Drilling Results Monument and Pinner Open Pit Potential
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
31 AUGUST 2023
DRILLING RESULTS FROM MONUMENT AND PINNER
ADVANCE OPEN PIT POTENTIAL
HIGHLIGHTS
•
A small, third pass resource drilling programme has been completed at the new Monument
and Pinner gold prospects, located 30km southeast of Kalgoorlie-Boulder in the Western
Australian Goldfields.
•
Monument and Pinner both sit approximately 1km south-west from Horizon’s fully funded
Cannon underground project where first gold production is targeted for 2024.
•
26 holes totalling 1,259m of Air Core (AC) and Reverse Circulation (RC) drilling targeted
shallow mineralisation to increase drill density and resource confidence to support
assessment of small-scale open cut mining.
•
Significant mineralisation intercepted included: 1
o
2m @ 3.03g/t Au from 36m and 4m @ 0.55g/t Au from 41m (CAAC23010)
o
9m @ 1.36g/t Au from 27m (CAAC23003)
o
2m @ 2.12g/t Au from 10m, 1m @ 1.11g/t Au from 15m and 1m @ 0.74g/t Au from
21m (CAAC23011)
o
6m @ 1.23g/t Au from 28m (CAAC23013)
•
Follow up work planned includes a resource update for the 25koz Monument deposit, a
maiden resource for Pinner and a Pre-Feasibility Study. 2
•
Future mining at Monument and Cannon would benefit from synergies created through the
proposed Cannon underground mine and supply additional ore for toll treatment. 2
Commenting on the drilling results, Chief Executive Officer Mr Grant Haywood said:
“It’s pleasing to see the results have validated historic drilling and the infill holes have come in as
expected. This will lead to a maiden resource for Pinner and an update for Monument, both of which
present as potential bolt-on open pit opportunities to our Cannon underground gold project.”
“Once the resource models are completed, we’ll undertake optimisation and mine design studies to
continue development of this future production hub in the Greater Boorara-Cannon area. The mining
infrastructure we’re installing at Cannon means shallow, oxide open pit mines can generate modest
but high-margin cashflow to support our ongoing development and exploration activities.”
See Table 1 and Competent Persons Statement on pages 6 and 7 and JORC Tables on Page 11. 2 See Forward Looking and
Cautionary Statements on Page 10.
1
163 Stirling Hwy
Nedlands WA 6009
PO Box 1104
Nedlands WA 6909
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to announce new gold
drilling results from the 100% owned Greater Boorara - Cannon project area located 30km southeast
of Kalgoorlie-Boulder in the heart of the Western Australian goldfields (Figure 1).
Figure 1: Horizon’s Project area location, resources and surrounding infrastructure
The drilling forms part of the current FY24 exploration program focussing on new discoveries within
the Greater Boorara – Cannon, Lakewood and Yarmany project areas.
The Cannon area is highly prospective with several historic prospects located within a 1km radius of
the open cut mine at Cannon. Two of the more advanced prospects, Monument and Pinner, were
drilled in 2022 to both validate historic drilling and test for potential strike and depth extensions. A
third pass program was deemed necessary to upgrade the shallow oxide ore from the current JORC
2012 Inferred Category to an Indicated Status. Pinner was classified as a JORC 2004 Inferred
resource in 2013 which has not been reported.
Page 2 of 20
ASX ANNOUNCEMENT
Project Geology
The Cannon deposit (Figure 2) is located 30km east-southeast of Kalgoorlie in the Eastern Goldfields
region of Western Australia on granted mining leases M25/333 and M25/357.
The Cannon mine and surrounding area is dominated by mafic to ultramafic rocks of the Bulong
Complex overlain by a sequence of felsic volcanics, volcanoclastics and sediments. Lithologies
presented include komatiitic mafics and ultramafics, peridotites, basalts and gabbros. Sedimentary
rocks include shales and cherts with rare, banded iron formation. The geological structure is complex
and is recognised as a key ingredient for local gold and nickel sulphide mineralisation.
The Cannon deposit was discovered by Southern Gold Limited in 2008 following up geochemical
anomalies testing for strike extensions of the George’s Reward mineralisation immediately north of
the deposit.
Summary of Results
The Monument prospect is located 900m southwest of the Cannon open cut mine and spans
approximately 600m and striking NNW. The mineralisation is related to quartz-pyrite veining within
porphyry dykes and foliated basalts. Pinner could be considered as an offset, southern extension of
the NE striking Cannon mineralisation where the gold is found within basalts and ultramafic rocks
hosting quartz-pyrite and lesser carbonate veins and stockworks.
