20 August 2026
ANNUAL MINERAL RESOURCES AND ORE RESERVES
STATEMENT
Maritana Minerals Limited (ASX: MRT) (“Maritana” or “the Company”) is pleased to announce the Mineral
Resources and Ore Reserves update for the 12 months ended 30 June 2026.
HIGHLIGHTS
• Gold Mineral Resources increase to 1.86Moz, up 6.3% year on year, after mining depletion
• Gold Ore Reserves increase to 204Koz, up 148% year on year1
, after mining depletion
• Non Gold Mineral Resources of:
o 20.2Moz silver, 104kt zinc2
o 293kt nickel and 5,800t cobalt3
• Reserve growth driven by maiden Crake and Kalpini Open Pit Ore Reserves and the updated Boorara
Open Pit Ore Reserve
• Boorara and Burbanks remain the cornerstone assets underpinning the Group's Mineral Resources
and Reserves
• Disciplined portfolio review: reasonable prospects of eventual economic extraction reassessed across
several deposits (Kalpini, Crake, Coote, Golden Ridge North, Jacques-Peyes, Gordons Dam)
• Divestment of the Lake Johnston Nickel Project completed
Managing Director and CEO Mr Grant Haywood commented:
“This year’s statement reflects real growth in both the quality and the confidence of our inventory. Gold Mineral
Resources have increased to 1.86Moz, up 6.3% after mining depletion, and Gold Ore Reserves have
increased to 204Koz, up 148% after depletion — a step change driven by the maiden Crake and Kalpini Open
Pit Ore Reserves and the updated Boorara Open Pit Ore Reserve.
Boorara and Burbanks remain the cornerstone assets of the portfolio, and the growth in Reserves at Boorara
in particular demonstrates the value of continued drilling and mine planning work on our tenure to feed our
100% owned Black Swan Processing Hub (BSPH) infrastructure.
The Company is currently undertaking a further 60,000m drilling program across numerous projects, including
Burbanks, Coote, Crake and Gordon's Dam, to support further resource/reserve upgrades and to assist with
optimising mine planning for the Black Swan Processing Hub, with a Resource update for Burbanks
and Reserve update for Rose Hill also expected soon.
We have also taken a disciplined approach to the balance of the portfolio, reviewing the reasonable prospects
of eventual economic extraction across several gold resources and divesting the Lake Johnston Nickel Project.
Alongside our substantial non-gold Mineral Resources, this leaves Maritana with a focused, growing gold
inventory in the heart of the Western Australian goldfields.”
1
A net decrease of 9,200 ounces has occurred since the “Gold Ore Reserve Update” on 17 February 2026 due to mining depletion of the
Boorara Ore Reserve. See Figure 4
2
Refer ASX Announcement “Nimbus Silver Update” dated 28 August 2024
3
Refer ASX Announcement “Group Mineral Resources Statement – Amended” dated 19 May 2025
Maritanaminerals.com.au Page | 2
Overview
Maritana is pleased to provide an updated Gold Mineral Resource (Table 1, Figure 1) and Reserve (Table
2, Figure 2) Statements respectively for the Company’s gold projects located near Kalgoorlie-Boulder in the
heart of the Western Australian goldfields.
