AGM Presentation
Released
Released
Announcement PDF
Annual
General
Meeting 2025
28 November 2025
Important disclaimers
Nature of Document
This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders,
related bodies, corporate, partners, affiliates, employees, representatives or advisers, make any
representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the
material it contains. Nothing contained in the Presentation is, or may be relied upon, as a promise,
representation or warranty, whether as to the past or the future, and the Company hereby excludes all
warranties that can be excluded by law. The presentation materials have been prepared by the Company as
at 28 November 2025 and statements are current only as at that date.
The Presentation
The presentation contains ‘forward-looking statements’. By their nature, forward-looking statements involve
known and unknown risks, uncertainties and other factors because they relate to events and depend on
circumstances that may or may not occur in the future, and assumptions which may or may not prove to be
correct (and may be beyond the Company’s ability to control or predict), any (or all) of which may cause the
actual results or performance of the Company to be materially different from the results or performance
expressed or implied by such forward-looking statements.
No representation is made that any forward-looking statement will come to pass, that any forecast result will
be achieved, or that any assumption on which a forward-looking statement is based is reasonable. Forward-
looking statements are made as at the date of this Presentation, and the Company disclaims any obligation or
undertaking to release any update of, or revision to, any forward-looking statement contained in this
Presentation. contains information relating to Mineral Resources estimates and Ore Reserves estimates. All
persons reviewing this Presentation should refer to the JORC resource statements and competent person
confirmations in the Appendix to this Presentation (Slide 28).
Professional Advice recommended
All persons reviewing this Presentation should consider seeking appropriate professional advice before
making any investment decision. Neither the provision of the Presentation nor any information contained in the
Presentation or subsequently communicated to any person in connection with the Presentation is, or should
be taken as, constituting the giving of investment advice to any person.
Forward Looking and Cautionary Statement
As noted above, some statements in this Presentation regarding estimates or future events are forward
looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial performance.
Forward looking statements include, but are not limited to, statements preceded by words such as “planned”,
“expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”,
“nominal”, “conceptual” and similar expressions.
Forward looking statements, opinions and estimates included in this Presentation are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and industry
trends, which are based on interpretations of current market conditions. Forward looking statements are
provided as a general guide only and should not be relied on as a guarantee of future performance. Forward
looking statements may be affected by a range of variables that could cause actual results to differ from
estimated results, and may cause the Company’s actual performance and financial results in future periods to
materially differ from any projections of future performance or results expressed or implied by such forward
looking statements. These risks and uncertainties include but are not limited to liabilities inherent in mine
development and production, geological, mining and processing technical problems, the inability to obtain any
additional mine licenses, permits and other regulatory approvals required in connection with mining and third
party processing operations, competition for among other things, capital, acquisition of reserves, undeveloped
lands and skilled personnel, incorrect assessments of the value of acquisitions, changes in commodity prices
and exchange rate, currency and interest fluctuations, various events which could disrupt operations and/or
the transportation of mineral products, including labour stoppages and severe weather conditions, the demand
for and availability of transportation services, the ability to secure adequate financing and management’s
ability to anticipate and manage the foregoing factors and risks. There can be no assurance that forward
looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements. The forward looking statements in this Presentation are based on current
expectations, estimates, forecasts and projections about the Company and the industry in which it operates.
They do, however, relate to future matters and are subject to various inherent risks and uncertainties. Actual
events or results may differ materially from the events or results expressed or implied by any forward looking
statements. The past performance of the Company is no guarantee of future performance. You are cautioned
not to place undue reliance on any forward looking statement. The forward looking statements in this
Presentation reflect views held only as at the date of this Presentation.
None of Horizon Minerals Limited or its directors, officers, employees, agents or contractors makes any
representation or warranty (either expressed or implied) as to the accuracy or likelihood of fulfilment of any
future looking statement, or any events or results expressed or implied in any forward looking statement,
except to the extent required by law. The Company believes that it has a reasonable basis for making the
forward looking statements in the Presentation, including with respect to any production targets and financial
estimates, based on the information contained in this and previous ASX announcements.
