Quarterly Activities Report 31 March 2025
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
30 APRIL 2025
QUARTERLY ACTIVITIES REPORT FOR THE
PERIOD ENDED 31 MARCH 2025
HIGHLIGHTS
•
First gold pour from Boorara under the ore sale agreement with the Paddington Mill. 1
o
•
First ore stockpile from Boorara was 50,604 dry tonnes at 0.791g/t for 1,163oz
sold at an average gold price of $4,256/oz, generating ~$4.951M in revenue
First gold pour from Phillips Find and processing of the first parcel of gold ore through the
Greenfields Mill near Coolgardie under a toll milling agreement. 2, 3
o
First ore parcel consisted of 37,624 dry tonnes at 1.46g/t for 1,675oz at an average
price of $4,728/oz, generating ~$7.9M to the Phillips Find JV
•
Safe, steady state production continued at both Boorara and Phillips Find to build a
pipeline of ore stockpiles for processing under processing agreements.
•
The merger with Poseidon Nickel Limited was completed during the quarter, bringing in
assets with key infrastructure including the Black Swan processing plant. 4
•
Toll Milling Agreement executed to treat 70,000t of ore from Phillips Find in
September/October 2025 at Focus Minerals’ Three Mile Hill processing plant. 5
•
Addition of key operating personnel to lead growth and progress the Company’s
ambitions of being a relevant standalone gold producer. 6
JUNE QUARTER ACTIVITIES
•
Continued safe gold production and revenue from Boorara and Phillips Find via the
existing ore sale and toll milling agreements.
•
Commencement of the Burbanks resource extension drilling programme.
•
Generation of exploration target pipeline.
•
GR Engineering Services to commence engineering studies work program to support the
refurbishment and repurposing of the Black Swan processing plant for gold production.
•
Commencement of mining studies to generate a Life of Mine plan to feed the Black Swan
processing plant.
1 As announced to the ASX on 15 January 2025.
2 As announced to the ASX on 12 February 2025.
3 As announced to the ASX on 26 February 2025.
4 As announced to the ASX on 19 February 2025
5 As announced to the ASX on 31 March 2025.
6 As announced to the ASX on 10 March 2025.
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
HRZ QUARTERLY MAR 2025
OVERVIEW
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to provide the March
2025 Quarterly Activities Report. Horizon is a gold production and exploration company within
the Kalgoorlie and Coolgardie regions of Western Australia (Figure 1).
Horizon Minerals key objective is near term gold production and exploration upside within our
large tenement package of 1,309km2. In addition to 1.8Moz of gold resources, the Company
holds a number of multi-commodity assets including the Nimbus silver-zinc project.
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Activities during the quarter focussed on delivering steady state production from the Company’s
Boorara gold operation, located east of Kalgoorlie, and through the Phillips Find gold project to
the north-northwest of Coolgardie. First gold pour was achieved from both Boorara and Phillips
Find through separate milling agreements with Paddington Mill and FMR Investments’
Greenfields Mill respectively.
Work commenced on the Burbanks drilling programme scheduled for the June quarter, as well
as generating a long-term exploration target pipeline and increasing exploration personnel. There
was minimal emphasis on in-ground exploration drilling during the quarter as resources and
expenditure remained focussed on establishing steady state production and saleable ore
stockpiles at Boorara and Phillips Find and generating cashflow for the Company.
Page 2 of 24
HRZ QUARTERLY MAR 2025
MINE DEVELOPMENT AND OPERATIONS
The Company is successfully executing its strategy of bringing its extensive gold assets into
production and generate strong cashflows in current times of record high gold prices with its
Boorara and Phillips Find Gold Projects both achieving steady state production, and first delivery
of Phillips Find ore to the Greenfields Mill for processing and first gold pour. 7
Boorara Gold Project
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1km southwest of the Nimbus Silver-Zinc Project site where established offices
are connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
The Mineral Resource Estimate (JORC 2012) for Boorara is shown in Table 1 below:
Table 1: Boorara Mineral Resource Estimate 8
Boorara at 0.5 g/t lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
Measured
Resource category
1.12
1.22
Gold Metal (Oz)
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
The Ore Reserve for Boorara is shown in Table 2 below
Table 2: Boorara Ore Reserve 9
Location
Boorara Open Pit
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
The Company is not aware of any new information or data that materially affects the information
presented and that the material assumptions and technical parameters underpinning the Boorara
Ore Reserve Study continue to apply and have not materially changed.