Table 1 - Maritana Gold Mineral Resource Estimate Summary June 2026
Measured Indicated Inferred Total
Project Region
Economic
Interest
kt Au g/t koz kt Au g/t koz kt Au g/t koz kt Au g/t koz
Baden Powell WA 100% 596 1.20 23 596 1.20 23
Boorara WA 100% 498 1.12 18 6,231 1.27 254 2,547 1.26 103 9,276 1.26 375
Boorara SP WA 100% 463 0.95 14 463 0.95 14
Burbanks OP WA 100% 1,430 2.02 93 3,430 1.86 205 4,860 1.90 298
Burbanks UG WA 100% 122 4.26 17 1,070 4.39 151 1,193 4.38 168
Cannon WA 100% 185 4.80 29 47 2.28 3 232 4.29 32
Capricorn WA 100% 659 1.20 25 659 1.20 25
Coote WA 100% 2,321 0.86 64 2,321 0.86 64
Crake WA 100% 1,699 1.29 70 123 1.08 4 1,822 1.28 75
Golden Ridge WA 100% 476 1.82 28 52 1.71 3 527 1.81 31
Golden Ridge North WA 100% 1,511 0.86 42 1,021 1.14 37 2,532 0.97 79
Gordons Dam WA 100% 693 1.24 28 693 1.24 28
Jacques/Peyes WA 100% 996 2.54 81 856 1.85 51 1,852 2.22 132
Kalpini WA 100% 1,768 2.04 116 591 1.72 33 2,359 1.96 149
Monument WA 100% 919 1.11 33 919 1.11 33
Pennys Find WA 100% 305 5.19 51 123 3.02 12 429 4.57 63
Phillips Find OP WA 100% 325 2.41 25 180 2.11 12 505 2.30 37
Phillips Find UG WA 100% 3 2.27 0 3 2.27 0
Pinner WA 100% 64 1.02 2 267 1.25 11 330 1.21 13
Rosehill (OP) WA 100% 194 1.96 12 92 2.05 6 287 1.99 18
Rosehill (UG) WA 100% 326 4.49 47 181 4.78 28 507 4.60 75
Teal WA 100% 1,009 1.96 64 801 2.50 64 1,811 2.20 128
Total 1,156 1.20 44 16,541 1.74 925 16,481 1.68 891 34,178 1.69 1,861
Maritanaminerals.com.au Page | 3
Figure 1 – Maritana Resource Projects
Table 2 - Maritana Gold Ore Reserve Estimate Summary June 2026
Project Proven Probable Total
Region
Economic
Interest kt Au g/t koz kt Au g/t koz kt Au g/t koz
Boorara WA 100% 246.7 1.23 9 1,444 1.40 63 1690 1.36 72
Penny Find WA 100% 328 3.20 33.4 328 3.20 33.4
Cannon UG WA 100% 135 4.10 17.7 135 4.10 17.7
Crake WA 100% 870 1.23 34 870 1.23 34
Kalpini WA 100% 867 1.69 47 867 1.69 47
Grand Total 246.7 1.23 9 3644 1.7 195.1 3890 1.65 204.1
Maritanaminerals.com.au Page | 4
Figure 2 – Maritana Reserve Projects
Material changes to the Company’s Mineral Resources and Reserves include:
o Mining depletion at Boorara and Phillips Find
o The review of the reasonable prospects of economic extraction across several deposits, including
Kalpini, Crake, Coote, Golden Ridge North, Jacques-Peyes and Gordons Dam.
o The divestment of the Lake Johnston Nickel Project
o The inclusion of maiden Ore Reserves during FY26 of Crake and Kalpini Open Pits as well as updates
to the Boorara Open Pit Ore Reserve
Maritanaminerals.com.au Page | 5
GOVERNANCE
Mineral Resource and Ore Reserve estimates contained in this announcement have been prepared and
reported in accordance with the JORC Code (2012). The Company's Mineral Resource and Ore Reserve
estimation and reporting processes are subject to the following internal controls:
Estimates are prepared by suitably qualified personnel, either internal to the Company or via independent
consultants, working under the supervision of the Competent Persons named in this announcement. Where
estimates are prepared by independent consultants those estimates are subject to review by the Company's
internal technical team prior to incorporation into Company reporting.
Material changes to previously reported Mineral Resources and Ore Reserves, including changes arising from
mining depletion, revised cut-off grades or updated geological interpretation, are reviewed by the Resource
Development Manager and Group Mining Engineer before being incorporated into Company reporting.
This announcement has been reviewed by the Board of Directors prior to release, consistent with the
Company's continuous disclosure obligations under the ASX Listing Rules.
MINERAL RESOURCES
Material changes to the Company’s Gold Mineral Resources and Reserves include the mining depletion at
Boorara and Phillips Find and the review of the reasonable prospects of economic extraction across several
deposits, including Kalpini, Crake, Coote, Golden Ridge North, Jacques-Peyes and Gordons Dam. Table 3
compares the 2025 MRE statement to the current, 2026, MRE statement.