Aspirational Statement
The Company’s vision to be a ~100kozpa producer in this presentation are aspirational statements (and not a
production targets) and the Company does not have reasonable grounds to believe this can be achieved.
These statements are of an aspiration nature as the vision to be a ~100kozpa producer is dependent on
several factors including the exploration success, ore reserves and mineral resources definition, feasibility
studies and development of an extended mine plan.
Authorised for release to the ASX by the Board of Directors of Horizon Minerals Ltd.
2
Investment proposition
Currently producing gold and cash flow
through a combination ore purchase and toll
treatment agreements
An attractively priced West Australian gold
developer with near-term growth
Esperance
Albany
Geraldton
Perth
Black Swan Processing Plant
2.2Mtpa (currently in C&M) with pathway
to refurbish / convert to gold processing
Mineral Resource* Estimate
1.8Moz 29.62Mt @ 1.85g/t Au
Regional Landholding
+1,300km²
Projects
3
20.2Moz Ag 104kt Zn
Carnarvon
Undertaking a Pre-Feasibility Study on converting the
wholly owned Black Swan nickel processing plant for gold
production based on an initial +5 year mine plan
Expedited pathway to becoming a standalone, high margin
gold producer in the WA Goldfields
Targeting first gold production at Black Swan by early 2027
Major drilling program underway to better define and extend
mineable ounces from the 1.8Moz MRE and test new regional targets
Kalgoorlie
1.5Mtpa (currently in C&M) with
potential to refurbish / convert
Lake Johnstone Processing Plant
* See Table on page 25.
Horizon Minerals – at a glance
An attractively priced West Australian gold developer with near-term growth
Capital structure Units Current
Share price $/sh 0.073(1)
Ordinary shares M 2,994.7(2)
Options and performance rights M 40.2
Market capitalisation $M 218.6
Cash and cash equivalents $M 34.4(2)
Debt $M 1.7(2)
Enterprise value $M 186
1. As at 27 November 2025.
2. As at 30 September 2025. Excludes listed investments with a value of ~$1.6M.
3. As at 30 June 2025.
4. Commencing January 2026.
Board and Management
Ashok Parekh
Non-Executive Chair
Grant Haywood
Managing Director
Warren Hallam
Non-Executive Director
Brendan Shalders4
Chief Financial Officer
Rob Waugh
Non-Executive Director
Stephen Guy
Chief Geologist
High net worth,
retail and other
4
0
20
40
60
80
100
$0.00
$0.02
$0.04
$0.06
$0.08
$0.10
Oct-24 Dec-24 Feb-25 Apr-25 Jun-25 Aug-25 Oct-25
Million
Volume Price
Golden Crane
Holdings
Directors and
Management
Institutions
Indicative Share Register3
2025 Year in Review
Significant achievements across the business in a transformational year
Operations
Corporate
Growth
Jun 2025
Burbanks –
30,000m drilling
program
commenced
Sep 2024
Warren Hallam
appointed as
NED
Feb 2025
Completion of
Poseidon Nickel
merger
May 2025
Rob Waugh
appointed as
NED
May 2025
Successful $30M
equity raising
Nov 2025
Sale of non-core
Lake Johnston
asset for $35M
Aug 2025
Acquisition of
Gordons Dam
Project
Aug 2024
Boorara – mining
commenced
Jul 2024
Updated Boorara
Ore Reserve
Aug 2024
Phillips Find –
mining
commenced
Dec 2024
Penny’s Find
PFS and maiden
Ore Reserve
Jan 2025
Boorara – first
gold poured
Feb 2025
Phillips Find –
first gold poured
To date
15,401oz
produced1 and
~500kt ore
stockpiled
To date
Phillips Find –
4,954oz produced
and ~210kt ore
stockpiled
Upcoming
Burbanks –
Mineral
Resource
update
Upcoming
Black Swan
PFS nearing
completion
Upcoming
Burbanks
Scoping Study
underway
All elements in place to support aspirational target to become a ~100kozpa producer*
*This is an aspirational statement (and not a production target), the Company does not yet have reasonable ground to believe the vision can be achieved.
