Australia's Newest Gold Producer Presentation
Released
Released
Announcement PDF
Australia’s Newest Gold Producer
Investor Presentation | February 2025
Important disclaimers
Nature of Document
This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders, related
bodies, corporate, partners, affiliates, employees, representatives or advisers, make any representation or warranty
(express or implied) as to the accuracy, reliability, relevance or completeness of the material it contains. Nothing
contained in the Presentation is, or may be relied upon, as a promise, representation or warranty, whether as to the
past or the future, and the Company hereby excludes all warranties that can be excluded by law.
The Presentation
The presentation contains ‘forward-looking statements’. As set out in more detail on Slide 20, by their nature, forwardlooking statements involve known and unknown risks, uncertainties and other factors because they relate to events
and depend on circumstances that may or may not occur in the future, and assumptions which may or may not prove
to be correct (and may be beyond the Company’s ability to control or predict), any (or all) of which may cause the
actual results or performance of the Company to be materially different from the results or performance expressed or
implied by such forward-looking statements.
No representation is made that any forward-looking statement will come to pass, that any forecast result will be
achieved, or that any assumption on which a forward-looking statement is based is reasonable. Forward-looking
statements are made as at the date of this Presentation, and the Company disclaims any obligation or undertaking to
release any update of, or revision to, any forward-looking statement contained in this Presentation. contains
information relating to Mineral Resources estimates and Ore Reserves estimates. All persons reviewing this
Presentation should refer to the JORC resource statements and competent person confirmations in the Appendix to
this Presentation (slide 22).
Professional Advice recommended
All persons reviewing this Presentation should consider seeking appropriate professional advice before making any
investment decision. Neither the provision of the Presentation nor any information contained in the Presentation or
subsequently communicated to any person in connection with the Presentation is, or should be taken as, constituting
the giving of investment advice to any person.
Forward Looking and Cautionary Statement
As noted above, some statements in this Presentation regarding estimates or future events are forward looking
statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward
looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”,
“projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”,
“conceptual” and similar expressions.
Forward looking statements, opinions and estimates included in this Presentation are based on assumptions and
contingencies which are subject to change without notice, as are statements about market and industry trends, which
are based on interpretations of current market conditions. Forward looking statements are provided as a general guide
only and should not be relied on as a guarantee of future performance. Forward looking statements may be affected
by a range of variables that could cause actual results to differ from estimated results,and may cause the Company’s
actual performance and financial results in future periods to materially differ from any projections of future
performance or results expressed or implied by such forward looking statements. These risks and uncertainties include
but are not limited to liabilities inherent in mine development and production, geological, mining and processing
technical problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals
required in connection with mining and third party processing operations, competition for among other things,
capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of
acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various events which
could disrupt operations and/or the transportation of mineral products, including labour stoppages and severe
weather conditions, the demand for and availability of transportation services, the ability to secure adequate financing
and management’s ability to anticipate and manage the foregoing factors and risks. There can be no assurance that
forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements
in relation to future matters that can only be made where the Company has a reasonable basis for making those
statements. The forward looking statements in this Presentation are based on current expectations, estimates,
forecasts and projections about the Company and the industry in which it operates. They do, however, relate to future
matters and are subject to various inherent risks and uncertainties. Actual events or results may differ materially from
the events or results expressed or implied by any forward looking statements. The past performance of the Company is
no guarantee of future performance. You are cautioned not to place undue reliance on any forward looking statement.
The forward looking statements in this Presentation reflect views held only as at the date of this Presentation.
None of Horizon Minerals Limited or its directors, officers, employees, agents or contractors makes any representation
or warranty (either expressed or implied) as to the accuracy or likelihood of fulfilment of any future looking statement,
or any events or results expressed or implied in any forward looking statement, except to the extent required by law.
The Company believes that it has a reasonable basis for making the forward looking statements in the Presentation,
including with respect to any production targets and financial estimates, based on the information contained in this
and previous ASX announcements.
