; Bacchus Gift,
Newhaven and Newminster.
The Mineral Resource Estimate (JORC 2012) for Phillips Find (Open Pit) is shown below:
Page 2 of 5
ASX ANNOUNCEMENT
Table 1: Phillips Find Open Pit Mineral Resource Estimate 1
Boorara at 0.5 g/t lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
Measured
Resource category
-
-
Gold Metal (Oz)
Indicated
0.54
2.40
41,650
Inferred
0.19
2.10
12,700
Total
0.73
2.30
54,360
-
Mining and Processing
Of the three existing open pits at Phillips Find, it is proposed to cutback the Newminster and
Newhaven open pits over the course of approximately 11 months.2 The fleet will be 120 tonne
excavators and 100 tonne rigid dump trucks. Site facilities will be established by BML during the
mobilisation phase.
Ore will be processed under Horizon’s existing toll milling agreement with FMR at the Greenfields
mill.
BML will sole fund the project, and once costs have been recovered, surplus cashflow will be
distributed to BML and the Company on a 50/50 basis.
Next Steps 2
Mobilisation to site shall commence, with site establishment and preproduction works also about to
get underway whilst awaiting for the Mining Proposal to be granted. Grade control drilling shall also
commence in preparation for mining.
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
As announced to the ASX on 1 August 2024 and see Minerals Resources Table and confirmations on Page 4. 2 See Forward Looking
and Cautionary Statements on Page 5.
1
Page 3 of 5
ASX ANNOUNCEMENT
Horizon Minerals Limited – Summary of Gold Mineral Resources
Cutoff
Project
Measured
Indicated
Inferred
Total
Au g/t
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Boorara OP
0.5
1.12
1.22
44,000
6.85
1.28
281,000
2.56
1.26
103,000
10.53
1.27
428,000
Burbanks OP
0.5
1.43
2.00
92,780
3.43
1.90
204,870
4.86
1.90
297,650
Burbanks UG
2.5/2.0*
0.12
4.30
16,730
1.07
4.40
151,190
1.19
4.40
167,920
Phillips Find OP
0.5
0.54
2.40
41,650
0.19
2.10
12,700
0.73
2.30
54,360
Phillips Find UG
2
0.03
2.30
210
0.03
2.30
210
Golden Ridge
1
0.47
1.83
27,920
0.10
1.70
2,800
0.52
1.82
30,720
Golden Ridge
North
0.8
0.65
1.15
24,260
0.77
1.30
32,340
1.42
1.23
56,600
Cannon UG
1
0.19
4.80
28,620
0.10
2.30
3,450
0.23
4.29
32,070
Monument
0.5
0.92
1.11
33,000
0.92
1.11
33,000
Pinner
0.5
0.06
1.02
2091
0.27
1.25
10,753
0.33
1.21
12,844
Pennys Find
1.5
0.30
5.19
51,000
0.12
3.00
12,000
0.43
4.57
63,000
Kalpini
0.8
1.40
2.43
108,000
0.50
2.00
31,000
1.87
2.33
139,000
Rose Hill UG
2
0.33
4.50
47,100
0.20
4.80
27,800
0.51
4.60
74,900
Rose Hill OP
0.5
0.09
2.00
6,100
0.29
2.00
18,400
Jacques-Peyes
0.8
0.97
2.59
81,000
0.80
2.00
49,000
1.74
2.32
130,000
Teal
1
1.01
1.96
63,680
0.80
2.50
64,460
1.81
2.20
128,140
Crake
0.8
1.33
1.47
63,150
0.10
1.30
3,300
1.42
1.46
66,450
Coote
1
0.40
1.50
21,000
0.42
1.54
21,000
Capricorn
0.5
0.70
1.20
25,500
0.70
1.20
25,500
Baden Powell
0.5
0.60
1.20
23,000
0.60
1.20
23,000
13.66
1.85
811,373
30.55
1.84
1,802,764
Total
0.19
1.31
2.00
1.34
12,300
56,300
15.74
1.85
935,081
Confirmation
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted
from and was originally reported in Horizon’s ASX announcements “Intermin’s Mineral Resources
Grow 30% to over 560,000 Ounces”, (ASX:IRC) (Teal) dated 19 September 2018, “Gold
resources increase to 1.24moz” (Coote, Capricorn, Baden Powell) dated 28 September 2022 ,
“Rose Hill firms as quality high grade open pit and underground gold project” dated 8 December
2020, “Pennys Find Resource Update” dated 29 December 2023, “Updated Crake Resource
improves in quality” dated 7 September 2021, “Jacques Find- Peyes Farm Mineral Resource
update” dated 15 September 2021, “Asset Swap with Northern Star Completion”, dated 20
December, 2019, “Investor Presentation June 2022”, 31 May 2022, "Maiden Resources for
Monument and Golden Ridge North “, 19 July 2023 and “Kalpini Gold Project Mineral Resource
Update” dated 28 September 2021, “Group Minerals Resources Statement” dated 25 July 2024,
and “Group Mineral Resources Statement - Amended”, 1 August 2024, each of which is available
at www.asx.com.au.
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements and that all material assumptions
and technical parameters underpinning the estimates in those announcements continue to apply
and have not materially changed. The Company confirms that the form and context of the
Competent Person’s findings in relation to those Mineral Resources estimates or Ore Reserves
estimates have not been materially modified from the original market announcements.
Page 4 of 5
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and
financial performance. Forward looking statements include, but are not limited to, statements
preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”,
“intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar
expressions. Forward looking statements, opinions and estimates included in this announcement
are based on assumptions and contingencies which are subject to change without notice, as are
statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be
relied on as a guarantee of future performance. Forward looking statements may be affected by a
range of variables that could cause actual results to differ from estimated results, and may cause
the Company’s actual performance and financial results in future periods to materially differ from
any projections of future performance or results expressed or implied by such forward looking
statements. These risks and uncertainties include but are not limited to liabilities inherent in mine
development and production, geological, mining and processing technical problems, the inability
to obtain any additional mine licenses, permits and other regulatory approvals required in
connection with mining and third party processing operations, competition for among other things,
capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments
of the value of acquisitions, changes in commodity prices and exchange rate, currency and interest
fluctuations, various events which could disrupt operations and/or the transportation of mineral
products, including labour stoppages and severe weather conditions, the demand for and
availability of transportation services, the ability to secure adequate financing and management’s
ability to anticipate and manage the foregoing factors and risks. There can be no assurance that
forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements
in the announcement, including with respect to any production targets and financial estimates,
based on the information contained in this and previous ASX announcements.
Page 5 of 5
Share your feedback
Discover