Refer to the Aspirational Statements section in the Disclaimers section of this presentation for further information.
1 As of 30 September 2025
5
Our strategy
An attractively priced West Australian gold developer with near-term growth
Late 2026 onwards
Commence gold production at
Black Swan by early 2027
Now
Generate cash flow using third
party plant and infrastructure for
gold production
Next 12 months
Complete Black Swan refurbishment
and conversion for gold processing
All elements in place to support aspirational target to become a ~100kozpa producer*
Production
Growth
Studies
Upgrade and extend Mineral
Resources to support a +5 year
mine plan
Extend initial +5 year mine life
through exploration and
consolidation
Continue to grow Mineral Resources
and drill test new exploration targets
Refurbishment and conversion
studies for Black Swan
Complete studies on potential
Nimbus silver and zinc
production at Black Swan
Improve PFS outcomes through the
inclusion of updated Burbanks MRE
6
*This is an aspirational statement (and not a production target), the Company does not yet have reasonable ground to believe the vision can be achieved.
Refer to the Aspirational Statements section in the Disclaimers section of this presentation for further information.
Standout combination of value and growth
Attractive valuation relative to ASX-listed gold development peers
$521
$324
$299 $295
$235
$226 $225
$194
$183
$169
$139 $138 $136
$117 $113
$61
MEK MI6 MM8 WA8 GG8 BTR AAR MAU AZY AUC GBR HRZ STN MAT PTN HRN
(1) As at 15 October 2025. References contained in Appendices.
Australian gold project developers
market capitalisation / MRE ounce1
7
Portfolio overview
A 1.8Moz Mineral Resource* with processing
infrastructure and growth
* See Table on page 25.
Project portfolio
• Large 1,309km2 land package in an attractive
geological setting centred around Kalgoorlie /
Coolgardie
• Current 1.8Moz Group Mineral Resource*
(29.98Mt @ 1.85g/t AU) with ~50% contained
within the cornerstone Burbanks and Boorara
deposits
• Reinvigorated exploration strategy focused on
defining and extending mineable ounces to
deliver a robust initial 5-year mine plan in the
upcoming PFS
• Acquisition of the 2.2Mtpa Black Swan
processing facility in February 2025 will provide
a standalone processing hub to unlock the
value of the significant resources base
• Additional value and optionality from the
Nimbus silver-zinc deposit (contains 20.2Moz
Ag, 104kt Zn, and 77koz Au) located 44km from
Black Swan
Strategically constructed gold exploration portfolio centered around major geological structures
9
* See Table on page 25.
Boorara Gold Project
Production
• Located 15km east of Kalgoorlie, next to the Super Pit
• Producing gold under a Binding Ore Sale Agreement
(OSA) with the Paddington mill since late 2024
• Treatment to date of 543.7kt for 14,158oz sold,
generating revenue of ~$73.7M (unaudited)1
• Surface ore stockpile of ~320kt1 established
• Current gold price of ~$6,300/oz and ~500kt remains
to be processed under the existing OSA
Pre-Feasibility Study
• Mineral Resource* Estimate after mining depletion of
9.8Mt @ 1.27g/t Au for 398.2koz
• Base load feed for Black Swan in the upcoming PFS
mine plan
• Significantly de-risked project through the current
mining and processing operations
• Potential remains to further extend the deposit
Cash flow and future baseload open pit feed
10
(1) As at 30 September 2025.
* See ASX Announcement "Quarterly Activities Report" dated 30 September 2025.
