GROUP MINERAL RESOURCES STATEMENT
Following the successful completion of the merger between Horizon Minerals Limited (ASX:HRZ,
the Company) and Poseidon Nickel Limited (formerly ASX:POS), the Company is pleased to provide
a consolidated statement of group Mineral Resources as of 31 March 2025.
HIGHLIGHTS
•
Mineral Resources currently stand at:
o
1.8Moz gold 1
o
20.2Moz silver, 104kt zinc 2
o
422kt nickel and 7,800t cobalt 3
•
Gold Mineral Resources are underpinned by the large cornerstone Boorara and Burbanks
assets
•
Changes to the Companies Mineral Resources include:
Addition of 422kt Nickel from the acquired Poseidon assets. 4
o
•
Large Gold Mineral Resource base and ongoing studies pave the way for a development
profile aiming at sustained gold production and continuous cashflows
HORIZON MINERALS GOLD MINERAL RESOURCE ESTIMATE 1
Measured
Total
•
Indicated
Inferred
Total
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
1.31
1.34
56,300
16.48
1.82
963,081
12.74
1.90
778,373
30.37
1.84
1,797,764
The acquired Nickel Mineral Resources are mine ready for the next upswing in the Nickel
price. The acquired assets include infrastructure important to the development plans of
Horizon as a gold producer.
HORIZON MINERALS NCKEL MINERAL RESOURCE ESTIMATE3
MEASURED
Total
INDICATED
INFERRED
TOTAL
Kt
Ni%
Ni (t)
kt
Ni%
Ni (t)
kt
Ni%
Ni (t)
kt
Ni%
Ni (t)
1,475
0.84
13,200
23,600
0.98
233,500
17,000
1.03
176,000
42,100
1.00
422,700
Commenting on the Group MRE upgrade, Chief Executive Officer Mr Grant Haywood said:
“It is very pleasing to have completed the merger with Poseidon Nickel bringing in the surface
infrastructure including the Black Swan plant to refurbish and convert to a gold plant, but also the
substantial Nickel resource base. We also look forward to increasing our gold resources through
further M&A opportunities and organically through drilling which will commence this current June
2025 quarter”.
See Mineral Resource Table and Confirmations on Page 44. 2 see Mineral Resource Table and Confirmations on Pages 46. 3 see
Mineral Resource Table Pages 47 and JORC Table 1 summaries pp 50. 4 see ASX Disclosures pp 4 and Mineral Resource Table Page
47.
1
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
F: +61 8 8389 1597
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an updated
Mineral Resource Statement for the Company’s projects located near Kalgoorlie-Boulder in the heart
of the Western Australian goldfields (Figure 1). In addition, following the merger with Poseidon
Nickel Limited, the Company adds the Black Swan, Lake Johnston and Windarra nickel resources
and associated infrastructure to the Resource portfolio (Figure 1, Figure 2).
Figure 1 - Kalgoorlie Project Area Locations and Surrounding Infrastructure
Page 2 of 150
ASX ANNOUNCEMENT
Figure 2 - Regional Nickel Assets
Page 3 of 150
ASX ANNOUNCEMENT
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 4 of 150
ASX ANNOUNCEMENT
Listing Rule 5.8 Disclosures
Black Swan Project
Black Swan and Black Swan Stockpiles
GEOLOGY
Black Swan is located within the Boorara Domain of the Kalgoorlie Terrane. The mineralisation at
Black Swan occurs within the Black Swan Komatiite Complex, a lens of thin olivine cumulate and
spinifex textured komatiitic flows within an envelope of intermediate felsic lava and associated
volcanoclastic rocks (Hicks, 1998). Black Swan is one of several nickel sulphide deposits in the
Black Swan Komatiite Complex, which includes Black Swan, Silver Swan, Cygnet and Black Duck.
ASSUMPTIONS AND METHODOLOGY
This Mineral Resource estimate for the Black Swan Project is based on a number of factors and
assumptions:
•
•
•
•
•
•
•
A selection of available drilling data as of 9 July 2014 was used for the Mineral Resource
estimate. The data was restricted to drilling in the vicinity of the existing Black Swan Open
Pit. The drilling data was collected over several decades by numerous operating
companies.