2
Australia’s Newest Gold Producer
First gold poured at Boorara
with gold production set to
commence next at Phillips Find
Pursuing a low-risk, low-capital
approach to gold production
through toll milling and ore sales
Current agreements allow for
consistent gold production
over the next +12 months
Transformational acquisition of
Black Swan plant to enhance
future processing capabilities
Cash inflows from newly started
gold operations augment already
robust cash balance
Well-funded to execute Black
Swan studies and exploration
growth strategy
Ramp up of production aligned
with record gold prices of
>A$4,000/oz Au
Highly experienced Board and
Management with strong
regional expertise
Board and Leadership team
Ashok Parekh – Non-Executive Chairman
Grant Haywood – Managing Director
•
Chartered accountant with over 40 years’ experience who owns a large
Accounting Practice in Kalgoorlie, which he has operated for 38 years
•
Mining Engineer with over 30 years’ experience in underground and open
cut mining operations
•
Awarded the Centenary Medal in 2003 by the Governor General of
Australia and was awarded the Meritorious Service Award by the
Institute of Chartered Accountants, the highest award granted by the
institute in Australia
•
Extensive mining experience managing mining projects from feasibility
through to operations for junior and multi-national companies including
Goldfields Ltd, Saracen Mineral Holdings and Phoenix Gold Ltd
Warren Hallam – Non-Executive Director
•
•
•
Highly experienced metallurgist and mineral economist with over 25
years’ experience financing, developing and operating base metal
and gold projects
Currently also a Non-Executive Director of Poseidon Nickel
(appointed in June 2022)
Has held numerous board and senior executive positions within the
resources sector including Metals X, Metals Exploration and Westgold
Julian Tambyrajah – CFO, Company Secretary
•
•
Certified Practicing Accountant and Chartered Company Secretary with
more than 30 years’ experience in commercial and corporate finance
roles in Australia and overseas resource companies, 20 years at CFO level
Extensive experience covering financial and technocommercial areas
including accounting, supply and logistics, project evaluation, feasibility
studies, construction and operations management across small and large
organisations
Stephen Guy – Chief Geologist
•
Geologist with over 25 years of experience in exploration, production and
project start-ups including open pit and underground operations
•
Developed a mining career across Western Australia, NSW and Queensland
with companies including BHP, Newcrest, St Barbara Gold, FMG and
Gindalbie Metals focusing on gold, copper, nickel, base metals and iron ore
Brendan Shalders – CEO (Poseidon)
•
•
•
Experienced mining executive with over 20 years in the mining and mining
services industries.
Extensive experience in corporate finance, accounting, risk management,
leadership and business development
Will remain in a consulting role for at least three months post Proposed
Transaction
4
4
Our strategy
Delivering shareholder value in the strong gold price environment
Generate cashflow from
mining projects through a
low capital development
strategy using regional
infrastructure and partners
Apply cashflow towards the
development of our major
cornerstone assets to
become a meaningful
standalone gold producer
Targeted exploration
program to build resources,
replenish the project pipeline
and pursue large new
discoveries
5
An active 12 Months
Horizon positioned for strong cashflows and future growth
Key Strategic Achievements
June 2024
May 2024
May 2024
Merger completed with
Greenstone Resources
Limited
200kt Toll Milling
Agreement executed with
FMR Investments to treat at
the Greenfields plant
1.24 Mt Ore Purchase
Agreement executed with Norton
Goldfields to treat Boorara ore at
the Paddington plant
Poseidon Nickel
Phillips Find
Black Swan
Proposed merger along with
$14m placement to fund
operations, drilling and studies1
Project acquired, approvals sought
and granted, contracts awarded,
mining commenced
Refurbishment and gold circuit
expansion/conversion study
First gold by March 2025
Commencing March 2025
January 2025
First gold
poured at
Boorara with
operations
continuing
Completing mid-February 2024
Notes: (1) unconditional placement raised ~$14.0M through the issue of ~155.7M new fully paid ordinary shares in Horizon (New Shares) using its existing placement capacity
under Listing Rule 7.1 (Tranche 1) and conditional placement to raise ~$7.0M through the issue of ~155.4M New Shares was approved by shareholders at Horizon’s Annual
General Meeting (Tranche 2) in November 2024.