PRODUCTION
Phillips Find
• Located 45km north-northwest of Coolgardie
• Multiple moderate grade open pit deposits with a combined
Mineral Resource* of 0.59kt @ 2.36g/t Au for 45.2koz
• Low financial risk Joint Venture (JV) with contractor BML
Ventures Pty Limited to fund and manage mining operations
• Approximately 100kt of ore processed at FMR Investments
Greenfields mill under toll milling agreement between the
January and September quarter 2025, generating $25.9M
revenue to the JV1
• 120,000 tonnes of high grade to be processed by a nearby
plant in December 2025, with remaining ore to be treated at
Focus Minerals’ Three Mile Hill plant in January 2026
• Once processing is completed, final JV distributions expected
to be paid early in the March 2026 quarter
Generating cash flow from local toll milling
(1) For full exploration and production details, refer to ASX announcements dated 13 May 2024, 7 August 2024, 31 March 2025 and 29 April 2025, 31 July 2025 and 20 October 2025.
* See Table on page 24. 11
PRODUCTION
Black Swan processing plant
• Comminution circuit suitable for gold processing after
refurbishment and addition of a carbon in leach (CIL) circuit
• Highly capital efficient plan by leveraging existing
infrastructure with estimated replacement value of +$150M
• Processing capacity of up to 2.2Mtpa with plans to initially
operate at a 1.5Mtpa throughput1
• All requisite mining, regulatory and environmental approvals
in place with dedicated grid power and water access
• Several third- party deposits within trucking distance of
Black Swan, along with several prospective greenfields
targets2
• GR Engineering appointed to lead engineering study on the
mill refurbishment and conversion PFS due for completion
in the December quarter 2025
• Conversion retains future ability to process base metal ores
Strategically located concentrator ~40km
north of Kalgoorlie
12
PROCESSING
(1) The 1.5Mtpa is a throughput and should not be construed as a production target, see Disclaimers and Forward- Looking Statements on Slide 2.
(2) There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource
Black Swan process facility
Existing flotation circuit and planned changes to facilitate gold production
Crush Grind
Carbon in leach Elution Gold room Au
Flotation Ag/Zn + Ni
Concentrates
REFURBISHMENT
GOLD CONVERSION
FUTURE REFURBISHMENT
OPTION
13
PROCESSING
Burbanks project
• Located on a granted Mining Lease 9km
south of Coolgardie
• Historic underground mining produced
324koz @ 22.7g/t Au
• Large 465.5koz open pit and high-grade
underground Mineral Resource*
• Significant extension potential with only
30% of the upper 500m mineralised
horizon tested to date1
• Last 10,000m drill program in 2023
added 188koz to the Mineral Resource**
• First results from ~30,000m drilling
program received including 1.55m @
99.6g/t Au and 1m @ 37.2g/t Au2
• Mineral Resource upgrade planned for
2026 before expected inclusion of
Burbanks into the PFS mine plan
High-grade cornerstone asset with 30,000m of infill and extensional drilling well underway
Resource Category Cut-off
Indicated Inferred Total
Mt Au g/t Oz Mt Au g/t Oz Mt Au g/t Oz
Burbanks OP 0.5 1.43 2.00 92,780 3.43 1.90 204,870 4.86 1.90 297,650
Burbanks UG 2.5/2.0 0.12 4.30 16,730 1.07 4.40 151,190 1.19 4.40 167,920
Burbanks Mineral Resource Estimate
GROWTH
14
(1) Refer to Greenstone Resources ASX announcement “Global Gold Resource Increases 57% to 520,134 oz” dated 5 July 2023 for all exploration details and see confirmations on slide 27.
(2) Refer to ASX announcement dated 6 October 2025: “Burbanks Drilling Returning Spectacular Grades”.
* See Table on page 25. ** See ASX announcement (ASX:GRS) titled “High-Grade Intercepts Extends Potential at Burbanks” dated 5 October 2023.