Table 3 - Changes to Mineral Resources 2025 – 2026
2025 2026 Change
Project Cut-off Kt Au g/t Koz Cut-off kt Au g/t koz kt Au g/t koz
Baden Powell 0.5 596 1.20 23 0.5 596 1.20 23
Boorara OP 0.5 9,787 1.27 398 0.5 9,276 1.26 375 -0.5% -2% -2%
Boorara SP 463 0.95 14
Burbanks OP 0.5 4,860 1.90 298 0.5 4,860 1.90 298
Burbanks UG 2.5/2.0 1,193 4.38 168 2.5/2.0 1,193 4.38 168
Cannon UG 1 232 4.29 32 1 232 4.29 32
Capricorn 0.5 659 1.20 25 0.5 659 1.20 25
Coote 1 425 1.54 21 0.5 2,321 0.86 64 447% -44% 207%
Crake 0.8 1,417 1.46 66 0.5 1,822 1.28 75 29% -13% 12%
Golden Ridge 1 527 1.81 31 1 527 1.81 31
Golden Ridge North 0.8 1,427 1.23 57 0.5 2,532 0.97 79 77% -21% 40%
Gordons Dam 0.5 693 1.24 28
Jacques-Peyes 0.8 1,742 2.32 130 0.5 1,852 2.22 132 6% -4% 2%
Kalpini 0.8 1,872 2.31 139 0.5 2,359 1.96 149 26% -15% 7%
Monument 0.5 919 1.11 33 0.5 919 1.11 33
Pennys Find 1.5 429 4.57 63 2 429 4.57 63.0
Phillips Find OP 0.5 595 2.36 45 0.5 505 2.30 37 -15% -3% -17%
Phillips Find UG 2 3 2.27 0.2 2 3 2.27 0
Pinner 0.5 330 1.21 13 0.5 330 1.21 13
Rose Hill OP 0.5 287 1.99 18 0.5 287 1.99 18
Maritanaminerals.com.au Page | 6
Rose Hill UG 2 507 4.60 75 1.5 507 4.60 75
Teal 1 1,811 2.20 128 1 1,811 2.20 128
Total 29,618 1.85 1,764 34,642 1.68 1,875 17% -9% 6.3%
Depleted Resources
Boorara
The Boorara Mineral Resource Estimate (MRE) was undertaken in 2021 and reported as “Updated Boorara
Mineral Resource Delivers a 34% Increase in Gold Grade” dated 27 April 2021.
The Boorara Mineral resource was most recently reported in the “Gold Mineral Resources Update” dated 13
February 2026. This resource was depleted to 30 June 2026.
The Mineral Resource Estimate for Boorara was depleted for mining to June 2026 by intersection of the 2021
resource block model (min_210723_dep_final.fbm) with the June 2026 end of month pit shells. A depletion of
1.25 Mt of mineralised material containing 53 koz of gold at a 0.5 g/t Au reporting cutoff was applied. The
Boorara in-situ MRE now contains 9.28 Mt containing 375 koz of gold (Table 4).
Table 4 – Boorara in-situ MRE 1/07/2021 – Depleted for Mining to EOM June 2026 – 0.5 g/t Au reporting cutoff
Measured Indicated Inferred Total
Material kt Au (g/t) Koz kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 5,266 1.28 217 2,225 1.28 92 320 1.14 12 7,811 1.28 320
Transition 136 1.42 6 33 1.06 1 7 0.95 0 176 1.34 8
Fresh 829 1.16 31 289 1.09 10 171 1.10 6 1,290 1.14 47
Grand Total 6,231 1.27 254 2,547 1.26 103 498 1.12 18 9,276 1.26 375
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Boorara Stockpiles
On June 30, 2026, eight stockpiles of mineralised material remain at Boorara. The stockpiles make up 463 kt
of Measured Resource grading 0.95 g/t Au for 14,000 ounces of gold (Table 5).