Statistical and geostatistical analyses were carried out on drilling data composited to 2 m
downhole intervals. This included variography to model the spatial continuity of the grades
within each domain.
The Ordinary Kriging interpolation method was used for the estimation of Ni, As, Fe, MgO,
and S using variogram parameters defined from the geostatistical analysis.
The influence of high grade values for Ni and As were spatially restricted in the Talc domain
during estimation to ensure grades at depth were not overstated within the domain.
The Mineral Resource estimation approach has assumed that mining will take place using
an open pit, bulk mining method.
A Lerch-Grossman pit shell was used to constrain the depth of the extent of the Mineral
Resource classification and reporting of the Mineral Resource. The pit shell was
constructed using a US$14.6/lb Ni price, mining costs of approximately $7/t mined,
processing and administration costs of approximately A$25/t milled, and a revenue factor of
1.5 to allow for potential increases in nickel price. Nickel recovery was based on ore type
and metallurgical recoveries reported by previous owners of the Black Swan plant.
Mineral Resource classification was based principally on geological confidence, drill hole
spacing and grade continuity from available drilling data.
Page 5 of 150
ASX ANNOUNCEMENT
MINERAL RESOURCE STATEMENT
Source
Indicated
Inferred
Total
Mt
Ni %
Ni kt
Mt
Ni %
Ni kt
Mt
Ni %
Ni kt
Black Swan
8.4
0.70
59.1
20.7
0.54
111.9
29.1
0.59
170.9
Stockpiles
1.2
0.49
5.9
0.4
0.53
1.9
1.6
0.50
7.8
Total
9.6
0.68
64.9
21.1
0.54
113.8
30.7
0.58
178.7
Table 1- Black Swan Open Pit Mineral Resources at 0.4% Ni cut-off grade as at 22 July 2014
The Mineral Resource estimate was classified in accordance with guidelines provided in the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(JORC Code, 2012). The classification was based principally on geological confidence, drill hole
spacing and grade continuity from available drilling data.
Table 1 above summarises the Mineral Resources for Black Swan and associated stockpiles. The
mineralisation models and block reporting cut-off grades used in the in situ resource estimate for
Black Swan 0.4% Ni. For mine planning purposes, ore loss and dilution should be considered.
THE JORC CODE ASSESSMENT CRITERIA
The JORC Code (2012) describes a number of criteria, which must be addressed in the Public Report
of Mineral Resource estimates for significant projects. These criteria provide a means of assessing
whether or not parts of or the entire data inventory used in the estimate are adequate for that
purpose. The resource estimate stated in this document was based on the criteria set out in Table 1
of that Code. These criteria are discussed in Appendix A.
COMPETENT PERSON’S STATEMENT
The information in this report which relates to the Mineral Resource is based on information compiled
by Andrew Weeks who is a full-time employee of Golder Associates Pty Ltd, and Member of the
Australasian Institute of Mining and Metallurgy. Andrew Weeks has sufficient relevant experience
to the style of mineralisation and type of deposit under consideration and to the activity for which he
is undertaking to qualify as a Competent Person as defined in the JORC Code (2012).
Silver Swan
GEOLOGY AND GEOLOGICAL INTERPRETATION
The Silver Swan Massive (SSM) deposit comprises four narrow, high grade nickel sulphide
mineralised shoots, located along the basal ultramafic contact of the Black Swan Komatiite (BSK).
The BSK is a large extrusive ultramafic flow that can be traced over a 3,500m strike length and
extends at least 1,600m below surface. The width of the BSK varies from 150 to 600m in the central
area of the flow, which narrows significantly along strike north and south of the central portions of
the flow.