During the quarter ore haulage to the Paddington Gold Mill continued with the first ore stockpile
from Boorara of 50,604 dry tonnes at 0.791g/t for 1,163oz sold at an average gold price of
$4,256/oz, generating ~$4.951M in revenue.7 Boorara is now mining in a steady state of
production and continuous ore haulage and processing is expected to continue to the Paddington
Mill (Figure 2).
In addition to the ore treated to generate first gold in January 2025, by the end of the quarter the
Company had generated an additional ~130kt of high-grade ore stocks on the Boorara and/or
7
As announced to the ASX on 31 March 2025.
8 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
9 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
Page 3 of 24
HRZ QUARTERLY MAR 2025
Paddington ROM pads, plus ~95kt of lower-grade ore stockpiled at Boorara. There was a hiatus
in ore haulage between ore parcel 1 and 2 whilst mining was undertaken through lower grade
zones in the pits and as a result of time delays with the grade determination and the payment
process which drew down cash reserves, however mining of high-grade ore is now in steady
state and continuous ore haulage and processing is expected to continue to Paddington to
provide continuous cashflows.
Figure 2: Loading ore at Boorara to transport to the Paddington Mill
Phillips Find Project
The project is centred 45km north-northwest of Coolgardie (Figure 1) covering over 10km strike
of prospective greenstone stratigraphy, and includes the Phillips Find Mining Centre (PFMC)
where approximately 33,000oz of gold was produced between 1998 and 2015 from three open‐
pit operations; Bacchus Gift, Newhaven and Newminster.
Under the Joint Venture (JV) Agreement between Horizon Minerals and BML Ventures Pty
Limited (BML), all management, technical, operational and maintenance roles will be undertaken
by BML with oversight by the Company. This is a low financial risk JV structure with BML to fund
all project costs. Net cashflow after the asset recovery and repayment of costs to be split 50/50
between Horizon and BML. This allows Horizon to focus 100% on delivering its Boorara gold
project.
During the March 2025 quarter, steady state production has been achieved from the Newhaven
and Newminster open pits (Figures 3 and 4) as well as completion of processing of the first
37,000t of ore from the Phillips Find JV with BML under the 200,000t Toll Milling Agreement with
FMR Investments Pty Ltd (FMR) to treat Horizon ore from February to June 2025 at the
Greenfields Mill. The first ore parcel from Phillips Find consisted of 37,624 dry tonnes at 1.46g/t
for 1,675oz at an average price of $4,728/oz, generating ~$7.9M to the Phillips Find JV. 7
Several drilling campaigns have now been completed, including an internal grade control drilling
(typically 8m x 5m) has been completed for both the Newhaven and Newminster pits utilising
information from these most recent campaigns to add to previous models. Drilling outcomes
Page 4 of 24
HRZ QUARTERLY MAR 2025
indicate some reduction in tonnage at Newhaven and an increase at Newminster, however the
ore is deeper than originally modelled. Due to the deeper ore at Newminster, additional time to
mine the ore is required than estimated in the original mining schedule. 7
The additional timeframe has pushed out the milling schedule for the remaining 70,000t of Phillips
Find ore to September/October 2025 which is beyond the current agreement with the Greenfields
Mill.
The JV partners have therefore negotiated an additional 70kt of ore to be treated at the Three
Mile Hill plant near Coolgardie. Overall project economics are expected to be improved relative
to the original plan, with the higher gold price significantly offsetting additional mining costs.7
The additional processing agreement at Three Mile Hill for processing Phillips Find ore has
created an additional 80,000 tonnes of processing capacity at the Greenfields mill which can be
used for Horizon ore during the June 2025 quarter.
Figure 3: Mining the Newhaven pit at Phillips Find
Page 5 of 24
HRZ QUARTERLY MAR 2025
Figure 4: Mining the Newminster pit at Phillips Find
EXPLORATION AND EVALUATION
During the quarter, minimal emphasis was placed on in ground exploration drilling, as resources
and expenditures focused on activities aimed at putting assets into production and generating
cash flow for the Company. Programme planning and resourcing commenced during the quarter
for the next stage of drilling at the Company’s Burbanks gold project south of Coolgardie (Figure
1) as well as commencement of a long-term exploration target generation pipeline to achieve
Horizon Minerals overall vision and strategy of becoming an emerging standalone gold producer.