The recent drilling focussed on improving the drill density in the more prospective shallow areas of
Monument and Pinner in relation to JORC classification guidelines.
Better results at Monument include:
o
9m @ 1.36g/t Au from 27m (CAAC23003)
o
1m @ 0.92g/t Au from 29m, 4m @ 1.23g/t Au from 38m and 1m @ 3.38g/t Au from
47m (CARC23007)
o
7m @ 1.32g/t Au from 53m (CARC23009)
Better results at Pinner include:
o
2m @ 3.03g/t Au from 36m and 4m @ 0.55g/t Au from 41m (CAAC23010)
o
2m @ 2.12g/t Au from 10, 1m @ 1.11g/t Au from 15m and 1m @ 0.74g/t Au from 21m
o
6m @ 1.23g/t Au from 28m (CAAC23013)
(CAAC23011)
Overall, the results were as expected with drilling confirming the variable nature of both Pinner and
Monument mineralisation. Should mining proceed, it is expected that in-pit mapping and grade
control will further improve geological understanding.
See Table 1 and Competent Persons Statement on pages 6 and 7 and JORC Tables on Page 11. 2 see Forward Looking and
Cautionary Statements on Page 10.
1
Page 3 of 20
ASX ANNOUNCEMENT
Figure 2: Cannon Project area showing surrounding prospects
Figure 3: Monument highlights and drilling location plan
Page 4 of 20
ASX ANNOUNCEMENT
Figure 4: Pinner highlights and drilling location plan
Next Steps 1
Horizon plans to update the Monument and Pinner resources to JORC 2012 Indicated and Inferred
categories. The two Mineral Resource Estimates will be used for Pre-Feasibility Studies for each
project, with a view to fast tracking potential small open pit mining operations leveraging off the
shared infrastructure at Cannon. Approvals and planning are in train already.
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Chief Executive Officer
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
1
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
See Forward Looking and Cautionary Statements on Page 10.
Page 5 of 20
ASX ANNOUNCEMENT
Table 1: Monument and Pinner prospects significant downhole single and composite AC and RC
intercepts, nominally >0.5g/t Au. True width intercepts are not known but estimated to be close
(~75%) of the downhole width.
Hole Id
East
(m)
North
(m)
Monument Prospect (>0.5 g/t Au)
Depth
(m)
Dip
Azimuth
From
(m)
To
(m)
Interval
(m)
Au g/t
(FA50)
CAAC23001
CAAC23002
381550
381041
6589868
6589199
48
42.00
-60
-60
090
090
21
23
23
24
2
1
0.71
0.66
CAAC23003
380807
6589580
36.00
-60
090
27
36
9
1.36
CAAC23004
380830
6589540
42.00
-60
090
NSA
CAAC23005
380816
6589559
42.00
-60
090
NSA
CARC23007
380780
6589600
66.00
-60
090
29
30
1
0.92
38
42
4
1.23
47
48
1
3.38
CARC23008
380831
6589520
66.00
-60
090
26
29
3
0.75
CARC23009
380790
6589559
66.00
-90
090
53
60
7
1.32
CARC23010
380778
6589580
60.00
-60
090
40
41
1
0.72
45
46
1
1.65
52
55
3
0.68
58
60
2
0.83
CARC23011
380751
6589580
90.00
-60
090
NSA
CARC23012
380754
6589540
114.00
-60
090
NSA
CARC23013
380829
6589376
120.00
-60
090
NSA
Pinner Prospect (>0.5 g/t Au)
CAAC23006
381577
6589886
30.00
-60
132
NSA
CAAC23007
381577
6589872
24.00
-60
132
NSA
CAAC23008
381577
6589860
24.00
-60
132
CAAC23009
381539
6589894
24.00
-60
132
20
24
4
0.76*
CAAC23010
381550
6589868
48.00
-60
132
36
38
2
3.03
41
45
4
0.55
10
12
2
2.12
15
16
1
1.11
21
22
1
0.74
8
12
4
0.97
29
37
8
1.00
28
34
6
1.23
CAAC23011
381531
6589888
32.00
-60
132
NSA
CAAC23012
381562
6589843
39.00
-60
132
CAAC23013
381551
6589853
54.00
-60
132
CAAC23014
381569
6589823
30.00
-60
132
2
3
1
1.85
CAAC23015
381560
6589831
30.00
-60
132
26
27
1
1.56
CAAC23016
381548
6589842
42.00
-60
132
39
40
1
0.84
CAAC23017
381518
6589873
24.00
-60
132
16
18
2
2.15
CAAC23018
381511
6589880
36.00
-60
132
CAAC23019
381558
6589823
42.00
-60
132
0
1
1
0.89
25
27
2
0.86
27
28
1
0.89
* Denotes 4m composite assay results with 1m split assays pending.