The four shoots that were assessed for this MRE are Goose, Peking Duck, Fledgling-Canard and
Tundra-Mute (Figure 1). There is remnant mineralisation located within the Goose shoot, and the
Page 6 of 150
ASX ANNOUNCEMENT
top 15m of the Fledgling-Canard shoot has also been mined. The Peking Duck and Tundra-Mute
shoots are unmined, other than some limited development in the upper portions of Tundra-Mute.
Within the Black Swan stratigraphy there are several late felsic to intermediate intrusive unites,
typically described as porphyritic dykes which have stoped out the mineralisation. These have been
depleted from the mineralisation by resetting the density to 0.00. As with the previous estimates,
these have been modelled to ensure that any mineralisation is suitably accounted for.
The BSK hosts both disseminated nickel sulphide (Black Swan Disseminated - BSD), and massive
sulphide nickel mineralisation (Silver Swan - SSM, White Swan - WSM, Cygnet - CM, Gosling - GM
and Golden Swan - GSM). The SSM mineralisation is the most significant massive sulphide
accumulation within the BSK, extending from 195m to 1,550m below surface and consisting of a
series of narrow, variably sized vertical shoots.
As a function of the depth of the SSM and the location of the available drilling locations, the majority
of the 2019 and earlier drilling was drilled at very acute intersection angles to the mineralisation. The
2020 and 2021 drilling aimed at improving the drillhole intersections and providing infill data for the
2019 MRE (Silver Swan Resource Upgrade and Black Swan Underground RC Drilling - ASX
Announcement 5 August 2019).
The 2020 and 2021 drilling programmes predominantly tested the Tundra-Mute shoot, with only a
very limited number of drillholes testing the Fledgling-Canard and Peking-Duck shoots, and no
additional drilling into the Goose shoot.
Following completion of the exploration drilling in the last quarter of 2021, the interpretations were
updated. The 2022 updated interpretations were prepared by Snowden Optiro, primarily using the
logged lithology codes identifying the predominantly massive sulphide lithologies, combined with
rock geochemistry.
Page 7 of 150
ASX ANNOUNCEMENT
Figure 3: Long section looking West showing simplified layout of the Silver Swan Deposits.
Page 8 of 150
ASX ANNOUNCEMENT
DRILLING TECHNIQUES
The pre-2020 drillhole downhole surveys were completed using a range of surveying methods
ranging from acid etch for the very early (1960 and 1970s) drilling, through to north seeking
gyro/REFLEX tools. As a consequence of the previous mining at Silver Swan, there is confidence
in the downhole survey data. This confidence is further supported by the observation by the
Poseidon team that the 2020 and 2021 drilling program intersected the mineralisation extremely
close to the target depths predicted from the 2019 estimate.
The Silver Swan MRE update is based on the 38 holes of the exploration and resource drilling
program undertaken by Poseidon in 2021. Drilling was conducted by Webdrill using a Diamec Smart
6 Mobile Carrier rig. The holes were drilled in NQ2 and the core was orientated using the Trucore
Orientation Tool and surveyed using the DHS DeviGyro OX tool.
Figure 4 - Long section showing historic and recent drilling around Silver Swan Deposits. The 2021
programme is shown as thicker drill traces.show the 2021 and historical drilling that was used as the
basis for this MRE.
Figure 4 - Long section showing historic and recent drilling around Silver Swan Deposits. The 2021 programme is shown
as thicker drill traces.
Page 9 of 150
ASX ANNOUNCEMENT
Figure 5 - Cross section looking North showing 2019 and 2021 program collar locations and improved drilling angles for
2021 Tundra-Mute program
Page 10 of 150
ASX ANNOUNCEMENT
SAMPLING AND SUB-SAMPLING TECHNIQUES
The Silver Swan mineralisation was identified visually using the presence, texture and proportion of
nickeliferous sulphide material, and lithology. Samples were divided into logged domains, with no
individual sample being greater than 1.2m or less than 0.2m. Core samples are sawn and were
sampled as half core, unless duplicates were taken, which required samples to be quarter core. All
sampling was as diamond core. Certified Reference Material (CRM) standards and blank samples
were submitted at nominal rate of 1 in 20 (achieved rate was 1 in 14 for the CRMs).
