BOORARA GOLD PROJECT – MINING UNDERWAY
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to provide an update
on the development of the Boorara Gold Project (“Boorara”).
HIGHLIGHTS
•
Horizon approved the development of Boorara in late July 2024 to mine a series of four open
pits containing 1.24 Mt of ore at 1.24 g/t Au for 49.5 koz of gold 1
•
Mining to occur over 14 months and processing over 19 months at Norton Gold Fields’
Paddington plant to generate $30 million in free cashflow at a gold price of A$3,600/oz 2
•
Boorara mining services and surface ore haulage contracts awarded to Hampton Transport
Services Pty Ltd (“Hampton”) on competitive terms, with no mining contractor payments until
first gold pour sold and funds received
•
Hampton has successfully mobilised and established the site, and grade control drilling is
well advanced
•
Mining has commenced with the first drill and blast pattern fired last week to build up broken
stocks in conjunction with free dig areas in Pit 2, the larger pit in the Regal zone of the Boorara
ore system
•
Excavation has commenced on single shift, transitioning to double shift by the end of August,
with a second digger shift commencing in September and ramping up to four digger shifts by
the end of September
•
All activities have been undertaken productively and safely
•
First ore on track to be mined in September and processed at Paddington in October 2024
Commenting on the mining of Boorara, Managing Director and CEO Mr Grant Haywood said: 3
“It is very pleasing to see mining accelerating at Boorara, with all activities being undertaken ahead
of schedule and safely, which is a credit to the site team and our contract business partners.
We are eagerly awaiting mining progressing to expose first ore in September and pouring gold bars
in October to give us first revenue from Boorara in this strong gold price environment.
This is a major milestone for Horizon as we commence our journey to be a long-term sustainable
gold producer, delivering significant cashflows into the business to create further value through our
significant portfolio of assets.”
As announced to the ASX on 1 August 2024 and see Ore Reserves Statement and confirmations on Page 5. 2 As announced to the
ASX on 29 July 2024. 3 See Forward Looking and Cautionary Statements on Page 6.
1
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an update
on the development of the Boorara Gold Project. The proposed mining project is 100% owned and
located 15km east of Kalgoorlie-Boulder, adjacent to the Super Pit in the heart of the Western
Australian goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Page 2 of 6
ASX ANNOUNCEMENT
Figure 2: Grade Control (blue rig), blast hole drilling and loading first shot (23 August 2024)
Figure 3: Initiation of first blast adjacent to existing Regal West pit (23 August 2024)
Page 3 of 6
ASX ANNOUNCEMENT
Figure 4: Drilling second shot with load and haul operations in background (27 August 2024)
Next Steps 1
Complete Phase 1 of the grade control drilling program, and gradually ramp-up load and haul
production activities throughout the remainder of August and September. First milling and gold
production is expected in October 2024.
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
1
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
See Forward Looking and Cautionary Statements on Page 6.
Page 4 of 6
ASX ANNOUNCEMENT
Ore Reserve Statement
Location
Boorara Open Pit
Cannon Underground
Total Ore Reserves
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
Proved
0
0.00
0
Probable
135.0
4.1
17.68
Total
135.0
4.1
17.68
TOTAL
1,374.1
1.52
67.18
Confirmation
The information in this report that relates to Horizon’s Mineral Ore Reserves is extracted from
and was originally reported in Horizon’s ASX announcements “Positive Results for Cannon
Underground Gold Project and Feasibility Study Update”, (ASX: HRZ) (Cannon) dated 29 March
2022, “Boorara Ore Reserve Supports Development - Amended” (Boorara) dated 1 August
2024.
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements and that all material assumptions
and technical parameters underpinning the estimates in those announcements continue to apply
and have not materially changed. The Company confirms that the form and context of the
Competent Person’s findings in relation to those Mineral Resources estimates or Ore Reserves
estimates have not been materially modified from the original market announcements.
Page 5 of 6
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and
financial performance. Forward looking statements include, but are not limited to, statements
preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”,
“intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar
expressions. Forward looking statements, opinions and estimates included in this announcement
are based on assumptions and contingencies which are subject to change without notice, as are
statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be
relied on as a guarantee of future performance. Forward looking statements may be affected by a
range of variables that could cause actual results to differ from estimated results, and may cause
the Company’s actual performance and financial results in future periods to materially differ from
any projections of future performance or results expressed or implied by such forward looking
statements. These risks and uncertainties include but are not limited to liabilities inherent in mine
development and production, geological, mining and processing technical problems, the inability
to obtain any additional mine licenses, permits and other regulatory approvals required in
connection with mining and third party processing operations, competition for among other things,
capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments
of the value of acquisitions, changes in commodity prices and exchange rate, currency and interest
fluctuations, various events which could disrupt operations and/or the transportation of mineral
products, including labour stoppages and severe weather conditions, the demand for and
availability of transportation services, the ability to secure adequate financing and management’s
ability to anticipate and manage the foregoing factors and risks. There can be no assurance that
forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements
in the announcement, including with respect to any production targets and financial estimates,
based on the information contained in this and previous ASX announcements.
Page 6 of 6
Share your feedback
Discover