ACQUISITIONS AND DIVESTMENTS
Horizon and Poseidon Nickel Limited (ASX: POS) (Poseidon) have completed the merger
between the two companies by way of Schemes of Arrangement under the Corporations Act
2001 (Cth), whereby Horizon acquired 100% of the fully paid ordinary shares in Poseidon (Share
Scheme) and 100% of the unlisted Poseidon options (Options Scheme, and together with the
Share Scheme, the Schemes).
The transaction has consolidated Horizon’s large gold resource and Poseidon’s Black Swan
processing infrastructure in the Kalgoorlie-Coolgardie-Lake Johnston districts. The combination
provides a pathway for sustainable, long-term gold production and cashflow as an independent
mid-cap producer
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
The Company recognises the importance of Environment, Social and Governance (ESG) factors
and is committed to continuous improvement in this regard. During the quarter, a review
continued of all internal policies, procedures, and governance principles to identify improvements
and opportunities to ensure we meet or exceed our corporate license to operate.
Page 6 of 24
HRZ QUARTERLY MAR 2025
The Company previously worked with BDO Global to conduct an analysis of the business to
identify opportunities to improve the Company’s ESG performance. Materiality surveys were
completed for both internal and external stakeholders and completed a workshop to map the
opportunities and generate an initial sustainability report. The aim of the process is to develop
systems and processes to ensure we meet or exceed our social license to operate and adopt the
sustainability report covering current and future activities.
CORPORATE / FINANCE
Horizon Minerals made two key executive appointments during the quarter to progress the
Company’s operational growth plans. Ms Adrianna Skok-Muir was appointed Group Mining
Engineer to manage the Life of Mine plan Feasibility Study to provide ore to the Black Swan
processing plant. Mr Dirk Richards was appointed as Project Manager with the key responsibility
to manage the refurbishment and repurpose of the Black Swan processing plant into a gold plant.
Total cash at bank as at 31 March 2025 was A$6.0 million. In addition, the Company holds
investments in ASX listed companies with a current value of approximately A$3.1 million (Table
7). The Company sold the last tranche of its listed investment in Ora Banda Mining Limited,
selling 1,063,094 shares for proceeds of $975k. During the quarter, the Company completed a
two tranche private placement of $9.625 million in cash from Golden Crane Holdings Limited to
support the Company’s existing and further project development and potentially for the retiring
or refinancing of debt. 10
As previously announced to the ASX on 19 October 2022 and 23 November 2022, the Company
executed financial agreements with Nebari LLC for a US$5 million Convertible Loan Facility in
two tranches of US$2 million and US$3 million respectively. Both tranches have been drawn
down. For further information and terms of the Loan Agreement, we refer you to the ASX
announcement dated 19 October 2022.
10 As announced to the ASX on 10 January 2025 and see Forward-looking and Cautionary Statement on Page 26.
Page 7 of 24
HRZ QUARTERLY MAR 2025
In accordance with ASX Listing Rule 5.3.5, $28k was paid to related parties or their associates
during the quarter, comprising Non-Executive Director fees and superannuation.
Table 3: Issued Share Capital
Code
HRZ
Issued at 31
March 2025
2,140,259,626
Class of securities
Fully Paid Ordinary Shares
HRZOB Listed Options
(exercise price 9.7c, expiry 30 Jun 2025)
51,871,015
HRZO
(exercise price 8.7c, expiry 21 Sep 2025)
26,723,171
HRAZO Unlisted Options (exercise price 5.19c, expiry 3 Sep 2026)
18,057,025
HRZAN
26,004,600
Listed Options
Director & Employee Performance Rights
Table 4: Listed Company Investments
Company
Number
Value at 31 March 2025
Richmond Vanadium Technology
19,958,992
1
$2,594,669
Metal Hawk Limited
1,134,430 1
$465,116
Dundas Minerals Limited
3,234,327 1
$84,093
TOTAL
1.
$3,143,878
Liquid asset
This quarterly report has been authorised by the board of directors for release.