Page 6 of 20
ASX ANNOUNCEMENT
Competent Person Statement
Information in this announcement that relates to exploration results is based on information compiled
by David O’Farrell who is the Exploration Manager of Horizon Minerals. Mr O’Farrell is a Member of
The Australian Institute of Mining and Metallurgists (AusIMM) and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity that
he is undertaking, to qualify as Competent Person as defined in the 2012 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr O’Farrell
consents to the inclusion in the document of the information in the form and context in which it
appears.
Page 7 of 20
ASX ANNOUNCEMENT
Horizon Minerals Limited – Summary of Gold Mineral Resources
Project
Cutoff
Measured
Indicated
Inferred
Total
Au g/t
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Boorara OP
0.5
1.28
1.23
50,630
7.19
1.27
294,140
2.6
1.3
103,470
11.03
1.26
448,240
Golden Ridge
1.0
0.47
1.83
27,920
0.1
1.7
2,800
0.52
1.82
30,720
Golden Ridge
North
0.8
0.65
1.15
24,260
0.77
1.30
32,340
1.42
1.23
56,600
Cannon UG
1.0
0.19
4.80
28,620
0.1
2.3
3,450
0.23
4.29
32,070
Monument
0.8
0.39
1.97
25,000
0.39
1.97
25,000
Pennys Find
1.5
0.20
5.45
35,000
0.1
3.6
8,000
0.27
4.99
43,000
Kalpini
0.8
1.40
2.43
108,000
0.5
2.0
31,000
1.87
2.33
139,000
Rose Hill UG
2.0
0.33
4.50
47,100
0.2
4.8
27,800
0.51
4.60
74,900
Rose Hill OP
0.5
0.09
2.00
6,100
0.29
2.00
18,400
Jacques-Peyes
0.8
0.97
2.59
81,000
0.8
2.0
49,000
1.74
2.32
130,000
Teal
1.0
1.01
1.96
63,680
0.8
2.5
64,460
1.81
2.20
128,140
Crake
0.8
1.33
1.47
63,150
0.1
1.3
3,300
1.42
1.46
66,450
Coote
1.0
0.4
1.5
21,000
0.42
1.54
21,000
Capricorn
0.5
0.7
1.2
25,500
0.70
1.20
25,500
Baden Powell
0.5
0.6
1.2
23,000
0.60
1.20
23,000
8.16
1.60
420,120
23.22
1.69
1,262,000
Total
0.19
1.47
2.00
1.33
12,300
62,930
13.83
1.75
779,000
Confirmation
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted from
and was originally reported in Horizon’s ASX announcements “Intermin’s Resources Grow to over
667,000 Ounces” dated 20 March 2018, “Rose Hill firms as quality high grade open pit and
underground gold project” dated 8 December 2020, “Updated Boorara Mineral Resource Delivers a
34% Increase In Gold Grade” dated 27 April 2021, “Penny’s Find JV Resource Update” dated 14
July 2021, “Updated Crake Resource improves in quality” dated 7 September 2021, “Jacques FindPeyes Farm Mineral Resource update” dated 15 September 2021 and “Kalpini Gold Project Mineral
Resource Update” dated 28 September 2021, each of which is available at www.asx.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and
technical parameters underpinning the estimates in those announcements continue to apply and
have not materially changed. The Company confirms that the form and context of the Competent
Person’s findings in relation to those Mineral Resources estimates or Ore Reserves estimates have
not been materially modified from the original market announcements.