Table 5 – Boorara Stockpiles – Measured Resource
Stockpile Material Tonnes Au ( g/t) Au Ounces
HG01- BOSP0024 Trans 43,795 1.28 1,802
HG04-BOSP0020 Trans 46,029 1.03 1,524
HG05-BOSP0017 Oxide 26,292 0.89 752
HG06-BOSP0025 Trans 29,408 1.24 1,172
HG07-BOSP0021 Trans 36,889 1.12 1,328
HG09 Oxide 76,949 1.20 2,969
LG04 Trans 142,292 0.60 2,745
MG01 Trans 61,749 0.95 1,886
Grand Total 463,403 0.95 14,179
Maritanaminerals.com.au Page | 7
Phillips Find
The Phillips Find MRE was undertaken in June 2022 for Greenstone Resources (GSR). After acquisition of
GSR, Maritana reported the Phillips Find mineral resource in the “Group Mineral Resource Statement –
Amended” dated 1 August 2024.
The Phillips Find Mineral resource was most recently reported in “Gold Mineral Resources Update”, dated 13
February 2026. This resource was depleted to 30 June 2025.
The Mineral Resource Estimate for Phillips Find was depleted for mining to June 2026 by intersection of the
2022 resource block model (phillipsfind_mre_june_2022.mdl) with the June 2026 end of month pit shells. A
depletion of 216 kt at 2.35 g/t Au for 17 koz Au above a cutoff of 0.5 g/t Au was reported.
The Phillips Find remaining open pit mineral resource is 505 kt at 2.3 g/t Au for 35 koz. The underground MRE
remains the same at 208 ounces of gold.
Table 6 – Philips Find Open Pit MRE June 2022 – Depleted for Mining to EOM June 2026 – 0.5 g/t Au reporting
cutoff
Indicated Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 267 2.52 22 154 2.25 11 421 2.42 33
Transition 1.1 1.63 0.1 8 1.41 0.4 9 1.43 0.4
Fresh 57 1.90 3 18 1.30 1 75 1.76 4
Grand Total 325 2.41 25 180 2.11 12 505 2.30 37
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Updated Resources
Over the last three years the price of gold has increased substantially. The consequence of this is more lower
grade deposits are becoming economic to mine. Work commissioned by Maritana as part of the Black Swan
feasibility study is confirming that projects can be mined at a lower cutoff grade than previously applied.
Recommendations from MRE reviews have been to lower the reporting cutoff grades and review the original
interpretations with the objective of incorporating lower grade mineralisation in the modelling.
The Company has re-reported Mineral Resource Estimates completed between 2021 and 2023 at a revised
cutoff grade of 0.5 g/t Au, compared with the previously reported cutoff grade of 0.8 g/t Au. The results of this
adjustment were reported in “Gold Mineral Resources Update” dated 13 February 2026.
The Company confirms that no new information or data has been identified that materially affects the
information included in the original market announcement. All material assumptions and technical parameters
underpinning the Mineral Resource Estimates in those announcements continue to apply and have not
materially changed for the deposits below.
Crake
The Crake MRE was originally reported as “Updated Crake Resource improves in quality” (Crake) 7 September
2021. Re-reporting of the model (crake_mre_august_2021_final.mdl) at a 0.5 g/t Au cutoff increases tonnes
by 28% and contained ounces of gold by 12% (Table 7 and Table 8).
Maritanaminerals.com.au Page | 8
Table 7 – Crake MRE 21/09/2021 – 0.8 g/t Au reporting cutoff
Indicated Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 69 1.45 3.2 69 1.45 3.2
Transition 195 1.47 9.2 1 1.22 0.03 195 1.47 9.2
Fresh 1,070 1.47 50.7 82 1.27 3.3 1,152 1.46 54.0
Total 1,334 1.47 63.1 82 1.27 3.4 1,417 1.46 66.5
Table 8 – Crake MRE 21/09/2021 – 0.5 g/t Au reporting cutoff
Indicated Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 1,363 1.29 57 123 1.08 4 1,485 1.28 61
Transition 85 1.25 3 85 1.25 3
Fresh 252 1.27 10 252 1.27 10
Total 1,699 1.29 70 123 1.08 4 1,822 1.28 75
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Coote
The Coote MRE was originally reported as “Gold resources increase to 1.24 moz” (Coote, Capricorn, Baden
Powell) dated 28 September 2022. The Coote deposit has a large volume of mineralised material between
0.5 g/t Au and 1.0 g/t Au as illustrated in Figure 3. Consequently, reporting the 2022 model
(coote_09_2022.mdl) at a 0.5 g/t Au results in a 5-fold increase in tonnes and a 300% increase in ounces.