6
Proposed transformational acquisition
Horizon to acquire 100% of Poseidon via all-scrip transaction for ~A$30M
Merger consolidates 1.8Moz Au and highly strategic processing infrastructure for Horizon to transition to the next
standalone WA gold producer
“Horizon Minerals 2.0”
Seeking downstream processing capabilities
to unlock its extensive portfolio of gold
resources and exploration assets
Undertaking multi-commodity exploration to
identify a pathway to production and
support plant refurbishment at Black Swan
Alignment of both strategies by combining
significant gold resources and establishing
gold processing capabilities at Black Swan
1.8Moz
2.2Mtpa
Black Swan infrastructure provides a
production pathway for Horizon’s aspiration
to reach 100kozpa
1.44Mt
381km2
Consolidates a large, strategic landholding
in the WA Goldfields
928km2
Brownfield gold targets
Reinvigorated exploration targeting mineable
ounces for an initial 5-year mine plan
Gold Mineral Resource from 30.55Mt @ 1.84g/t
Ore sales and toll milling agreements in place
Large, strategic WA Goldfields tenure
Delivery of established mining and process
infrastructure at an attractive price
Black Swan processing facility (C&M)
Large, strategic WA Goldfields landholding
Untested anomalies adjacent to Black Swan
Realises an immediate premium for Poseidon
shares, while retaining full leverage to the
strengthened combined asset base
Unlocks shared value in a strong gold price
environment with a credible strategy to achieve a
re-rating as a sustainable gold producer
7
Horizon Minerals 2.0 – at a glance
Capital structure
Units
Existing
Pro-forma(2)
Share price(3)
$/sh
$0.048
$0.048
No. of ordinary shares
M
1,570.7(4)
2,127.0(2)
Market capitalization
$M
75.4
102.1
Cash and cash equivalents
$M
9.6(1)
9.6(1)
Debt
$M
8.4(1)
8.4(1)
Net cash / (debt)
$M
1.2
1.2
Enterprise value
$M
74.2
100.9
1.8MOZ
Gold Mineral Resource from
30.55Mt @ 1.84 g/t Au
+$30M
Estimated free cash flow from
ore sale/toll milling agreements
2.2Mtpa
Black Swan processing facility
located 40km N of Kalgoorlie
1,309km²
Large, strategic WA Goldfields
landholding
Notes: (1) 31 December 2024. (2) Assumes completion of the Poseidon transaction and tranche 2 of Private Placement. (3) Closing price as of 7 February 2025. (4) Includes
tranche 1 of private placement.
The pro-forma financial information is for illustrative purposes only and is not intended to represent Horizon's future financial position.
8
Horizon Minerals 2.0 – strategy
1.8Moz of Resources; 2.2Mtpa processing facility; 1,309km2 of exploration tenure
• Transformational acquisition of Poseidon’s 2.2Mtpa
Black Swan processing facility (currently on care &
maintenance)
• Estimated replacement value of +$150M
• Potential for low-capex refurbishment and
conversion for gold processing
• Large existing Resource base and extensive exploration
tenure in an attractive geological position centred
around Kalgoorlie / Coolgardie
• A reinvigorated exploration strategy focused on
defining mineable ounces for Black Swan (subject to
successful completion of the Proposed Transaction)
• Future drilling weighted towards upgrading
Resource confidence and extending Resources at
baseload deposits
• Estimated FY25/FY26 drilling budget of ~50,000m1
• Core focus on developing a robust initial 5-year
mine plan
• Expedited pathway to becoming a sustainable, high
margin gold producer
Notes: (1) Expected to be partially funded by free cash flows from Boorara and Phillip’s Find.