Page 8 of 20
ASX ANNOUNCEMENT
Horizon Minerals Limited – Summary of Vanadium / Molybdenum Mineral Resources
Project
Cut-off
grade
(%)
Tonnage
(Mt)
Rothbury (Inferred)
0.30
Lilyvale (Indicated)
Grade
Metal content (Mt)
V2O5 (%)
Mo (ppm)
Ni (ppm)
V2O5
Mo
Ni
1,202
0.31
259
151
3.75
0.31
0.18
0.30
430
0.50
240
291
2.15
0.10
0.10
Lilyvale (Inferred)
0.30
130
0.41
213
231
0.53
0.03
0.03
Manfred (Inferred)
0.30
76
0.35
369
249
0.26
0.03
0.02
1,838
0.36
256
193
6.65
0.46
0.36
TOTAL
Horizon Minerals Limited – Summary of Silver / Zinc Mineral Resources
Nimbus All Lodes (bottom cuts 12g/t Ag, 0.5% Zn, 0.3g/t Au)
Category
Tonnes
Grade
Grade
Grade
Ounces
Ounces
Tonnes
Zn ('000t)
Mt
Ag (g/t)
Au (g/t)
Zn (%)
Ag (Moz)
Au
('000oz)
Measured Resource
3.62
102
0.09
1.2
11.9
10
45
Indicated Resource
3.18
48
0.21
1.0
4.9
21
30
Inferred Resource
5.28
20
0.27
0.5
3.4
46
29
Total Resource
12.08
52
0.20
0.9
20.2
77
104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2800g/t Ag top cut)
Category
Tonnes
Grade
Grade
Ounces
Tonnes
Mt
Ag (g/t)
Zn (%)
Ag (Moz)
Zn (‘000t)
Measured Resource
0
0
0
0
0
Indicated Resource
0.17
762
12.8
4.2
22
Inferred Resource
0.09
797
13.0
2.2
11
Total Resource
0.26
774
12.8
6.4
33
Confirmation
The information is this report that relates to Horizon’s Mineral Resources estimates on the Richmond
Julia Creek vanadium project and Nimbus Silver Zinc Project is extracted from and was originally
reported in Intermin’s and MacPhersons’ ASX Announcement “Intermin and MacPhersons Agree to
Merge – Creation of a New Gold Company Horizon Minerals Ltd” dated 11 December 2018 and in
MacPhersons’ ASX announcements “Quarterly Activities Report” dated 25 October 2018, “Richmond
– Julia Creek Vanadium Project Resource Update” dated 16 June 2020, “New High Grade Nimbus
Silver Core Averaging 968 g/t Ag” dated 10th May 2016 and “Nimbus Increases Resources” dated
30th April 2015, each of which is available at www.asx.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the original
market announcements and that all material assumptions and technical parameters underpinning the
estimates in those announcements continue to apply and have not materially changed. The Company
confirms that the form and context of the Competent Person’s findings in relation to those Mineral
Resources estimates have not been materially modified from the original market announcements.
Page 9 of 20
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological,
mining and processing technical problems, the inability to obtain any additional mine licenses, permits
and other regulatory approvals required in connection with mining and third party processing
operations, competition for among other things, capital, acquisition of reserves, undeveloped lands
and skilled personnel, incorrect assessments of the value of acquisitions, changes in commodity
prices and exchange rate, currency and interest fluctuations, various events which could disrupt
operations and/or the transportation of mineral products, including labour stoppages and severe
weather conditions, the demand for and availability of transportation services, the ability to secure
adequate financing and management’s ability to anticipate and manage the foregoing factors and
risks. There can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) where applicable
and the current ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward-looking statements in
the announcement, including with respect to any production targets and financial estimates, based
on the information contained in this and previous ASX announcements.
Page 10 of 20
ASX ANNOUNCEMENT
Appendix 1 Cannon Au-Ni Project
JORC Code (2012) Table 1, Section 1 and 2
Mr David O’Farrell, Exploration Manager compiled the information in Section 1 and Section 2 of the following JORC Table 1 and is the Competent Person for
those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition) requirements for the reporting of Mineral
Resources. For further detail, please refer to the announcements made to the ASX by Horizon Minerals Ltd (2019-2022) relating to the Cannon project area.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• 4m composite samples taken with a hand size aluminium scoop being
thrust into samples piles on the ground. 1m single splits taken off rig with
cone splitter or a manual splitter and later submitted to lab if 4m
composite returns >0.1g/t. Average sample weights are about 1.5-3.5 kg.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• For AC and RC drilling regular air and manual cleaning of cyclone to
remove hung up clays where present. Standards & replicate assays taken
by the laboratory. Based on statistical analysis of these results, there is no
evidence to suggest the samples are not representative.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
• AC and RC drilling was used to obtain 1m samples from which
approximately 1.5-3kg was pulverised to produce a 50 g charge for fire
assay. AC and RC chips were geologically logged over 1m intervals,
initially sampled over 4m composite intervals and then specific anomalous
intervals were sampled over 1m intervals. Depending on the final hole
depth, the maximum composite interval was 4m and minimum was 1m.
Samples were assayed for Au by Fire Assay. Routine checks are
undertaken. Drilling of mainly oxide, transitional and fresh rocks with
gold..
Page 11 of 20
ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Commentary
cases, more explanation may be required,
such as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of
detailed information.
Drilling techniques
Drill type (e.g., core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g., core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
• RC drilling was typically a 5 ¼” hammer bit. AC drilling was conducted using
a 3.5” air core and hammer bit.