SAMPLE ANALYSIS METHOD
The pre-2020 assay data was generated by a range of techniques, predominantly x-ray fluorescence
(XRF) or ICP-MS and ICP-OES. No details of the historical sample preparation are available;
however, as noted, the previous mining successfully exploited the deposit for a number of years and
hence there is confidence in the historical analytical data.
All Silver Swan core samples submitted for assay in 2021 were analysed by the ICP-OES method,
which is a total analytical technique and considered appropriate for the style of mineralisation. For
the 2021 drilling programme, samples were dispatched to SGS in Perth. Post sample receipt and
drying, sample preparation consisted of crushing and pulverisation, followed by four acid digest. The
SGS ICP-OES technique code was ICP41Q. Each sample was analysed for a total of eleven
elements, including nickel, copper, cobalt, arsenic and sulphur.
ESTIMATION METHODOLOGY
Snowden Optiro prepared the interpretations primarily based upon the logged lithology (massive and
semi-massive sulphide) in combination with the available geochemistry.
The interpretations were used to flag the samples, from which 1.0 m length-density weighted
composites were created, which were used for estimation. Only arsenic required the use of topcuts, primarily to restrict the impact of extreme grades. However, the top-cuts applied for arsenic
were primarily to restrict the influence of the extreme values. As arsenic is a deleterious element,
the top-cuts were kept relatively optimistic to minimise the risk of artificially lowering the expected
arsenic for mine planning and scheduling purposes.
All boundaries were treated as hard for the purposes of estimation. Ordinary kriging (OK) was
selected as the preferred estimation technique because of the low variance/CV, low nugget
structures, and minimal skew exhibited in the respective grade distributions. Variography was
prepared for all variables using the data from Tundra-Mute Domain 204 exclusively, as this was the
only domain with a sufficient number of samples. A three-pass search strategy was used, with the
first pass search ranges of 30m x 15m x 5m in the plane of the mineralisation. A parent block size
of 2.0mE x 5mN x 5mRL was used.
Page 11 of 150
ASX ANNOUNCEMENT
CUT-OFF GRADE
The Mineral Resource was interpreted using the massive nickel sulphide texture and stratigraphic
position of the mineralisation. The Mineral Resource has been reported using a cut-off grade (COG)
of 1.0% nickel which reflects a nominal mining cut-off.
The grade distribution at 1% COG is shown in Figure 4.
MINERAL RESOURCE
Area
Silver Swan Resource - April 2022
Indicated
Inferred
Total
kt
Ni %
As
ppm
Co
ppm
Ni
metal
(t)
kt
Ni %
As
ppm
Co
ppm
Ni
metal
(t)
kt
Ni %
As
ppm
Co
ppm
Ni
metal
(t)
Tundra-Mute
99
8.7
2,990
1,720
8,625
6
5.9
1,500
770
370
105
8.6
2,900
1,660
8,995
Peking Duck
FledglingCanard
Goose
26
9.6
2,830
1,770
2,520
2
6.7
1,500
1,070
120
28
9.5
2,740
1,720
2,640
12
9.5
2,290
1,250
1,120
12
9.5
2,290
1,250
1,125
2
10.2
3,990
3,160
185
2
10.2
3,990
3,160
185
Total resource
138
9
2,910
1,700
12,450
146
9.5
3,060
1,650
12,940
8
6
1,500
840
490
Page 12 of 150
ASX ANNOUNCEMENT
Figure 6: Silver Swan Ni grade distribution at 1% COG
Page 13 of 150
ASX ANNOUNCEMENT
RESOURCE CLASSIFICATION AND REASONABLE PROSPECTS OF EVENTUAL ECONOMIC
EXTRACTION
The Mineral Resource has been classified into Indicated and Inferred categories following the
guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves, 2012 (the JORC Code). No Measured Mineral Resources have been defined. The
classification criteria were assigned based on the robustness of the input data, the drillhole spacing,
geological confidence and grade continuity. The classification reflects the Competent Person’s
views of the deposit.