Black Swan exploration potential
• Previous exploration largely targeting nickel sulphide
mineralisation – only 5% of drill assays have tested for gold
• Target areas adjacent to the Mt Monger fault which is
associated with several regional gold mining operations
• Gold prospectivity of the Black Swan area demonstrated
with drill intersections grading up to 6.41g/t Au1
• Wide-spaced soil sampling program completed over the
entire Black Swan tenement package in August 20241
• Numerous gold nuggets located1
• Identified a new 6.5km-long gold trend around Black Swan
• The most coherent anomaly, located at Wilson’s (North
Anomaly), is 1.4km by 1km in size and immediately north of
the existing nickel mines and associated infrastructure
• Initial 2,000m drill program planned for early 2026
Untested gold anomalies emerging adjacent to the process plant infrastructure
15
GROWTH
1. Refer to ASX announcement (ASX:POS) "Gold Potential Builds at Black Swan" dated 24 September 2024.
Nimbus silver-zinc deposit
• Mineral Resource* containing 20.2Moz silver
and 104kt zinc
• High-grade lode containing 6.4Moz silver
(774g/t Ag) and 33kt zinc (12.8% Zn)
• Potential to extend mineralisation along strike
and at depth below 400m
• Located adjacent to the Boorara gold deposit
with shared infrastructure
• Historical production of 3.6Moz of high-grade
silver (352g/t Ag)
• Potential to produce a high-grade silver-zinc
concentrate through the existing Black Swan
flotation circuit
• Further economic studies to maximise future
optionality to be completed
A high-grade silver-zinc VHMS deposit on the edge of Kalgoorlie
16
GROWTH
* See Table on page 26.
Strong pipeline to support Black Swan
Horizon’s 30Mt of existing gold Resources with ~50,000m of drilling budgeted in FY25/261
Greenfields Advanced drilling target
Resource definition &
expansion
Operations
Boorara
Rose Hill
Teal
Coote
Crake Burbanks
Penny’s Find
Wilson’s
Phillips Find
Cannon
Kalpini
Greater Boorara
~480koz
~700koz
~300koz
Black Swan Ni
Nimbus Zn/Ag
Base metal project Notes: (1) Expected to be funded by free cash flows from Boorara and Phillip’s Find. 17
Platform for regional consolidation
• Opportunities for non-producers to access third
party gold processing infrastructure in the WA
Goldfields is becoming increasingly difficult
• Conversion of a 2.2Mtpa processing facility1 to
gold production has potential to unlock
stranded gold resources in the region
• Potential to partner with third parties via joint
venture, toll milling, and ore purchase
arrangements
• Further scope to unlock value through asset
sales or corporate transactions
• Horizon will assess these opportunities to add
mine life which are accretive to Horizon
shareholders
>Several deposits of gold resources in region are without a clear processing solution
18
GROWTH
1. The 2.2Mtpa is the nameplate throughput of the plant and should not be construed as a production target, see Disclaimers and Forward- Looking Statements on Slide 2.
