ASX ANNOUNCEMENT
17 February 2026
GOLD ORE RESERVE UPDATE
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to announce an updated gold
Ore Reserve Estimate for the Company’s projects located near Kalgoorlie-Boulder in the heart of the Western
Australian goldfields (Figure 1)
HIGHLIGHTS
• Gold Ore Reserve Estimate of 4.3 million Tonnes at 1.54 g/t for 214 koz1
• The total change in the Global Ore Reserve is a 160%, or 131,615 oz, increase in contained gold to
the FY2025 Ore Reserve
• Boorara Re-Optimisation and Pre-Feasibility update at A$4,500 Gold Price has been completed
generating positive economic results
• Maiden Ore Reserve and Pre-Feasibility for Crake and Kalpini Open Pit Mineral Resources optimised
at A$4,500 Gold Price.
• All future ore processing will be through the Black Swan Project Processing Hub (BSPH)
• Additional Resource conversions from the broader project pipeline anticipated over the next 12 months
The Pre-Feasibility Studies (PFS) for Boorara, Crake and Kalpini include dilution analysis, open pit
optimisation, design, production scheduling, and a cash-flow assessment. The studies were undertaken by
Mining Plus Pty Ltd and approved for release by the competent person. The results indicate positive project
value excluding any capital related to the BSP processing hub. The completion of studies for neighbouring
deposits in conjunction with this study will support capital costs and capacity of the proposed 2.2Mtpa BSP
processing hub and pave the way for a mining development pipeline aimed at sustained gold production and
continuous cashflows.
HORIZON MINERALS GOLD ORE RESERVE SUMMARY1
Proven Probable Total
kt Au g/t kOz kt Au g/t kOz kt Au g/t kOz
Total 450 1.10 16 3,879 1.59 198 4,330 1.54 214
Managing Director and CEO Mr Grant Haywood commented:
“Our updated Ore Reserve Estimate underpins a reliable source of mill feed for our BSPH Project which marks
an important step forward in strengthening the long-term future for the operation. The improved confidence in
our reserve base reflects the quality of the orebodies, the success of our technical team, and our commitment
to disciplined resource conversion. With this reserve update, and scoping study, we are well positioned to
deliver consistent production and meet our aspirational target of 100,000 ounces of gold production per
annum2
.”
1
See Table 10 – “Horizon Minerals Gold Mineral Reserve Summary”
2
This is an aspirational statement (and not a production target), the Company does not yet have reasonable grounds to believe the vision
can be achieved. Refer to the Aspirational Statements section in the Disclaimers section of this announcement
horizonminerals.com.au Page | 2
Figure 1 – Horizon Gold Projects
Boorara
Project Summary
Horizon is continuing to mine the Boorara Gold deposit located in the Goldfields of Western Australia (WA).
The Ore from the Boorara project has most recently been processed at the Paddington Mill. The Boorara site
is located 56 km east of Kalgoorlie and 63 km from the BSP processing hub (Figure 1).
Table 1 – Boorara Mineral Resource Estimate3
1/07/2021 – Depleted for Mining to EOM June 2025 – 0.5 g/t Au reporting cutoff
Boorara Measured Indicated Inferred Total
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 11 1.14 0.4 139 1.43 6 33 1.06 1 183 1.34 8
Transition 317 1.22 12 1,053 1.22 41 292 1.09 10 1,662 1.20 64
Fresh 424 1.20 16 5,293 1.28 218 2,225 1.28 92 7,942 1.28 326
Total 753 1.21 29 6,485 1.28 266 2,549 1.26 103 9,787 1.27 398
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
The Boorara project is divided into the Royal (Southern), Crown Jewel (Central), and Regal (Northern) deposits
and hosts Gold Mineralisation in quartz vein arrays within quartz dolerite. The PFS completed by Mining Plus
assumes that ore will be treated at the BSP processing hub.
3
Refer ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026
horizonminerals.com.au Page | 3
Updated Ore Reserve
Horizon has recently conducted a review of the Ore Reserve and Mineral Resource taking into account the
increased gold price.