The Indicated Mineral Resource is of a moderate confidence. These areas are considered to have
a moderate to high confidence in the geological interpretation, are considered well informed and are
supported by a nominal drill spacing less than 20mN x 20mRL, with suitable drillhole intersection
angles, and where grade and geological continuity can be assumed.
The Inferred Mineral Resource is of a low confidence. These areas are considered to have a low or
variable confidence in the geological interpretation, are considered poorly informed supported by a
nominal drill spacing greater than 20mN x 20mRL, and/or with increasingly acute drillhole
intersection angles, and where grade and geological continuity is implied but cannot be assumed.
Reasonable prospects for eventual economic extraction (RPEEE) have been demonstrated by the
previous underground mining of the Cygnet, Gosling and Silver Swan orebodies, which are of
comparable volumes and grade and at similar depths and are spatially adjacent to Golden Swan.
RPEEE considerations meant that only hanging wall mineralisation adjacent to the contact
mineralisation was considered a Mineral Resource. The current price of Nickel is not favourable for
the economic extraction of the resource, however, the cyclical nature of metal prices has been
demonstrated historically, so it is expected that there is a reasonable prospects for eventual
economic extraction in the future.
The distribution of Indicated and Inferred resources at Silver Swan is shown in Figure 5.
Page 14 of 150
ASX ANNOUNCEMENT
Figure 7: Silver Swan 2022 Resource Categories
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Targeting and Results is based on, and fairly
represents, information compiled and reviewed by Mr Andrew Pearce, who is an employee of
Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists.
The information in this report which relates to the Silver Swan Mineral Resource is based on, and
fairly represents, information compiled by Mr Andrew Pearce, Exploration Manager, who is a fulltime employee at Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists and
Page 15 of 150
ASX ANNOUNCEMENT
Mr Ian Glacken who is a full time employee of Snowden Optiro Pty Ltd and is a Fellow of the
Australasian Institute of Mining and Metallurgy.
Mr Pearce and Mr Glacken have sufficient experience which is relevant to the style of mineralisation
and type of deposits under consideration and to the activity which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code 2012). Mr Pearce and
Mr Glacken consent to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Page 16 of 150
ASX ANNOUNCEMENT
Golden Swan
GEOLOGY
The Golden Swan nickel sulphide deposit is located within the Black Swan Komatiite complex, 450m
south of the high-grade Silver Swan massive sulphide deposit. Mineral Resources at Golden Swan
have been estimated for three contact (C10460, C10360 and C10300) and two hanging wall
mineralised lenses (U10450 and U10370). The contact mineralisation which consists predominantly
of massive to semi-massive sulphide, is developed on the contact between an underlying felsic
volcanic unit referred to as the Southern Terrace and the overlying Black Swan komatiite (host to
the Black Swan disseminated sulphide deposit). Within the overlying Black Swan komatiite
succession, minor disseminated/blebby nickel sulphide lenses (hanging wall mineralisation) have
been developed adjacent to two of the contact mineralisation lenses (Figure 1). The entire
stratigraphy has been intruded by late-stage felsic porphyry dykes, none of which have been
observed to date to impact the Golden Swan deposit.
The three contact mineralised lenses at Golden Swan strike north-south, dip steeply east to vertical,
with highly variable horizontal widths between 2.0 to 3.6 m. The uppermost lens (C10460) develops
approximately 880 m below surface and extends 50 m along strike and 40 m vertically. The second
lens (C10360) develops approximately 960 m below surface and extends 70 m along strike and 85
m vertically. The third lens (C10300) commences 1,000 m) below surface and extends for 40 m
along strike and 35 m vertically.
The hanging-wall mineralisation occurs as two discrete disseminated sulphides lenses (Figure 1),
developed between approximately 0 to 10 m in the hanging-wall (to the east) of the C10460 and
C10360 contact lenses. The upper hanging-wall lens (U10450) adjacent to the C10460 lens,
commences 900 m below surface, is 65 m along strike, 35 m vertically and has 2.8 m average
horizontal width, dipping steeply to the east. The lower hanging-wall lens adjacent to the C10360
lens commences 950 m below surface, is 110 m along strike, 100 m vertically and has 2.6 m
horizontal width. The upper two-thirds of the lens dips steeply to the west, and the lower third flattens
out with depth to a moderate easterly dip.