Julian Tambyrajah
CFO & Company Secretary
30 April 2025
For further information contact Horizon on:
T: + 61 8 9386 9534
Page 8 of 24
HRZ QUARTERLY MAR 2025
APPENDICES
TENEMENT SCHEDULE – MARCH 2025
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
L26/261
100%
-
-
M26/346
100%
-
-
M26/499
100%
-
-
M26/549
100%
-
-
M26/621
100%
-
-
P26/4256
100%
-
-
P26/4579
100%
-
-
P26/4580
100%
-
-
MLA26/855
100%
-
-
PLA26/4318
100%
-
-
E26/220
100%
-
-
P24/5143
100%
-
-
P24/5144
100%
-
-
P24/5145
100%
-
-
P24/5146
100%
-
-
P24/5147
100%
-
-
P24/5148
100%
-
-
P24/5149
100%
-
-
P24/5150
100%
-
-
P24/5151
100%
-
-
P24/5152
100%
-
-
P24/5153
100%
-
-
P24/5154
100%
-
-
P24/5155
100%
-
-
P24/5156
100%
-
-
P24/5157
100%
-
-
P24/5158
100%
-
-
P24/5159
100%
-
-
P24/5160
100%
-
-
P24/5348
100%
-
-
P24/5415
100%
-
-
P24/5637
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BINDULI
BLACK FLAG
Page 9 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P24/5638
100%
-
-
P24/5639
100%
-
-
P24/5640
100%
-
-
E70/5980
100%
-
-
E70/5981
100%
-
-
E70/6551
100%
-
-
ELA70/6552
100%
-
-
ELA70/6553
100%
-
-
E70/6554
100%
-
-
ELA70/6555
100%
-
-
E25/349
100%
-
-
E25/543
100%
-
-
E25/564
100%
-
-
L25/48
100%
-
-
L25/50
100%
-
-
L25/51
100%
-
-
M25/182
100%
-
-
M25/327
100%
-
-
M25/329
100%
-
-
M25/330
100%
-
-
M25/333
100%
-
-
M25/357
100%
-
-
P25/2449
100%
-
-
P25/2633
100%
-
-
P25/2670
100%
-
-
P25/2733
100%
-
-
P25/2748
100%
-
-
P25/2755
100%
-
-
P25/2761
100%
-
-
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BLACK FLAG
BRIDGETOWN-GREENBUSHES
CANNON GOLD MINE
CHADWIN
P16/3121
Page 10 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Prospect/Tenement
Notes
Percentage interest
held at the end of
the quarter
Percentage interest
Percentage
acquired during
interest disposed
the quarter
during the quarter
WESTERN AUSTRALIA
COOLGARDIE
E16/589
100%
-
-
E16/590
100%
-
-
E16/591
100%
-
-
E16/592
100%
-
-
LA15/429
100%
-
-
LA15/430
100%
-
-
M26/41
100%
-
-
M26/433
100%
-
-
M26/534
100%
-
-
L27/88
100%
-
-
M27/485
100%
-
-
P26/4156
-
-
100%
P26/4535
100%
-
-
P27/2380
100%
-
-
P27/2381
100%
-
-
G27/1
100%
-
-
L27/90
100%
-
-
L27/91
100%
-
-
L27/92
100%
-
-
L27/93
100%
-
-
M27/156
100%
-
-
M15/1204
100%
-
-
M15/652
100%
-
-
P15/6380
100%
-
-
GOLDEN RIDGE (NIMBUS)
KALPINI
KANOWNA BELLE (NIMBUS)
PENNY’S FIND
ROSE HILL
Page 11 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E26/209
100%
-
-
P26/4316
100%
-
-
P26/4317
100%
-
-
P26/4319
100%
-
-
P26/4320
100%
-
-
P26/4321
100%
-
-
P26/4322
100%
-
-
P26/4323
100%
-
-
P26/4324
100%
-
-
P26/4325
100%
-
-
P26/4326
100%
-
-
P26/4327
100%
-
-
P26/4328
100%
-
-
P26/4329
100%
-
-
P26/4330
100%
-
-
P26/4331
100%
-
-
P26/4332
100%
-
-
P26/4333
100%
-
-
P26/4334
100%
-
-
P26/4335
100%
-
-
P26/4336
100%
-
-
P26/4337
100%
-
-
P26/4338
100%
-
-
P26/4339
100%
-
-
P26/4340
100%
-
-
P26/4341
100%
-
-
P26/4342
100%
-
-
P26/4343
100%
-
-
P26/4344
100%
-
-
P26/4345
100%
-
-
P26/4350
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