Figure 3 - Grade Tonnage Curve - Coote MRE
Maritanaminerals.com.au Page | 9
Table 9 – Coote Project – Inferred Resource by Material Type – 1.0 g/t Au cutoff
Inferred Total
Material Kt Au (g/t) koz kt Au (g/t) koz
Oxide 68 1.80 4 68 1.80 4
Transition 38 1.41 2 38 1.41 2
Fresh 320 1.50 15 320 1.50 15
Total 425 1.54 21 425 1.54 21
Table 10 – Coote Project – Inferred Resource by Material Type – 0.5 g/t Au Cutoff
Coote Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz
Oxide 212 1.04 7 212 1.04 7
Transition 338 0.77 8 338 0.77 8
Fresh 1,771 0.86 49 1,771 0.86 49
Total 2,321 0.86 64 2,321 0.86 64
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Golden Ridge North
The Golden Ridge North MRE was originally reported as “Maiden Resources for Monument and Golden Ridge
North” (Golden Ridge North) dated 19 July 2023. Re-reporting the Golden Ridge North model (gr_2023.mdl)
at a 0.5 g/t Au cutoff results in 230% more tonnes and 41% more ounces (Table 12).
Table 11 – Golden Ridge North MRE 2/08/2023 – 0.8 g/t Au reporting cutoff
Indicated Inferred Total
kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 38 0.99 1 47 1.12 2 84 1.06 3
Transition 166 1.18 6 184 1.39 8 350 1.29 15
Fresh 450 1.16 17 543 1.28 22 993 1.23 39
Total 653 1.15 24 774 1.30 32 1,427 1.23 57
Table 12 – Golden Ridge North MRE 2/08/2023 – 0.5 g/t Au reporting cutoff
Indicated Inferred Total
kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 112 0.76 3 72 0.96 2 184 0.84 5
Transition 388 0.87 11 253 1.19 10 641 1.00 21
Fresh 1,011 0.87 28 696 1.14 26 1,707 0.98 54
Total 1,511 0.86 42 1,021 1.14 37 2,532 0.97 79
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Maritanaminerals.com.au Page | 10
Kalpini
The Kalpini deposit was originally reported as “Kalpini Gold Project Mineral Resource Update” (Kalpini) dated
28 September 2021.
During the 2021 interpretation, 80 additional 1.0 m samples were selected for assay, bringing the total available
assays in the dataset to 79,234. In 2022 a MRE update was undertaken to include these samples. The new
interpretation also revised some lode orientations. Overall, these enhancements made a small but not material
increase to the resource of 1.4% in ounces.
Table 13 reports the MRE from the 2021 modelling. Table 14 reports the MRE from the 2022 model (kp_2022_04.mdl) at
a 0.5 g/t Au cutoff grade. The update is an increase of 9,000 ounces of gold (6%).
Table 13 – Kalpini Mineral Resource (MRE 28/09/2021) at a 0.8 g/t Au cutoff
Indicated Inferred Total
kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 28 1.78 2 5 1.40 0 33 1.71 2
Transition 205 1.83 12 18 1.17 1 223 1.77 13
Fresh 1,168 2.55 95 448 2.08 30 1,616 2.40 125
Total 1,401 2.41 109 472 2.03 31 1,872 2.31 139
Table 14 – Kalpini Mineral Resource (MRE 01/06/2022) at a 0.5 g/t Au cutoff
Indicated Inferred Total
kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 32 1.48 2 7 1.31 0 39 1.45 2
Transition 298 1.48 14 28 1.02 1 326 1.44 15
Fresh 1,439 2.17 100 556 1.76 31 1,994 2.06 132
Total 1,768 2.04 116 591 1.72 33 2,359 1.96 149
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Jacques-Peyes
The Jacques-Peyes MRE comprise the adjacent but not contiguous deposits of Jacques Find and Peyes Farm.