Page 17 of 150
ASX ANNOUNCEMENT
Figure 8 -Mineral Resource shapes overlying modelled shapes - Contact Mineralisation.
Page 18 of 150
ASX ANNOUNCEMENT
Figure 9 - Mineral Resource shapes overlying modelled shapes - Hangingwall mineralisation overlying Contact
Mineralisation pods.
Page 19 of 150
ASX ANNOUNCEMENT
The C10460 and C10360 lenses have a mix of massive/semi-massive and matrix/disseminated
sulphide mineralisation. To constrain the two styles of mineralisation, a categorical indicator (CI)
approach within the two lenses was implemented. This provided 3 dimensionally consistent subdomains within each of the two lenses. The CI approach used a grade indicator of 5% sulphur, and
a 50% probability threshold to differentiate massive/semi-massive and the matrix/disseminated
mineralisation styles. The CI approach was not required for the C10300 lens as there was no mix
of massive/semi-massive and matrix/disseminated style mineralisation.
ESTIMATION
Kriging neighbourhood analysis using the variography for the contact mineralisation was undertaken
to optimise the parent block size, and a three-pass search strategy was employed for all domains.
For the contact mineralisation the first estimation pass searched 65 m x 65 m x 7.5 m. The second
search pass doubled the search distance, and the final search pass doubled the distance again.
Passes one and two used between 6 and 20 samples, and the third pass used between 4 and 12
samples. Within the two contact lenses (C10460 and C1036) which were based upon the CI subdomains, a restriction of 4 samples per drillhole was used. No such restriction was applied to the
C10300 lens.
For the hanging-wall mineralisation the first estimation pass searched 32.5 m x 32.5 m x 7.5 m. The
second search pass doubled the search distance, and the final search pass doubled the distance
again. Passes one and two used between 6 and 20 samples, and the third pass used between 4
and 12 samples. No restriction on the number of samples per drillhole was used for the hanging-wall
mineralisation.
Block grades for nickel, cobalt, copper, iron, magnesium oxide, sulphur, arsenic and measured
density were estimated using Ordinary Kriging into mineralisation lenses, with lenses C10460 and
C10360 using the CI sub-domains. All boundaries were treated as hard.
The Mineral Resource estimate has been validated both visually and statistically. For all estimated
lenses, block model grades (domain and global) have been validated against the de-clustered and
top-cut input composite grades. Swath plots in northing, easting and elevation directions were also
examined, and a visual comparison of the input composite grades against the estimated block
grades was completed in cross-section.
CLASSIFICATION
The Mineral Resource has been classified into Indicated and Inferred categories following the
guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves, 2012 (the JORC Code). No Measured Mineral Resources have been defined. The
classification criteria were assigned based on the robustness of the input data, the drill hole spacing,
geological confidence and grade continuity. The classification reflects the Competent Person’s
views of the deposit.
Reasonable prospects for eventual economic extraction (RPEEE) have been demonstrated by the
previous underground mining at the Cygnet and Silver Swan prospects, which are of comparable
Page 20 of 150
ASX ANNOUNCEMENT
volumes and grade and at similar depths and are spatially adjacent to Golden Swan. RPEEE
considerations meant that only hanging wall mineralisation adjacent to the contact mineralisation
was considered a Mineral Resource. The current price of Nickel is not favourable for the economic
extraction of the resource, however, the cyclical nature of metal prices has been demonstrated
historically, so it is expected that there is a reasonable prospects for eventual economic extraction
in the future.
Indicated Resources have been assigned to mineralisation domains where the drill hole spacing is
well informed (spacing less than 25 m in northing and elevation), where the mineralisation correlates
with the ultramafic stratigraphy (i.e. higher grades at the stratigraphic footwall with disseminated
sulphides reducing away from the basal position), and where the grade and geological continuity
can be assumed.