The Mineral Resource block model was released on 13th
February 2026 with an Au cut-off grade of 0.5 g/t Au
(Table 1).
Recent PFS studies commissioned by Horizon Minerals and conducted by Mining Plus Pty Ltd (Mining Plus)
have resulted in the Boorara Ore Reserve being re-optimised at a higher gold price of A$4,500/oz.
The Mineral Resource model was depleted with survey data as at the end of August 2025 using topography
and constrained by the final optimised pit design. The pits were designed in four stages to optimise cashflow
and strip ratios.
To determine the optimum selective mining unit size (SMU) for Boorara, changes to ore tonnes and ounces for
various SMU sizes were compared against the resource model. The block size was increased to maintain a
practical mining width and used for the regularisation of the resource model.
The PFS has successfully depleted, re-optimised, re-designed and scheduled the Boorara project to mine and
process a base case of 1.0 Mtpa using the most recent Boorara mining costs. The study provided a mining
cost estimate for the base schedule and incorporated the processing of ore at Horizon Minerals’ BSP
processing hub. Inputs to the optimisation and cash flow analysis are indicated in Table 3. Horizon Minerals'
has licencing and permitting in place and a favourable relationship with the local first-nations people at Boorara.
Environmental baseline studies have been completed. The result of the study indicated a positive cash flow
and net present value (NPV), confirming the Boorara August 2025 Ore Reserve (Table 2).
It should be noted that mining has continued at Boorara post the August 2025 depletion with 111 kt at 1.06 g/t
mined in September 2025 and 95 kt at 1.09 g/t in October 2025. The current mining campaign has ceased at
Boorara in early December 2025. The project delivered a positive cashflow for the pit design schedule and
financial analysis when incorporating the Measured and Indicated Mineral Resource and after applying
modifying factors resulted in the following Ore Reserve in Table 2 (Table 3 assumptions, and JORC 2012
Table 1, Section 4, Appendix 1).
Table 2 – Boorara Ore Reserve – Depleted for Mining to EOM August 2025 - 0.5 ppm Au reporting cut off
Material Proven Probable Total
kt Au (g/t) kOz kt Au (g/t) kOz kt Au (g/t) kOz
Oxide 243 1.02 8 517 1.05 18 759 1.04 26
Transitional 16 1.04 1 128 1.01 5 144 1.01 5
Fresh 170 1.10 7 994 1.32 43 1,164 1.29 49
Total 429 1.10 15 1,639 1.20 64 2,067 1.20 79
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
horizonminerals.com.au Page | 4
Table 3 – Summary of Boorara Ore Reserve parameters/inputs
Parameter Units Oxide Transitional Fresh
Processing Cost AUD/t $33 $38 $43
ROM Rehandle AUD/t $0.60 $0.60 $0.60
Haulage to Process AUD/t $16 $16 $16
Grade Control AUD/t $1.0 $1.0 $1.0
Year 1 price (AUD) AUD/Troy Oz $4550 $4550 $4550
Year 2-3 price (AUD) AUD/Troy Oz $5,000 $5,000 $5,000
Met Recovery % 98 95.8 95.8
Royalties State % 2.5 2.5 2.5
Royalties other % 0.5 0.5 0.5
Yr 1 Optimisation Cut-off grade g/t 0.35 0.38 0.42
Yr 2 Optimisation Cut-off grade g/t 0.39 0.43 0.47
Crake
Project Summary
Horizon Minerals is proposing to develop the Crake Gold Project (Crake) located in the Goldfields of Western
Australia (WA), by mining and processing gold ore. The project will be processed through the Horizon owned
BSP processing hub after the completion of its refurbishment in mid-2027.
The Crake site is 9 km West of Kalgoorlie-Boulder, and 90 km from the BSP processing hub (Figure 1).
This PFS has successfully optimised and scheduled the Crake open pit project to mine and process a base
case of 0.5 Mtpa of ore. The study provided a mining cost estimate for this Maiden Ore Reserve at a Gold
price of A$4,500. The result of the study is a positive cash flow and NPV confirming the August 2025 Ore
Reserve (Table 4).