The MRE was originally reported as “Jacques Find- Peyes Farm Mineral Resource update” (Jaques-Peyes)
dated 15 September 2021 (Table 15).
Reporting of Jacques-Peyes at a 0.5 g/t Au cutoff results a 6% increase in tonnes and a 2% increase in
contained ounces (Table 16).
Maritanaminerals.com.au Page | 11
Table 15 – Jacques Find and Peyes Farm Mineral Resources at a 0.8 g/t Au cutoff
Indicated Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 146 2.00 9 87 1.54 4 233 1.83 14
Transition 90 2.88 8 44 1.78 3 134 2.52 11
Fresh 732 2.67 63 643 2.05 42 1,375 2.38 105
Total 968 2.59 81 774 1.98 49 1,742 2.32 130
Table 16 – Jacques Find and Peyes Farm Mineral Resources at a 0.5 g/t Au cutoff
Indicated Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 155 1.93 10 111 1.35 5 266 1.69 14
Transition 95 2.75 8 58 1.51 3 154 2.28 11
Fresh 746 2.63 63 687 1.96 43 1,433 2.31 107
Total 996 2.54 81 856 1.85 51 1,852 2.22 132
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Gordons Dam
The recently acquired Gordons Dam project includes a MRE reported by Maritana as “Acquisition of Projects
Near Black Swan Including Gordons Dam Project - Amended” (Gordons Dam) dated 11 August 2025.
The original MRE was completed by BMGS for Yandal Resources in 2023 and reported at a 0.8 g/t Au cutoff from the
model gordons_dam_bm_2303.mdl (Table 17). Reporting this model at a 0.5 g/t cutoff gives a 100% increase in tonnes
and a 42% increase in ounces of gold (
Table 18).
Table 17 – Gordons Dam MRE March 2023 0.8 g/t Au cutoff
Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz
Oxide 148 1.95 9 148 1.95 9
Transition 152 1.49 7 152 1.49 7
Fresh 65 1.52 3 65 1.52 3
Total 365 1.68 20 365 1.68 20
Table 18 – Gordons Dam MRE March 2023 0.5 g/t Au cutoff
Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz
Oxide 212 1.59 11 212 1.59 11
Transition 286 1.16 11 286 1.16 11
Fresh 195 0.99 6 195 0.99 6
Total 693 1.25 28 693 1.25 28
Maritanaminerals.com.au Page | 12
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
No Material Change
Maritana Minerals confirms that for all other reported Mineral Resources no new information or data has been
identified, as at 30 June 2026, that materially affects the information included in the original market
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
Estimates in those announcements continue to apply and have not materially changed.
o Baden Powell
o Burbanks OP
o Burbanks UG
o Cannon
o Capricorn
o Golden Ridge
o Monument
o Rosehill (OP)
o Rosehill (UG)
o Pinner
o Pennys Find
o Teal
ORE RESERVES
Figure 4 – Ore Reserves June 2025 vs June 2026
Depleted Ore Reserves
Boorara
The Boorara Ore Reserve (OR) was undertaken in 2025 and titled “Gold Ore Reserve Update” dated 17
February 2026.
Maritanaminerals.com.au Page | 13
The Ore Reserve Estimate for Boorara was depleted for mining to June 2026 by intersection of the 2021
resource block model (min_210723_dep_final.fbm) with the June 2026 end of month pit shells. The Boorara
Ore Reserve Estimate now contains 1.69 Mt containing 72 koz of gold (Table 4).