Drill sample recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
• AC and RC recovery and meterage was assessed by comparing drill chip
volumes (sample bags) for individual meters. Estimates of sample
recoveries were recorded. Routine checks for correct sample depths are
undertaken every RC rod (6m) and AC rod (3m). The cyclone was routinely
cleaned ensuring no material build up.
• Due to the generally good/standard drilling conditions around sample
intervals (dry) the geologist believes the samples are representative, some
bias would occur in the advent of poor sample recovery which was logged
where rarely encountered. Only occasional wet or puggy drilling was
observed.
• No sample bias has been identified to date.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
• Drill chip logging and core was completed on one metre or selected
intervals at the rig by the geologist. The log was recorded onto standard
excel logging sheets, and later transferred into Micromine and Geobank
software once back at the office.
• Logging was qualitative in nature.
• All intervals logged for AC and RC drilling.
Page 12 of 20
ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Commentary
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
Sub-sampling
techniques and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all cores taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• 4m composite and 1m AC and RC samples taken.
• Single splits were automatically taken by off the rig, 4m composites were
taken by HRZ geologists. Samples collected in mineralisation were all dry
except for some at depth and these were recorded on logs.
• For Horizon samples, no duplicate 4m composites were taken in the field.
4m and 1m samples were analysed by SGS (Kalgoorlie).
• Samples were consistent and weighed approximately 1.5-3.5kg and
sampling procedures are constantly monitored
• Once samples arrived in Kalgoorlie, further work including duplicates and
QC was undertaken at the laboratory. Horizon has determined that there is
sufficient drill data density to calculate a updated Mineral Resource
Estimate at the present time. This will be undertaken in 2022.
• Mineralisation is located in weathered and fresh ultramafic rock, porphyry
and volcanic sediments. The sample size is standard practice in the WA
Goldfields to ensure representivity
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Page 13 of 20
ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Commentary
Quality of assay data and
laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• The 4m composites and 1m AC and RC samples were assayed by SGS
(Kalgoorlie).
• No geophysical assay tools were used.
• Laboratory QA/QC involves the use of internal lab standards using certified
reference material, blanks, splits and replicates as part of the in-house
procedures. QC results (blanks, duplicates, standards) were in line with
commercial procedures, reproducibility and accuracy.
• Horizon submit Standards (CRM) with the 4m composite samples and
Standards, Blanks and Field Duplicates with the 1m split samples.
• No issues with precision or accuracy have been noted.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g., standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e., lack of bias) and
precision have been established.
Verification of sampling
and assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
• Work was supervised by senior SGS staff experienced in metals assaying.
QC data reports confirming the sample quality are supplied.
• No independent sampling/assay check have been undertaken to date
• No twin holes have been intentionally drilled.
• Data storage as PDF/XLSX files on company PC in Perth office.
• No data was adjusted. First received assays are reported.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Page 14 of 20
ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Commentary
Location of data points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• All drill collar locations were initially pegged and surveyed using a handheld
Garmin GPS, accurate to within 3-5m. The holes are normally accurately
surveyed using an RTK-DGPS system at a later date. Holes were drilled
on a regular spacing as per Table 1 collar details. All reported coordinates
are referenced to a local grid. The topography is flat at the location of the
drilling. Down hole surveys were taken.
• Grid MGA94 Zone 51.
• Topography is very flat, small differences in elevation between drill holes
will have little effect on mineralisation widths on initial interpretation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Holes were variably spaced as detailed in the collar details/coordinates in
Table 1.
• The hole spacing was determined by Horizon to be sufficient when
combined with confirmed historic drilling results to adequately define the
mineralisation in preparation for a JORC Mineral Resource
estimate/update.
Whether sample compositing has been
applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
• Drilling angled or vertical holes in cases is deemed to be appropriate to
intersect the oxide and primary mineralisation and potential residual
dipping structures. Historical holes at Monument were drilled east, this
format was followed to avoid potential interpretative conflicts should we
have drilled holes slightly oblique to this. At Cannon all holes were angled
and used to intersect the dipping ore lodes. The intercept width is likely to
be close (~75%) to the true width however, further drilling and modelling is
typically undertaken.
• The relationship between the drilling orientation and the orientation of
mineralised structures is not considered to have introduced a sampling
bias. Given the style of mineralisation and drill spacing/method, it is the
Page 15 of 20
ASX ANNOUNCEMENT
Criteria
JORC Code explanation
introduced a sampling bias, this should be
assessed and reported if material.
Commentary
most common method for delineating shallow gold resources in Australia.
Sample security
The measures taken to ensure sample
security.
• Samples were collected on site under supervision of the responsible
geologist. The work site is on a destocked pastoral station. Visitors need
permission to visit site. Once co