Table 4 – Crake Mineral Resource Estimate3
21/09/2021 - 0.5 g/t Au reporting cut off
Crake Indicated Inferred Total kt
Material kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 1,363 1.29 57 123 1.08 4 1,485 1.28 61
Transition 85 1.25 3 85 1.25 3
Fresh 252 1.27 10 252 1.27 10
Total 1,699 1.29 70 123 1.08 4 1,822 1.28 75
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
horizonminerals.com.au Page | 5
Pre-Feasibility Study Parameters
To determine the optimum selective mining unit size (SMU) for Crake, changes to ore tonnes and ounces for
various SMU sizes were compared against the resource model. The block size was increased to maintain a
practical mining width and used for the regularisation of the resource model.
To determine the optimum SMU size for Crake changes to ore tonnes and ounces for various SMU sizes were
compared against the resource model.
Refer to Table 5 for the calculated economic cut-off grades which are well below the 2025 Mineral Resource
cut-off grade of 0.5 g/t Au. The Crake Ore Reserve has been reported above at 0.5 g/t Au.
The optimisation was completed in Dassault Systèmes’ Whittle™ software using their Lerchs-Grossman
algorithm.
The processing and treatment inputs were in line with those used for the cut-off grade analysis which are
indicated in Table 5.
The load and haul mining costs were based on recent contractor rates at Horizon’s operations. Haulage costs
were quoted from current contract haulage providers. The summary of the key PFS inputs are also included
in Table 5. Horizon has licencing and permitting in place and a favourable relationship with the local first-
nations people. Environmental baseline studies have been completed.
The estimated Ore Reserve has been prepared by competent persons in accordance with JORC Code 2012
and is included in Table 6. See Appendix 1 for the Crake JORC Table 1, Section 4.
Table 5 –Summary of Crake PFS Ore Reserve parameters/inputs
Parameter Units Oxide Transitional Fresh
Processing Cost AUD/t $33 $38 $43
ROM Rehandle AUD/t $0.60 $0.60 $0.60
Haulage to Process AUD/t $16 $16 $16
Grade Control AUD/t $1.0 $1.0 $1.0
Year 1 price AUD/ Oz $5,000 $5,000 $5,000
Year 2 price (AUD) AUD/ Oz $4,500 $4,500 $4,500
Met Recovery % 98 95.8 95.8
Royalties State % 2.5 2.5 2.5
Royalties other % 0.5 0.5 0.5
Cut-Off grade g/t 0.35 0.38 0.42
Mining
Operational activities shall be undertaken by a mining contractor, with technical and managerial oversight
provided by Horizon. Mining is by conventional open pit truck and shovel techniques. Costs were estimated
using recent contractor mining costs at other Horizon operations.
Processing costs are based on calculated BSP PFS plant costs. All Inferred Resources were excluded from
the optimisation process, financial modelling and the estimation of Ore Reserve. An Australian dollar gold
price of $4,500 per ounce was applied. WA state royalties were subtracted from the gold price as part of the
horizonminerals.com.au Page | 6
optimisation process. Bulk densities were derived from test work. A cut-off grade of 0.5 g/t Au was applied and
a discount factor of 8% was applied to the financial model.
The Mineral Resource contained within the design was based on optimisation of the Indicated Mineral
Resource, with no Inferred Mineral Resources included and modifying factors applied.
The Crake MRE was originally reported as “Updated Crake Resource improves in quality” (Crake) dated 7
September 2021. Re-reporting of the model (crake_mre_august_2021_final.mdl) at a 0.5 g/t Au cut off
increases tonnes by 28% and contained ounces of gold by 12% (Table 4).
Ore Reserve Statement
Table 6 – Crake Ore Reserve Estimate
Material Probable Total
kt Au (g/t) kOz kt Au (g/t) kOz
Oxide 52 1.15 2 52 1 2
Trans 153 1.16 6 153 1 6
Fresh 667 1.25 27 667 1 27
Total 872 1.23 34 872 1.2 34
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Kalpini
Project Summary
The Kalpini site is located 65 km northeast of Kalgoorlie (Figure 1). The project is 42 km from the BSP
processing hub. The main ore deposits in the area are Atlas, Camelia, and Gambia. The project is to be
processed through the Horizon owned BSP processing hub after the completion of its refurbishment.