Table 19 – Boorara Ore Reserve 1/07/2021 – Depleted for Mining to EOM June 2026 – 0.5 g/t Au reporting cutoff
Proven Probable Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 6.4 1.0 0.2 44.4 1.1 1.5 50.8 1.0 1.7
Transition 144.0 1.1 5.3 296.3 1.1 10.9 440.2 1.0 16.2
Fresh 96.2 0.7 3.6 1104.0 1.4 50.3 1200.2 1.0 53.9
Grand Total 246.7 1.1 9.1 1440.6 1.4 62.7 1691.2 1.0 72.0
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Table 20 – Changes to Ore Reserves 2025 – 2026
2025 2026 Overall Change
Project kt Au g/t koz kt Au g/t koz kt Au g/t koz
Boorara OP4
787.3 1.24 31.2 1,690 1.0 72.0 115% 10% 131%
Pennys Find5
328.0 3.20 33.4 328 3. 33.4 0% 0% 0%
Cannon UG4
135.0 4.10 17.7 135 4.1 17.7 0% 0% 0%
Crake3
- - - 870 1.2 34.0 100% 100% 100%
Kalpini3
- - - 867 1.7 47.0 100% 100% 100%
Total 1,250.0 2.06 82.0 3,890.0 1.65 204.0 211% -21% 148%
Gold Resource and Ore Reserve Disclosures
Pursuant to ASX listing rule 5.8.1, and in addition to the information contained in the attached JORC Code
tables, the Company provides the following details in respect of the Mineral Resources and Ore Reserves that
have had material changes in FY2026.
Detail for Mineral Resources of Kalpini, Crake, Coote, Golden Ridge North, Jacques-Peyes and Gordons Dam
has been previously disclosed in the MRT ASX announcement “Gold Mineral Resources Update”, dated 13
February 2026.
Detail for Ore Reserves of Kalpini, Crake, and Boorara has been previously disclosed in the MRT ASX
announcement “Gold Ore Reserve Update” dated 17 February 2026. Since then, the Ore Reserve has been
depleted at Boorara by 9.2 kilo ounces.
After mining depletion at Boorara, the current Ore Reserve is 72,000 ounces (Table 22). All other technical
parameters at Boorara3
remain unchanged (Table 1, Section 4).
4
Refer to “Gold Ore Reserve Update” dated 17 February 2026
5
Refer to “Annual report reference Penny's Find Pre- Feasibility Study and Ore Reserve” (Penny’s Find) dated 18 December 2024 and
“Positive Results for Cannon Underground Gold Project and Feasibility Study Update” (Cannon) dated 29 March 2022
Maritanaminerals.com.au Page | 14
Details for Pennys Find and Cannon has been previously disclosed in the MRT ASX announcement Penny's
Find Pre- Feasibility Study and Ore Reserve” (Penny’s Find) dated 18 December 2024 and “Positive Results
for Cannon Underground Gold Project and Feasibility Study Update”, (ASX:MRT) (Cannon) dated 29 March
2022.
Boorara
Overview
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the Super Pit,
and 1 km southwest of the Nimbus Silver-Zinc Project site where established offices are connected to mains
power and existing water supplies.
Geology and Mineralisation Interpretation
Boorara is hosted within the Boorara Shear Zone (BSZ), a major tectonic feature of the Kalgoorlie Terrane. At
Boorara the BSZ contains a number of ultramafic, mafic-volcanic and sedimentary units. The host Boorara
Dolerite package has a 4 km strike length, and consists of layers of pyroxenite, dolerite and granophyric
coarse-grained quartz dolerites. The package is at its widest in the northern area (500 m) due to intercalated
dolerite, high magnesian basalt (komatiite) and sediment units. The central and southern parts of the project
generally lack the internal komatiites and sediments and averages less than 60 m width.
The local geology has been extensively mapped and relogged by Dr Gerard Tripp and forms the basis for the
compilation of a 3D geological model for the Boorara deposit and the construct of mineralisation domains.
Additionally, the vein analysis provides significant support for the grade continuity analysis.
Due to the change in deposit characteristics along its strike length, the Boorara deposit is divided into three
areas; Regal, Crown Jewel and Royal.
The Regal mineralisation is dominantly hosted in stockworks within quartz dolerites or on the margins of
sedimentary units. These consist of moderately NE dipping veins within steeply dipping zones.
The Crown Jewel area has mineralisation within a moderately north-east dipping zone within the quartz
dolerite. This is a continuation of the Royal (southern stockwork) style of mineralisation, but with a narrower
zone of quartz dolerite and shallower dip.
The Royal area presents as well-developed steeply north-east dipping zones containing high frequency vein
arrays developed proximal to shears at the upper and lower contacts of the dolerite unit.