Lake Johnston process plant
• Located 185km southwest of Kalgoorlie
• 1.5Mtpa nickel concentrator and associated infrastructure
amenable to processing lithium or conversion for gold
processing
• Accommodation camp with 200-person capacity and airstrip
• Mining, regulatory and environmental approvals in place
• The only minerals processing facility within +100km with an
estimated +$100M replacement value
• Asset well maintained under care and maintenance program
• Binding Heads of Agreement entered into with Forrestania
Resources Ltd in November 2025 for the divestment of Lake
Johnston for a total consideration of $35 million, consisting of:
• $30 million cash; and
• $5 million of Forrestania fully paid ordinary shares at
completion, targeted for January 2026
Sale of non-core strategic infrastructure for $35M
19
Operational timeline
Indicative timeline of upcoming cash flow and pathway to gold from Black Swan
Target key workstreams
CY 2025 CY 2026 CY 2027
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Boorara gold production
Phillips Find gold production
Additional toll treatment/ore sales
Black Swan conversion studies
Black Swan refurb & conversion work
Mining studies
Black Swan gold processing
20
An Emerging Standalone
Gold Producer
Pre-Feasibility Study and
exploration to establish and
grow a +5 year mine plan
Cash flow generation
from gold produced at
Boorara and Phillips Find
Combination of 1.8Moz of
Mineral Resource* and
processing infrastructure
Balance sheet will
continue to strengthen
and fund growth plans
Credible, low capex plan to
standalone gold
production by early 2027
Ramp up of production
aligned with record gold
prices of $6,300/oz Au
Highly experienced Board
and Management with
strong regional expertise
Attractive current valuation
relative to peers, with growth
and re-rating potential
21
* See Table on page 24.
Contact Us
Grant Haywood
Managing Director and CEO
+61 (08) 9386 9534
admin@horizonminerals.com.au
horizonminerals.com.au
PO Box 1064 West Perth WA 6872
Appendices
Peers Comparison – Reference Table
Company ASX
Contained Au
(Moz)
Resource
Grade (g/t)
Measured
(Mt)
Indicated
(Mt)
Inferred
(Mt)
Stage of Development /
Study Completed
Share Price Shares (M)
Market Cap
($M)
Market Cap /
Cont. Au
Reference
Meeka Metals MEK 1.24 3.0 0.2 8.2 4.7 Scoping Study $0.22 2,922.3 $643 $521 https://api.investi.com.au/api/announcements/mek/673842db-a19.pdf
Minerals 260 MI6 2.30 1.2 0 39.0 21.0 Resource Development $0.36 2,067.3 $744 $324 https://api.investi.com.au/api/announcements/mi6/5a2bb3d1-803.pdf
Medallion Metals MM8 1.10 3.3 0 6.4 3.8 Scoping Study $0.54 613.4 $328 $299 https://wcsecure.weblink.com.au/pdf/MM8/03007527.pdf
Warriedar Resources WA8 1.04 1.6 2.7 4.8 19.8 Resource Development $0.26 1,197.3 $305 $295 https://warriedarresources.com.au/announcements/7069690
Gorilla Gold Ltd GG8 1.22 4.3 0 1.8 7.1 Resource Development $0.45 646.2 $288 $235 https://wcsecure.weblink.com.au/pdf/GG8/03007493.pdf
Brightstar Resources BTR 1.553 1.5 0 6.097 27 Resource Development $0.61 579.3 $350 $226 https://aurumin.com.au/wp-content/uploads/61270636.pdf
Astral Resources AAR 1.76 1.1 0 36.0 14.0 Pre-Feasibility Study $0.28 1,440.2 $396 $225 https://investorhub.astralresources.com.au/announcements/7159459
Magnetic Resources MAU 2.32 1.8 0 29.1 11.6 Feasibility Study $1.52 295.3 $449 $194 https://wcsecure.weblink.com.au/pdf/MAU/02958984.pdf
