ASX ANNOUNCEMENT
31 MARCH 2025
GOLD MINING AND PROCESSING UPDATE
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to provide an update
on the development of the Phillips Find (“Phillips Find”) and Boorara (“Boorara”) Gold Projects.
HIGHLIGHTS
New Toll Treatment Agreement for processing Phillips Find ore
•
Completion of processing of the first 37,000t of ore from the Phillips Find JV with BML
Ventures Pty Ltd (BML) under the 200,000t Toll Milling Agreement with FMR Investments Pty
Ltd (FMR) to treat Horizon ore from February to June 2025 at the Greenfields Mill 1
•
First ore parcel from Phillips Find consisted of 37,624 dry tonnes at 1.46g/t for 1,675.3oz at
an average price of $4,728/oz, generating ~$7.9M to the Phillips Find JV
•
An additional 80,000t of ore from Phillips Find will be processed at the Greenfields Mill in
both April and June in addition to approximately 80,000t of ore to be processes from Boorara
to complete the Toll Processing Agreement with FMR.
•
A New Toll Milling Agreement executed to treat 70,000t of ore from Phillips Find in
September/October 2025 to be processed at Focus Minerals Limited’s (Focus) Three Mile
Hill processing plant
•
Grade control drilling completed at Phillips Find and has resulted in a revised schedule where
the final 70,000t ore mined in the current campaign is treated at Three Mile Hill
Mining, haulage and processing progressing well at Boorara
•
Proceeds received from the processing of the first 50,604t of Boorara ore under the Ore Sale
Agreement with Norton Gold Fields’ Paddington Mill for the processing of total of 1.24Mt of
Boorara ore 2
•
First ore stockpile from Boorara was 50,604 dry tonnes at 0.791g/t for 1,163 oz sold at an
average gold price of $4,256/oz, generating ~$4.951M in revenue
•
The second ore parcel is currently being processed at Paddington with a third parcel is in the
process of being hauled. More than 100,000t of high-grade ore is currently stockpiled on the
Boorara ROM pad, allowing for the additional campaigns to be processed at the Greenfields
Mill in April and June
•
Boorara is now operating at steady state ore production
Commenting on the mining progress, Managing Director and CEO Mr Grant Haywood said: 3
“Following on from our first gold pour for Boorara in January, we have now built up significant ore
stockpiles, with mining now in steady state operation and in a position for the continuous processing
of ore and cashflow generation which will continue well into 2026. We are also pleased to secure a
new toll treatment agreement with Focus Minerals which aligns with the revised mining schedule at
Phillips Find and allows us to increase our overall gold production from Boorara. As gold production
ramps up in the June quarter we expect to commence a steady cash build from our dual mining and
haulage operations.”
As announced to the ASX on 13 May 2024. 2 As announced to the ASX on 1 August 2024, 3 See Forward Looking and Cautionary
Statements on Page 7. 4 As announced to the ASX on 12 September 2024.
1
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon is pleased to provide an update on the development and operations at its 100% owned
Boorara and Phillips Find Gold Projects, located approximately 15km east of Kalgoorlie-Boulder and
45km north-west of Coolgardie respectively, in the heart of the Western Australian goldfields (Figure
1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Phillips Find
Mining has been undertaken at Phillips Find by Joint Venture partner BML since October 2024.
Operations commenced with the development of the Newhaven pit followed by mining of the
Newminster pit that commenced in December 2024.
Several drilling campaigns have now been completed, including two RC grade control programs, one
diamond core program and four deep RC holes targeting mineralisation towards the base of each pit.
Internal grade control drilling (typically 8m x 5m) has been completed for both the Newhaven and
Newminster pits utilising information from these most recent campaigns to add to previous models.
The outcomes have shown some reduction in tonnage at Newhaven and an increase at Newminster,
however the ore is deeper than originally modelled. Overall, 192kt of ore is planned to be mined at
Page 2 of 7
ASX ANNOUNCEMENT
Phillips Find, however due to the deeper ore at Newminster, additional time to mine the ore is required
than estimated in the original mining schedule.