MINERAL RESOURCE
Ni
Co
Cu
Fe
S
MgO
As
Ni
%
ppm
%
%
%
%
ppm
Tonnes
16,566
1.74
411
0.09
11
4.1
20.3
467
288
2.96
1,031
1.82
332
0.08
9.6
3.7
16.6
351
19
5,791
3.04
17,597
1.74
406
0.09
10.9
4
20.1
460
306
Indicated
15,464
3.5
54,057
6.05
1,232
0.47
21.8
13.5
15.4
410
3,272
Inferred
1,887
3.47
6,547
5.3
1,197
0.37
22.7
15.6
15.3
532
347
Ind + Inf
17,350
3.49
60,604
5.97
1,228
0.46
21.9
13.8
15.4
423
3,618
Indicated
12,615
3.25
41,001
4.02
705
0.24
15.7
8.3
20
321
1,649
Inferred
379
3.25
1,231
3.85
691
0.19
15.7
7.9
19.3
435
47
Ind + Inf
12,994
3.25
42,232
4.02
704
0.24
15.7
8.3
20
324
1,696
Indicated
33,521
3.33
111,624
4.67
916
0.33
17.94
10.2
17.8
386
5,208
Inferred
2,614
3.37
8,809
4.69
1,025
0.31
20.19
13.1
16
497
413
Ind + Inf
36,135
3.33
120,433
4.67
924
0.33
18.1
10.4
17.7
394
5,621
U10370
Inferred
12,833
3.04
38,976
1.62
306
0.08
8
3.2
26.9
145
630
U10450
Inferred
219
2.97
649
1.01
222
0.06
6.7
1.7
31
44
7
Combined
Inferred
13,052
3.04
39,625
1.61
305
0.08
8
3.2
26.9
143
636
Indicated
33,521
3.33
111,624
4.67
916
0.33
17.9
10.2
17.8
386
5,208
Inferred
15,666
3.09
48,434
2.17
436
0.12
10.2
5
25
208
1,049
Ind + Inf
49,187
3.25
160,058
3.91
771
0.27
15.6
8.6
20
332
6,257
Type
DOM
C10300
C10360
Contact
C10460
Combined
H/W
All
Volume
Density
m3
t/m3
Indicated
5,443
3.04
Inferred
348
Ind + Inf
Class
Tonnes
COMPETENT PERSON STATEMENTS
The information in this report that relates to Exploration Targeting and Results is based on, and fairly
represents, information compiled and reviewed by Mr Andrew Pearce, who is an employee of
Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists.
Page 21 of 150
ASX ANNOUNCEMENT
The information in this report which relates to the Golden Swan Mineral Resource is based on, and
fairly represents, information compiled by Mr Andrew Pearce, Exploration Manager, who is a fulltime employee at Poseidon Nickel, and is a Member of The Australian Institute of Geoscientists and
Mr Ian Glacken who is a full time employee of Optiro Pty Ltd and is a Fellow of the Australasian
Institute of Mining and Metallurgy.
Mr Pearce and Mr Glacken have sufficient experience which is relevant to the style of mineralisation
and type of deposits under consideration and to the activity which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code 2012). Mr Pearce and
Mr Glacken consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Silver Swan Tailings
MINERAL RESOURCE SUMMARY
The Company undertook a sonic drilling programme over the Silver Swan Tailings (SST)
impoundment in 2018, with the aim of delineating a Mineral Resource for subsequent treatment. A
Block Model was generated by the Company in 2018. In August 2021, Poseidon engaged Optiro Pty
Ltd (Optiro) to review the Block Model, the drilling QAQC and carry out a site visit to the SST. The
Block Model was validated against the drilling for the key elements and the QAQC data was
processed.
Optiro endorsed the Block Model as being representative of the drilling and has reported and
classified the tailings according to the JORC Code (2012) as a Measured Mineral Resource. The
Mineral Resource estimate for the SST is documented in Table 1.
Table 1: Measured