Antipa Minerals AZY 2.52 1.5 0 32.4 20.7 Scoping Study $0.71 649.7 $458 $182
https://antipaminerals.com.au/upload/documents/investors/asx-
announcements/250909034110_26-09-09-
PMSConferenceInvestorPresentationLowResvforASX.pdf
Ausgold Ltd AUC 2.44 1.1 41.6 21.2 5.9 Definitive Feasibility Study $0.96 430.6 $413 $169 https://api.investi.com.au/api/announcements/auc/bd813021-134.pdf
Great Boulder
Resources
GBR 0.67 2.8 0 3.2 4.3 Scoping Study $0.09 1,040.6 $93 $139 https://wcsecure.weblink.com.au/pdf/GBR/02994064.pdf
Horizon Minerals HRZ 1.82 1.8 1.3 15.8 13.8 Pre-Feasibility Study $0.08 2,994.7 $252 $138
Saturn Metals Ltd STN 2.24 0.5 4.8 107.4 24.8
Preliminary Economic
Assessment
$0.58 529.4 $304 $136
https://saturnmetals.com.au/wp-content/uploads/2025/07/250718-
Apollo-Hill-Gold-Resource-Update-July-2025-2.24Moz.pdf
Matsa Resources MAT 0.95 2.5 0.2 4.1 7.3 Feasibility Study $0.14 820.6 $111 $117 https://api.investi.com.au/api/announcements/mat/9747ee07-715.pdf
Patronus Resources PTN 1.24 1.4 0.4 12.1 12.5 Resource Development $0.10 1,479.3 $141 $113
https://app.sharelinktechnologies.com/announcement-
preview/asx/af596150487f82cd74b76cd766f2e472
Horizon Gold Ltd HRN 2.14 1.5 0 28.2 16.3 Scoping Study $0.77 169.6 $131 $61 https://wcsecure.weblink.com.au/pdf/HRN/02969197.pdf
ASX-listed Gold Developers
Mineral Resource* Estimate
Gold projects
Project
Cutoff Measured Indicated Inferred Total
Au g/t Mt Au g/t Oz Mt Au g/t Oz Mt Au g/t Oz Mt Au g/t Oz
Boorara OP 0.5 0.75 1.21 29,200 6.48 1.28 266,000 2.55 1.26 103,000 9.79 1.27 398,200
Burbanks OP 0.5 - - - 1.43 2.02 92,800 3.43 1.86 204,900 4.86 1.90 297,700
Burbanks UG 2.5/2.0* - - - 0.12 4.26 16,700 1.07 4.39 151,200 1.19 4.38 167,900
Phillips Find OP 0.5 - - - 0.41 2.54 32,700 0.19 2.10 12,500 0.59 2.36 45,200
Phillips Find UG 2 - - - - - - 0.00 2.27 208 0.00 2.27 208
Golden Ridge 1 - - - 0.48 1.82 27,900 0.05 1.71 2,800 0.53 1.81 30,700
Golden Ridge North 0.8 - - - 0.65 1.15 24,300 0.77 1.30 32,300 1.43 1.23 56,600
Cannon UG 1 - - - 0.19 4.80 28,600 0.05 2.28 3,500 0.23 4.29 32,100
Monument 0.5 - - - - - - 0.92 1.11 32,800 0.92 1.11 32,800
Pinner 0.5 - - - 0.06 1.02 2,100 0.27 1.25 10,800 0.33 1.21 12,800
Pennys Find 1.5 - - - 0.31 5.19 51,000 0.12 3.02 12,000 0.43 4.57 63,000
Kalpini 0.8 - - - 1.40 2.41 108,600 0.47 2.03 30,700 1.87 2.31 139,300
Rose Hill UG 2 - - - 0.33 4.49 47,100 0.18 4.78 27,800 0.51 4.60 74,900
Rose Hill OP 0.5 0.19 1.96 12,300 0.09 2.05 6,100 - - - 0.29 1.99 18,300
Jacques-Peyes 0.8 - - - 0.97 2.59 80,700 0.77 1.98 49,200 1.74 2.32 129,800
Teal 1 - - - 1.01 1.96 63,700 0.80 2.50 64,500 1.81 2.20 128,100
Crake 0.8 - - - 1.33 1.47 63,100 0.08 1.27 3,400 1.42 1.46 66,500
Coote 1 - - - - - - 0.42 1.54 21,000 0.42 1.54 21,000
Capricorn 0.5 - - - - - - 0.66 1.20 25,500 0.66 1.20 25,500
Baden Powell 0.5 - - - - - - 0.60 1.20 23,000 0.60 1.20 23,000
Gordons Dam 1.0 - - - - - - 0.36 1.70 20,000 0.36 1.70 20,000
Total 0.95 1 .36 41,500 15.26 1.86 911,200 13.78 1.88 830,700 29.98 1.85 1,783,400
25
*Refer to ASX announcement 29 April 2025, 11 August 2025 and 20 October 2025 and see confirmations on page 27. Horizon confirms that all material assumptions included in the initial announcements dated 29 April
2025, 11 August 2025 and 20 October 2025 continue to apply and have not materially changed.