The additional timeframe has pushed out the milling schedule for the remaining 70,000t of Phillips
Find ore to September/October 2025 which is beyond the current agreement with the Greenfields
Mill. The JV partners have therefore negotiated an additional 70kt of ore to be treated at the Three
Mile Hill plant near Coolgardie WA. Overall project economics are expected to be improved relative
to the original plan, with the higher gold price significantly offsetting additional mining costs.
The first ore treatment campaign has been completed at Greenfields mill with the final reconciliation
being completed and the gold being sold as per the table below. Throughput rates and grade through
the mill have been in general alignment with expectations, with excellent metallurgical recovery at
94.8%.
HG Ore
Stockpile
1
Tonnes
(t)
37,624
Grade
(g/t)
1.46
Recovered
Ounces (oz)
1,675.3
Gold Price
A$/oz
4,728
Revenue
Received to JV (A$)
7,920,900
Status
Completed
Boorara
Mining at Boorara has continued from Pit 2 (North) and Pit 4 (South) with ~130kt of high-grade ore
stocks currently on the Boorara and/or Paddington ROM pads, and ~95kt of lower-grade ore
stockpiled at Boorara. The second parcel of high grade is being processed at Paddington, with the
third parcel being hauled, and the fourth ready to be hauled. A number of other stockpiles are live
and being built. In addition to the ROM stocks, there are approximately 50kt of blasted high grade
ore stocks in Pits 2 and 4. As anticipated, grades are improving with depth.
There was a hiatus in ore haulage between ore parcel 1 and 2 whilst mining was undertaken through
lower grade zones in the pits and as a result of time delays with the grade determination and the
payment process, however mining of high-grade ore is now in steady state and continuous ore
haulage and processing is expected to continue to Paddington.
HG Ore
Stockpile
1
Tonnes
(t)
50,604
Grade
(g/t)
0.791
Recovered
Ounces (oz)
1,163
Gold Price
A$/oz
4,256
Revenue
Received (A$)
4,951,117
Status
Completed
2
24,281
0.794
-
-
-
Being processed
3
20,609
0.986
-
-
-
Hauling to mill
4
29,614
0.947
-
-
-
Ready to haul
5-8
81,000
0.98*
Building stockpiles
* Indicates mine claimed grade, not grade determined via stockpile drilling and assays. Stockpiles as of 6am
28 March 2025.
By arranging the additional toll milling capacity at Three Mile Hill, 80kt of milling capacity has been
freed up at the Greenfields Mill (40kt in April and 40kt in June). Based on the strong progress of
mining at Boorara and stockpiled material Horizon is also planning to treat additional economic ore
from Boorara, likely to be lower grade material not previously planned for processing which will still
generate strong cashflows at the current gold price.
Page 3 of 7
ASX ANNOUNCEMENT
Next Steps 1
The next campaign of ore treatment at FMR’s Greenfields mill is scheduled to commence on 9 April
2025 and will comprise approximately 40kt of Boorara ore and 40kt of Phillips Find ore. A similar
split of Boorara and Phillips Find ore is scheduled to be processed in June 2025 which will complete
Horizon’s current 200kt Toll Treatment Agreement with FMR.
The remaining 70kt of Phillips Find ore shall be processed through September/October 2025 at
Focus Minerals’ Three Mile Hill plant.
Processing of ore at Paddington from Boorara has now reached steady state and is expected to be
continuous.
A further mining and processing update is expected in the Company’s March Quarterly Report.
Figure 2: Ore Stockpiles on West ROM at Boorara
1
See Forward Looking and Cautionary Statements on Page 7.
Page 4 of 7
ASX ANNOUNCEMENT
Figure 3: Loading ore at Boorara to transport to the Paddington Mill
Figure 4: Mining the Newhaven pit at Phillips Find
Page 5 of 7
ASX ANNOUNCEMENT
Figure 5: Mining the Newminster pit at Phillips Find
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 6 of 7
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results, and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological, mining
and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations,
competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled
personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations
and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate
financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in
the announcement, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Page 7 of 7