LAKEWOOD
Page 12 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
100%
-
-
100%
-
-
-
-
100%
M24/919
100%
-
-
M24/959
100%
-
-
P24/4817
100%
-
-
P24/5046
100%
-
-
P24/5464
100%
-
-
P24/5507
100%
-
-
P24/5508
100%
-
-
MLA24/1004
100%
-
-
E15/1655
100%
-
-
E16/494
100%
-
-
E16/497
100%
-
-
E16/503
100%
-
-
E16/506
100%
-
-
E16/507
100%
-
-
E16/510
100%
-
-
E16/519
100%
-
-
E16/521
100%
-
-
E16/525
100%
-
-
E16/526
100%
-
-
P16/3212
100%
-
-
P16/3213
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
WHITE FLAG
E26/168
M26/616
P26/4079
1
WINDANYA
YARMANY
YARMANY
Page 13 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E25/511
100%
-
-
L25/32
100%
-
-
L25/35
100%
-
-
L25/36
100%
-
-
L26/240
100%
-
-
L26/252
100%
-
-
L26/266
100%
-
-
L26/270
100%
-
-
L26/274
100%
-
-
L26/275
100%
-
-
M25/355
100%
-
-
M26/29
100%
-
-
M26/161
100%
-
-
M26/277
100%
-
-
M26/318
100%
-
-
M26/490
100%
-
-
M26/598
100%
-
-
P25/2393
-
-
100%
P25/2394
-
-
100%
P25/2403
100%
-
-
P25/2404
100%
-
-
P25/2405
100%
-
-
P25/2450
100%
-
-
P25/2469
100%
-
-
P25/2470
100%
-
-
P25/2471
100%
-
-
P25/2472
100%
-
-
P25/2473
100%
-
-
P25/2474
100%
-
-
P25/2475
100%
-
-
P25/2526
100%
-
-
P25/2551
100%
-
-
P25/2552
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
Page 14 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P25/2643
100%
-
-
P25/2644
100%
-
-
P25/2645
100%
-
-
P25/2646
100%
-
-
P25/2647
100%
-
-
P25/2697
100%
-
-
P25/2732
100%
-
-
P26/4199
100%
-
-
P26/4204
100%
-
-
P26/4205
100%
-
-
P26/4206
100%
-
-
P26/4207
100%
-
-
P26/4208
100%
-
-
P26/4299
100%
-
-
P26/4300
100%
-
-
P26/4301
100%
-
-
P26/4302
100%
-
-
P26/4381
100%
-
-
P26/4382
100%
-
-
P26/4383
100%
-
-
P26/4384
100%
-
-
P26/4385
100%
-
-
P26/4386
100%
-
-
P26/4405
100%
-
-
P26/4431
100%
-
-
P26/4432
100%
-
-
P26/4505
100%
-
-
P26/4509
100%
-
-
P26/4510
100%
-
-
P26/4518
100%
-
-
P26/4582
100%
-
-
P27/2265
100%
-
-
P27/2266
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
Page 15 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P27/2267
100%
-
-
P27/2269
100%
-
-
P27/2429
100%
-
-
P27/2466
100%
-
-
P27/2467
100%
-
-
M15/161
100%
-
-
M15/731
100%
-
-
MLA15/1845
100%
-
-
P15/5249
100%
-
-
P15/5412
100%
-
-
P15/6314
100%
-
-
P15/6381
100%
-
-
P15/6382
100%
-
-
PLA15/6417
100%
-
-
PLA15/6549
100%
-
-
P15/6757
100%
-
-
P15/6774
100%
-
-
P15/6775
100%
-
-
100%
-
-
M16/130
100%
-
-
M16/133
100%
-
-
M16/168
100%
-
-
M16/171
100%
-
-
M16/242
100%
-
-
M16/258
100%
-
-
M16/550
100%
-
-
MLA16/556
100%
-
-
MLA16/597
100%
100%
-
P16/2985
100%
-
-
P16/2986
100%
-
-
P16/2987
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
BURBANKS
PHOENIX
2
2
M15/119
PHILLIPS FIND
2
Page 16 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P16/2988
100%
-
-
P16/2998
100%
-
-
P16/2999
100%
-
-
P16/3037
100%
-
-
P16/3038
100%
-
-
P16/3039
100%
-
-
P16/3040
100%
-
-
P16/3041
100%
-
-
P16/3042
100%
-
-
P16/3043
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