Ore Reserve* Estimate
Gold projects
Category
Tonnes
(kt)
Au (g/t) Gold Metal (koz)
Proven Reserve – – –
Probable Reserve 135.0 4.1 17.7
Total Reserve 135.0 4.1 17.7
Location Reserve Category
Tonnes
(kt)
Au (g/t) Gold Metal (kOz)
Boorara Open Pit
Proved 382.0 1.23 15.1
Probable 405.3 1.24 16.1
Total 787.3 1.24 31.3
Boorara Ore Reserve
Cannon Ore Reserve
Location Reserve Category
Tonnes
(kt)
Au (g/t) Gold Metal (kOz)
Penny’s Find UG
Proven – – –
Probable 328.3 3.2 33.4
Total 328.3 3.2 33.4
Penny’s Find Ore Reserve
26
* Refer to ASX announcements 29 March 2022, 1 August 2024, 18 December 2024 and 20 October 2025 and see confirmations on page 27. Horizon confirms that all material assumptions included in the initial
announcements dated 29 March 2022, 1 August 2024, 18 December 2024 and 20 October 2025 continue to apply and have not materially changed.
Mineral Resource* Estimate
Nimbus silver-zinc project
Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au)
Category Mt Ag (g/t) Au (g/t) Zn (%) Ag (Moz) Au (kt) Zn (kt)
Measured Resource 3.62 102 0.09 1.2 11.9 10 45
Indicated Resource 3.18 48 0.21 1.0 4.9 21 30
Inferred Resource 5.28 20 0.27 0.5 3.4 46 29
Total Resource 12.08 52 0.20 0.9 20.2 77 104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2,800g/t Ag top cut)
Category Mt Ag (g/t) Zn (%) Ag (Moz) Zn (kt)
Measured Resource - - - - -
Indicated Resource 0.17 762 12.8 4.2 22
Inferred Resource 0.09 797 13.0 2.2 11
Total Resource 0.26 774 12.8 6.4 33
* Refer to ASX announcement 1 August 2024 and see confirmations on page 27. 27
Mineral Resource & Ore Reserve disclosure
Horizon’s Gold Mineral Resources
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted
from and was originally reported in Horizon’s ASX announcements: “Annual Report 2025” 20
October 2025, “Updated Boorara Mineral Resource Delivers a 34% Increase in Gold Grade”
(Boorara) 27 April 2021, “Group Mineral Resource Statement – Amended” (Burbanks, Phillips Find)
1 August 2024, “High Grade Drill results and Resource Update for Rose Hill” (Rose Hill, Golden
Ridge) 4 February 2020, “Maiden Resources for Monument and Golden Ridge North” (Golden
Ridge North) 19 July 2023, “Investor Presentation June 2022” (Cannon) 31 May 2022, “Group
Mineral Resource Statement – Amended” (Monument, Pinner) 1 August 2024, “Pennys Find
Resource Update” (Pennys Find) 29 December 2023, “Kalpini Gold Project Mineral Resource
Update” (Kalpini) 28 September 2021, “Jacques Find - Peyes Farm Mineral Resource update”
(Jaques-Peyes) 15 September 2021, “Intermin’s Mineral Resources Grow 30% to over 560,000
Ounces” (ASX:IRC) (Teal) dated 19 September 2018, “Updated Crake Resource improves in
quality” (Crake) 7 September 2021, “Gold resources increase to
Share your feedback
Discover