Mineral Resource Estimate
Horizon completed an updated Mineral Resource Estimate (MRE) in November 2021 (Table 7) with a revision
to the cut-off grade in November 2025.
Table 7 – Kalpini Project – Mineral Resource Estimate3
by Classification – 0.5 g/t Au Cut Off3
Indicated Inferred Total
kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Oxide 32 1.48 2 7 1.31 0 39 1.45 2
Transition 298 1.48 14 28 1.02 1 326 1.44 15
Fresh 1,439 2.17 100 556 1.76 31 1,994 2.06 132
Total 1,768 2.04 116 591 1.72 33 2,359 1.96 149
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
Pre-Feasibility Study Parameters
To determine the optimum selective mining unit size (SMU) for Kalpini, changes to ore tonnes and ounces for
various SMU sizes were compared against the resource model. The block size was increased to maintain a
practical mining width and used for the regularisation of the resource model.
horizonminerals.com.au Page | 7
The calculated economic cut-off grades (Table 8) are well below the 2025 Mineral Resource cut-off of 0.5 g/t
Au. The Kalpini Ore Reserve has been reported above 0.5 g/t Au.
The optimisation was completed in Dassault Systèmes’ Whittle™ software using their Lerchs-Grossman
algorithm.
The processing and treatment inputs were in line with those in the cut-off grade analysis in Table 5.
The load and haul mining costs were based on recent contractor rates at Horizon’s operations. Haulage costs
were quoted from current contract haulage providers. A summary of the key PFS inputs is also included in
Table 5. It should be noted Horizon Minerals has licencing and permitting in place and a favourable relationship
with the local first-nations people. Environmental baseline studies have been completed.
Mining
Operational activities shall be undertaken by a mining contractor with technical and managerial oversight
provided by Horizon. Mining is by conventional open pit truck and shovel techniques. Costs were estimated
using recent contractor mining costs at other Horizon operations.
The key parameters for the project are included in Table 8.
Table 8 –Summary of Kalpini PFS Key inputs
Parameter Units Oxide Transitional Fresh
Processing Cost AUD/t $33 $38 $43
ROM Rehandle AUD/t $0.60 $0.60 $0.60
Haulage to Process AUD/t $12.66 $12.66 $12.66
Grade Control AUD/t $1.0 $1.1 $1.2
Year 1 price (AUD) AUD/troy Oz $4,500 $4,500 $4,500
Met Recovery % 95 91.5 91.5
Royalties State % 2.5 2.5 2.5
Royalties other % 0.5 0.5 0.5
Cut-Off grade g/t 0.35 0.41 0.45
Table 8 – Kalpini Summary of Ore Reserve at 0.5 cut off
Material Probable Total
kt Au (g/t) kOz kt Au (g/t) kOz
Oxide 31 0.97 1.0 31 0.97 1.0
Trans 239 1.18 9.0 239 1.18 9.0
Fresh 597 1.93 37.1 597 2.00 37.1
Total 867 1.69 47.1 867 1.69 47.1
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
horizonminerals.com.au Page | 8
Processing costs are based on calculated BSP PFS plant costs. All Inferred Resources were excluded from
the optimisation process, the financial modelling and the estimation of Ore Reserve. An Australian dollar gold
price of $4,500 per ounce was applied. WA state royalties were subtracted from the gold price as part of the
optimisation process. Bulk densities were derived from test work. A lower cut-off grade of 0.5 g/t Au was
applied. Discount factor of 8% was applied to the economic model.
The Mineral Resource contained within the design was based on optimisation of the Indicated Mineral
Resource, with no Inferred Mineral Resources included and modifying factors applied.
To determine the optimum SMU size for Kalpini changes to ore tonnes and ounces for various SMU sizes were
compared against the resource model. The block size (XYZ) yielding minimum reduced ore tonnes whilst
maintaining a practical mining width were used for the regularisation of the resource model.
The calculated economic cut-off grades (Table 5) are well below the 2025 Mineral Resource cut-off of 0.5 g/t
Au. The Kalpini Ore Reserve has been reported at above 0.5 g/t Au.