Drilling Techniques
The deposit was sampled using Reverse Circulation (“RC”), Diamond drillholes (“DDH”) and Grade Control
RC (“GCRC”) on spacings ranging from 4 m x 10 m and 4 m x 4 m (vertical) at Royal, nominally 4 m x 10 m
(vertical) at Crown Jewel and 5 m x 10 m (angled) at Regal. The exploration/resource development drilling
patterns were typically spaced at 10-20 m x 20 m but can extend out to >100 m spacing where deeper. An
approximate total of 337 RC holes, 50 DDH holes and 812 GCRC holes were drilled for 133,695 m, 8537 m
and 22,978 m respectively. Other types of sampling such as trenches, Aircore and RAB drilling were not used
in the Mineral Resource Estimate.
Sampling Techniques
Reverse Circulation drilling was used to obtain 1 m samples from which approximately 1.5-2 kg was pulverised
to produce a 50g charge for fire assay. RC chips were geologically logged. Diamond Core was logged and
sampled by cutting PQ, HQ, NQ2 core along the orientation line and submitting the half core for assay. Sample
intervals were determined by the supervising geologist.
Maritanaminerals.com.au Page | 15
Sampling Analyses Method
Samples were assayed for Au ppm only for this program. Assays were determined by 50g fire assay with AAS
finish samples grading >5 g/t were repeat assayed and if a sample exceeded 100 g/t or coarse gold is
suspected then a screen fire assay (Au-SCR22AA) has been undertaken on those samples and those results
reported instead of the fire assay result. Detection limits are typically accurate to 0.01 g/t Au.
Estimation Methodology
Mineralisation was domained as two mineralisation sets (termed the “Contact” Lodes and “Flat” Lodes) which
were then estimated as separate block models that were then joined together for the final model. The Contact
Lode mineralisation model relates to the vein stockworks contained within steeply dipping granophyric
dolerites. The Flat lode mineralisation relates to sheeted extensional quartz vein arrays that are developed
between the contact lodes at Regal, and mainly on the footwall side of the Crown Jewel and Royal deposits.
These models were estimated separately, and the Contact lodes were overprinted onto the Flat Lode
mineralisation model.
In terms of the interpretation process where Flat lode Mineralisation domains crosscut the Contact domains
the samples were used to form the wireframes and the composites are used to inform both models. The tenor
of the mineralisation is very similar for both domains so is not considered to be an issue likely to cause over-
estimation issues in the model.
Grades were composited to 1 m downhole constrained within the mineralised domains. To avoid loss of data
from small ‘residuals’ at the end of a composite (i.e., small intervals that might otherwise be excluded), a “best
fit” compositing routine that divided each mineralised intercept into equal lengths that was as close as possible
to 1 m was chosen.
High grade results within the deposit were capped by analysing histograms, log histograms, log probability
plots and spatial analysis of individual high grades. Top cuts for the Contact Lodes were selected on a lode-
by-lode basis and top cuts for the Flat Lodes were selected on a domain grouping basis. Top cuts varied
between 8 g/t and 43 g/t gold. Low grade subdomains within the Contact Lodes were all top cut to 2 g/t gold.
Top cuts were applied to composites prior to estimation.
Flat lode model:
Flat lode domains were grouped into seven orientation domains and variography was undertaken. The Regal
flat Lodes (88 domains) were individually estimated by ordinary kriging dynamic anisotropy, using hard domain
boundaries. The search ellipse for the Regal Lodes was aligned to the local orientation of the mineralised trend
of each domain using dynamic anisotropy. The Crown Jewel and Royal Lodes were estimated as a group,
using ordinary kriging with a search ellipse flattened across strike to force a strong anisotropic search. Flat
lodes were estimated into a parent block of 10 m (Y) x 10 m (X) x 5 m (Z) with sub celling to 1 m (X,Y,Z).
Contact lode model:
Categorical indicator variography was completed for each of the Contact lodes using dynamic anisotropy to
control the search at a 0.25 g/t gold Indicator. This estimation was used to define the low grade subdomains.
Variography was undertaken on the flat lode high grade sub-domains which were individually estimated by
ordinary kriging