PHILLIPS FIND
2
P16/3084
3
85%
-
-
P16/3085
3
85%
-
-
P16/3086
3
85%
-
-
P16/3087
3
85%
-
-
P16/3088
100%
-
-
P16/3358
100%
-
-
PLA16/3525
100%
100%
-
100%
100%
-
G27/2
100%
100%
-
L24/219
100%
100%
-
L24/222
100%
100%
-
L27/57
100%
100%
-
L27/58
100%
100%
-
L27/59
100%
100%
-
L27/74
100%
100%
-
L27/75
100%
100%
-
L27/77
100%
100%
-
L27/78
100%
100%
-
L27/95
100%
100%
-
L27/96
100%
100%
-
M27/200
100%
100%
-
M27/214
100%
100%
-
M27/216
100%
100%
-
M27/39
100%
100%
-
BLACK SWAN
4
Page 17 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Prospect/Tenement
Notes
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
WESTERN AUSTRALIA
LAKE JOHNSTON
4
E63/2244
5
80%
80%
-
E63/2256
5
80%
80%
-
G63/5
100%
100%
-
G63/8
100%
100%
-
L63/51
100%
100%
-
L63/52
100%
100%
-
L63/55
100%
100%
-
L63/57
100%
100%
-
M63/163
100%
100%
-
M63/282
100%
100%
-
M63/283
100%
100%
-
M63/284
100%
100%
-
M63/292
100%
100%
-
M63/293
100%
100%
-
M63/294
100%
100%
-
M63/522
100%
100%
-
M63/523
100%
100%
-
M63/524
100%
100%
-
100%
100%
-
G38/21
100%
100%
-
L38/118
100%
100%
-
L38/119
100%
100%
-
L38/220
100%
100%
-
L38/121
100%
100%
-
L38/122
100%
100%
-
L38/199
100%
100%
-
L38/218
100%
100%
-
L38/225
100%
100%
-
L39/184
100%
100%
-
L39/221
100%
100%
-
L39/224
100%
100%
-
M261SA
100%
100%
-
M38/1244
100%
100%
-
M38/1245
100%
100%
-
M39/1075
100%
100%
-
WINDARRA
4
Page 18 of 24
HRZ QUARTERLY MAR 2025
TENEMENT SCHEDULE – MARCH 2025 continued
Prospect/Tenement
Notes
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
JOINT VENTURES
WESTERN AUSTRALIA
YARMANY – GOLD TIGER RESOURCES (AUS) LIMITED
E16/492
6
25%
-
-
E16/499
6
25%
-
-
MT THIRSTY – CONICO LTD (FORMERLY AUSTRALIAN COBALT LTD)
E63/1267
7
50%
-
-
E63/1790
7
50%
-
-
GLA63/9
7
50%
-
-
L63/80
7
50%
-
-
L63/81
7
50%
-
-
L63/91
7
50%
-
-
MLA63/669
7
50%
-
-
P63/2045
7
50%
-
-
R63/4
7
50%
-
-
80%
80%
-
LAKE JOHNSTON – ESSENTIAL METALS
E63/1784
8
Notes
(1)
Royalty of A$1 per tonne of ore mined and treated from M26/616 is payable to Pamela Jean Buchhorn.
(2)
On 18 June 2024, Horizon implemented the merger with Greenstone Resources Limited. The transaction
brought Greenstone’s complementary assets over to Horizon as listed in the above tenement schedule.
(3)
Hayes Mining Pty Ltd own 15% interest in P16/3084 to P16/3087.
(4)
On 19 February 2025, Horizon implemented the merger with Poseidon Nickel Limited. The transaction brought
Poseidon’s complementary assets over to Horizon as listed in the above tenement schedule.
(5)
In December 2023, Poseidon entered into a farm-in agreement with Mantis Resources to earn-in up to 100%
ownership interest in the two tenements which are close proximity to the Lake Johnston Project.
(6)
An earn-in JV whereby Gold Tiger Resources (Australia) Limited can earn 90% over 4 stages (4 years) by
spending A$300,000 and paying Horizon A$120,000 non-refundable cash amounts. Gold Tiger Resources
(AUS) Limited has earned a 75% interest, leaving Horizon with a 25% interest.