The optimisation was completed in Dassault Systèmes’ Whittle™ software using their Lerchs-Grossman
algorithm.
The processing and treatment inputs were in line to those in the cut-off grade analysis (Table 5).
The load and haul mining costs were based on recent contractor rates from Horizon’s operations. Haulage
costs were quoted from current contract haulage providers. The summary of the key PFS inputs is also
included in Table 5.
The estimated Ore Reserve has been prepared by competent persons in accordance with JORC Code 2012
and is included in Table 9. See Appendix 1 for the Kalpini JORC Table 1, Section 4.
Summary
The total change in the Global Ore Reserve is a 246% increase in tonnes to the FY 2025 Ore Reserve4
with
an 25% drop in grade for a 160%, or 131,615 oz, increase in contained gold (Table 10 ).
Table 10 – Horizon Minerals Gold Ore Reserve Summary
HORIZON MINERALS GOLD ORE RESERVE SUMMARY
Project Cutoff Proven Probable Total
Au ppm kt Au g/t Ounces kt Au
g/t
Ounces kt Au
g/t
Ounces
Boorara 0.5 450 1.10 15,915 1680 1.21 65,357 2130 1.19 81,272
Cannon UG5
1.0 135 4.10 17,700 135 4.10 17,700
Pennys Find6
1.5 328 3.20 33,400 328 3.20 33,400
Kalpini 0.5 867 1.69 47,203 867 1.69 47,203
Crake 0.5 870 1.23 34,405 870 1.23 34,405
TOTAL 450 1.1 15,915 4,330 198,065 4,330 1.54 213,980
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding.
4
Refer to “Annual Report 2025” dated 20 October 2025
5
Refer ASX Announcement “Positive Results for Cannon Underground Gold Project and Feasibility Study Update” dated 29 March 2022
6
Refer ASX Announcement “Penny’s Find Pre-Feasibility Study and Ore Reserve” dated 18 December 2024
horizonminerals.com.au Page | 9
ASX Listing Rule 5.9 Disclosures
Pursuant to ASX listing rule 5.9, and in addition to the information contained in the attached JORC Code tables,
the Company provides the following details in respect of the Mineral Reserves listed above.
Boorara
Overview
The Boorara Gold Project is located 15 km east of Kalgoorlie-Boulder (Figure 1) adjacent to the Super Pit, and
1 km southwest of the Nimbus Silver-Zinc Project site where established offices are connected to mains power
and existing water supplies.
Material Assumptions and Outcomes
Boorara Open Pit has been reported above 0.5 g/t cut off for only Measured and Indicated material contained
in the designed and optimised open pit.
Cut-off grade parameters are outlined in the summary in Table 3. In addition to these inputs, the load and haul
costs were incorporated as well as drill and blast rates and costs including technical services, rehabilitation,
dewatering, and contractor management.
The geotechnical parameters were determined by Absolute Geotechnics in January 2022 and are incorporated
into the optimisation and design.
The optimisation was completed in Dassault Systèmes’ Whittle software using a Lerchs-Grossman algorithm.
Minimum mining widths of 50m were applied in the optimisation and designs. The pit design parameters
followed the nominated pit shells, whilst also nominally adhering to the geotechnical parameters in the correct
zones.
As mining was expected to be selective mining utilising small-scale mining fleet (nominally CAT 777D trucks)
haul road width was set at 12m with passing bays.
The Processing Cost Adjustment Factor (PCAF) includes processing costs, transportation costs, and mining
costs attributable to Ore only, such as the grade control costs and haulage.
The processing and treatment inputs and costs were in line with those in the cut-off grade analysis.
The cost estimation is based on load and haul contract rate provided by Hamptons mining services
(Hamptons). Similarly, the drill and blast contract rates were those utilised by Hamptons.
Hamptons provided a surface road haulage cost for Boorara to BSPH of 13.05/t-ore.
As the mine recently been operating with the contractor already mobilised, no significant capital expenses are
anticipated.
Only Proven and Probable Ore was utilised in the mining schedule, while inferred ore was considered waste.