(7)
The Mt Thirsty Cobalt-Nickel-Manganese Project is a large laterite hosted resource, held in a 50:50 joint venture
by Horizon (formerly Greenstone Resources) and Conico Ltd (ASX:CNJ). Conico Ltd is the Joint Venture
manager. The Project is located 16km from the historic mining town of Norseman, Western Australia. 150km
to the north lies Kalgoorlie, the epicentre of the West Australian mining industry and 195km to the south is the
port of Esperance. Access to the site is primarily via the sealed Coolgardie–Esperance Highway, which runs
north-south from Esperance to Kalgoorlie.
(8)
E63/1784 is a joint venture between Poseidon (80%) and Essential Metals Limited (20%), Essential Metals has
been acquired by Develop Global Limited.
Page 19 of 24
HRZ QUARTERLY MAR 2025
Horizon Minerals Limited – Summary of Gold Mineral Resources
Cutoff
Measured
Indicated
Inferred
Au
ppm
Mt
Au
ppm
Ounces
Mt
Au
ppm
Ounces
Mt
Au
ppm
Ounces
Boorara OP
0.5
1.12
1.22
43,700
6.85
1.28
281,100
2.56
1.26
Burbanks OP
0.5
1.43
2.02
92,800
3.43
Burbanks UG
2.5/2.0
0.12
4.26
16,700
Phillips Find OP
0.5
0.54
2.40
41,700
Phillips Find UG
2
Golden Ridge
1
0.48
1.82
Golden Ridge
North
0.8
0.65
Cannon UG
1
0.19
Monument
0.5
Pinner
0.5
0.06
1.02
Pennys Find
1.5
0.31
Kalpini
0.8
Rose Hill UG
2
Rose Hill OP
0.5
Jacques-Peyes
Project
Total
Mt
Au
ppm
Ounces
103,500
10.53
1.27
428,300
1.86
204,900
4.86
1.90
297,700
1.07
4.39
151,200
1.19
4.38
167,900
0.19
2.09
12,700
0.73
2.32
54,400
0.00
2.27
208
0.00
2.27
208
27,900
0.05
1.71
2,800
0.53
1.81
30,700
1.15
24,300
0.77
1.30
32,300
1.43
1.23
56,600
4.80
28,600
0.05
2.28
3,500
0.23
4.29
32,100
0.92
1.11
32,800
0.92
1.11
32,800
2,100
0.27
1.25
10,800
0.33
1.21
12,800
5.19
51,000
0.12
3.02
12,000
0.43
4.57
63,000
1.40
2.41
108,600
0.47
2.03
30,700
1.87
2.31
139,300
0.33
4.49
47,100
0.18
4.78
27,800
0.51
4.60
74,900
0.09
2.05
6,100
0.29
1.99
18,300
0.8
0.97
2.59
80,700
0.77
1.98
49,200
1.74
2.32
129,800
Teal
1
1.01
1.96
63,700
0.80
2.50
64,500
1.81
2.20
128,100
Crake
0.8
1.33
1.47
63,100
0.08
1.27
3,400
1.42
1.46
66,500
Coote
1
0.42
1.54
21,000
0.42
1.54
21,000
Capricorn
0.5
0.66
1.20
25,500
0.66
1.20
25,500
Baden Powell
0.5
0.60
1.20
23,000
0.60
1.20
23,000
13.43
1.88
811,600
30.49
1.84
1,802,900
Total
0.19
1.31
1.96
1.33
12,300
55,900
15.75
1.85
935,300
Confirmation
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted
from and was originally reported in Horizon’s ASX announcements:
•
•
•
•
•
•
•
•
•
“Updated Boorara Mineral Resource Delivers a 34% Increase in Gold Grade” (Boorara)
27 April 2021,
Group Mineral Resource Statement – Amended”,”. (Burbanks, Phillips Find) 1 August
2024,
“High Grade Drill results and Resource Update for Rose Hill”, (Rose Hill, Golden Ridge)
4 February 2020,
“Maiden Resources for Monument and Golden Ridge North” (Golden Ridge North), 19
July 2023,
“Investor Presentation June 2022”, (Cannon) 31 May 2022,
“Group Mineral Resource Statement – Amended”,”. (Monument, Pinner) 1 August 2024,
“Pennys Find Resource Update”, (Pennys Find) 29 December 2023,
“Kalpini Gold Project Mineral Resource Update” (Kalpini) 28 September 2021,
“Jacques Find- Peyes Farm Miner
Share your feedback