The results of the economic model returned a positive net present value (NPV), demonstrating economic
viability of the plan.
horizonminerals.com.au Page | 10
Revenue Factors
Considering the current favourable condition of the gold price (current spot price of ~AUD7,100/oz), a gold
price for the first year was factored to AUD5,000/oz, and a price of AUD4,500/oz after that time for the
remainder of the operation.
The gold prices are based on market spot prices discounted by 20% at the time of writing.
Market Assessment
The gold price is determined by multiple factors in the market and world economics. Quantities produced and
supplied to the market have little or no impact on the pricing. There is no current substitute for Gold in its
various markets.
Economic
An economic operations model was produced for the Boorara operation, considering contractor mining and
processing at BSPH.
The results of the economic model returned a positive net present value (NPV), demonstrating economic
viability of the plan.
Criteria for Classification
Measured Ore is included in the Ore Reserve as Proven, and Indicated ore in included as probable, No Inferred
or has been included in the Ore Reserve. Indicated Ore has been designated as waste.
Mining Method and Assumptions
The mining method chosen is traditional truck and backhoe excavators operated by contractors.
The mine was operational until December 2025.
The geotechnical parameters were determined by Absolute Geotechnics in January 2022. The analysis was
carried out utilising all available data.
Unit (SMU) was set to 2.5 x 2.5 x 2.5 m, which is deemed appropriate for the size of equipment to be used
The reblocking of the Resource model to the SMU sizes factored dilution and ore loss into the mine planning
model (16% ore loss and 16% dilution). No further factors were applied.
A minimum mining width of 50 m was adopted for the designed mine plan.
Although the Inferred Resources were included in the pit design and mine schedule, they were not included in
the Ore Reserve totals. The economic evaluation of the mine plan considered both with and without input from
Inferred Resources, both returning viable results.
Processing Method and Assumptions
The Ore from the Project is considered to be processed at the Black Swan.
The metallurgical recoveries used were 96% for oxides, transition and fresh rock types.
The BSPH will use the well-established technology of Carbon-in-Leach (CIL) to extract the gold from the
resource to produce Dore.
horizonminerals.com.au Page | 11
There do not appear to be any deleterious elements in the ores from Boorara.
The specification of minerals for the processing routes were appropriate.
Cut-off Grades or Quality Parameters
The cut-off grade is used to differentiate between mill feed and waste materials, generally determined at the
pit exit where the material to the process plant will be cash positive or negative. This cut-off grade calculation
derives a marginal economic cut-off for Gold. The parameters used for the cut-off grade are indicated in Table
3.
The calculated economic Year 1 cut-off grades of 0.35, 0.38 and 0.42 g/t Au and the Year 2 cutoff grades of
0.39, 0.43 and 0.47 g/t Au. Both sets of cut off grades are well below the 2025 Mineral Resource Estimate cut-
off of 0.5 g/t Au. The Mineral Resource Estimate was built around 0.5 g/t Au contour wireframes.
No additional quality parameters have been applied.
Estimation Methodology
The resource block model was released with an Au cut-off grade of 0.5g/t Au.
The Mineral Resource model was depleted with the surveyed end of August 2025 topography.
The optimisation was completed in Dassault Systèmes’ Whittle software using a Lerchs-Grossman algorithm.
The mining cost adjustment factor (MCAF) used was the waste mining cost for oxide, transition, and fresh,
utilising the specific costs for each block. The Processing Cost Adjustment Factor (PCAF) includes processing
costs, transportation costs, and mining costs attributable to Ore only, such as the grade control and haulage
costs.
Both MCAF and PCAF were converted to AUD/t by dividing the result by the block density for each cell in the
model.
No additional mining dilution or recovery factors were applied during the optimisation.
Two scenarios were run –
Scenario 1 was the Mine Operational Scenario, which included all categories of the mineralisation as potential
plant feed with a Gold grade of greater than 0.5 g/t Au. In addition to the Measured and Indicated Mineralisation,
this schedule included the Inferred Mineralisation as plant feed.
Scenario 2 was the Ore Reserve scenario, which only included Measured and Indicated category
mineralisation as potential plant feed with a Gold grade of greater than 0.5 g/t Au. The Inferred category
mineralisation was considered as Waste for this scenario. This production schedule was used for reporting the
Ore Reserves for Boorara.
The two pit designs, 20250811_LOC_CUT_PIT2 and 20250812_LOC_PIT4, supplied by Horizon have been
developed already and are operational with limited opportunity to make modifications. These were used as
supplied as initial cutbacks. The ultimate pit was designed based on the selected pit shell 32 (Revenue Factor
0.92) for scenario 1.
The designed ultimate pit is illustrated in Figure 2The ultimate pit will be completely mined in less than three
years.
The mine was staged and scheduled and a cash flow analysis completed.
horizonminerals.com.au Page | 12
Material Modifying Parameters
Environmental studies have been carried out at Boorara; permits at Boorara are in place and the mine is
recently operational. The cutback design will require an amendment to the Mining proposal and closure plan.
The mine is recently operational and has the installed infrastructure supported by the mining contractor and
Horizon at Boorara. The infrastructure will remain in place for the future cutback.
Waste dump and ROM areas have been redesigned to incorporate the required changes in infrastructure.
Figure 2 indicates the ultimate pit design incorporating the waste dumps and ROM.
Horizon Minerals has a favourable relationship with the local first-nations people. A native title agreement has
been finalised with local groups covering multiple company assets including Boorara.
All factors for the mining and processing of the ore are well-established and no obstructions are foreseen.
No barriers to obtaining agreements and permits are foreseen and the tenements are in good standing.
Figure 2 – Boorara Ore Reserve Pit Design
horizonminerals.com.au Page | 13
Crake
Overview
The Crake project located within the 100% owned Binduli gold project, located 9 km west of Kalgoorlie-Boulder
in the heart of the Western Australian goldfields. Crake is one of Horizon’s core open pit and underground
satellite gold projects being advanced to provide ore feed to the BSPH.
Material Assumptions and Outcomes
Crake Open Pit has been reported above 0.5 g/t cut off for only Measured and Indicated material contained in
the designed open pit.
Cut-off grade parameters are outlined in the summary in Table 5. In addition to these inputs, the load and haul
costs were incorporated as well as drill and blast rates and costs including technical services, rehabilitation,
dewatering, and contractor management.
The geotechnical parameters were determined by Absolute Geotechnics in January 2022 and are incorporated
into the optimisation and design.
The optimisation was completed in Dassault Systèmes’ Whittle software using a Lerchs-Grossman algorithm.
Minimum mining widths of 50m were applied in the optimisation and designs. The pit design parameters
followed the nominated pit shells, whilst also nominally adhering to the geotechnical parameters in the correct
zones.
As mining method requires selective mining utilising small-scale mining fleet (nominally CAT 777D trucks) haul
road width was set at 12m with passing bays.
The Processing Cost Adjustment Factor (PCAF) includes processing costs, transportation costs, and mining
costs attributable to Ore only, such as the grade control costs.
The processing and treatment inputs and costs were in line with those in the cut-off grade analysis.
The cost estimation is based on load and haul contract rate provided by Hamptons mining services. Similarly,
the drill and blast contract rates were those utilised by Hamptons transport.
Hamptons provided a surface road haulage cost for Crake to BSPH of 15.94/t-ore.
Only Proven and Probable Ore was utilised in the mining schedule, while inferred ore was considered waste.
The results of the economic model returned a positive net present value (NPV), demonstrating economic
viability of the plan.
Revenue Factors
Considering the current favourable condition of the gold price (current spot price of ~AUD7,100/oz), a gold
price for the first year was factored to AUD5,000/oz, and a price of AUD4,500/oz after that time for the
remainder of the operation.
The gold prices are based on market spot prices discounted by 20% at the time of optimisation.
horizonminerals.com.au Page | 14
Market Assessment
The gold price is determined by multiple factors in the market and world economics. Quantities produced and
supplied to the market have little or no impact on the pricing. There is no current substitute for Gold in its
various markets.
Economic
An economic operations model was produced for the Crake operation, consi