9
A pathway to growth
The Proposed Transaction reflects a sensible strategy to grow
Dual track growth strategy to
support Horizon’s aim to
become a ~100kozpa producer
1
2
Acquire Poseidon as
cash flow starts
•Acquisition via
recommended schemes
of arrangement
•Secures strategic
processing infrastructure
in the WA Goldfields
•Mining at Boorara and
Phillips Find starting
with steady cash flow
expected over the next
18 months
3
Drilling and plant
conversion study
•FID on potential lowcapex refurbishment
and conversion for gold
processing in H2
CY2025
•Exploration and
development strategy
focused on defining
mineable ounces to
support Black Swan feed
4
Plant refurbishment
and operations
•Complete refurbishment
of plant front end and
addition of gold
processing back end
•Commence processing
of ore from within the
Horizon Resource base
•Focus on developing a
robust 5-year mine plan
Build out the
mining pipeline
•Continue to drill and
complete mining studies
to extend mine life
•Assess potential to
process other ore
sources through JVs, toll
treatment and
acquisition to further
extend mine life
Today
10
Portfolio overview
Complementary assets with wide Resource growth potential
First Gold Pour at Boorara
Commencement of continuous gold production over the next 14 months
• First gold pour from the Boorara Gold Project achieved on 14
January 2025
• First stockpile of 54,604 dmt @ 0.8g/t Au hauled to Norton
Gold Fields’ Paddington Mill over December 2024 and January
2025 for processing
• Binding Ore Sale Agreement with for processing 1.24Mt of
Boorara ore at Paddington
• Little-to-no upfront capital investment ($0.45M) –
carried by mining contractor and repaid via cash flows
• +$30M free cash flow at A$3,600/oz – gold price is
now above A$4,000/oz
• First ore recoveries of 90% for approximately 1,200 oz
recovered
Summary of Boorara Study Key Outcomes
Ore Reserve study
@ A$3,300/oz
Contract pricing
@ A$3,600/oz
Total pit volume (MBCM)
4.37
4.37
Stripping ratio (waste: ore)
6.1
6.1
Mined ore (Mt)
1.24
1.24
Gold grade (g/t)
1.24
1.24
Milling recovery average (%)
92.5
92.5
Recovered gold (koz)
45.8
45.8
Capital costs (A$M)
0.45
0.45
Free cashflow (A$M)
19.9
30.0
Measure
• Mining continues at Boorara pits 2 and 4 building the next
stockpile for haulage.
12
Phillips Find
First gold expected in Q1 2025
• Development and mining of two open pits at Philips Find
commenced, under Joint Venture (JV) Agreement with mining
specialists BML Ventures Pty Limited (BML)
• Equipment mobilisation, site establishment and mining approvals
completed in December 2024
• Grade control drilling, pre-strip and mining of cutbacks to two
existing pits underway at Newhaven and Newminster.
• Low financial risk JV structure with BML to fund all project costs
and undertake all management, technical, operational and
maintenance roles.
• Greenfields toll milling agreement in place for Phillip’s Find:
• Up to 200kt of ore processed at FMR Investments (FMR)’
Greenfields mill over a period of five months starting in
February 2025
• First gold pour on track from Phillips Find for March quarter 2025
13
Penny’s Find PFS
Robust cashflows from a development-ready gold asset
• PFS completed for Penny’s Find, utilising underground mining
methods outlines a financially viable project:
• Underground mine design and schedule producing 329.9kt at
a fully diluted grade of 3.2g/t Au for 33.5koz over an
approximate 23 month mine life
• Metallurgical recovery of 88.9% produces 29.8koz recovered
under an assumed third-party toll milling arrangement in the
region
• Project generates $24.0M in free cash flow (after capital) at a
gold price of A$3,600/oz
• Maiden Ore Reserve declared, constituting 99.7% of the production
target, currently stands at 328.3 kt @ 3.2 g/t Au containing 33.4 koz
Gold
• Penny’s Find fully permitted with all statutory approvals in place
Notes: (1) Expected to be partially funded by free cash flows from Boorara and Phillip’s Find.
Resource category
Tonnes (kt)
Au (g/t)
Gold metal (Oz)
Indicated
305
5.19
51,000
Inferred
123
3.02
12,000
Total
429
4.57
63,000
14
Poseidon’s Black Swan processing facility
2.2Mtpa processing facility strategically located ~40km north of Kalgoorlie
• 2.2Mtpa processing facility (C&M) and associated
infrastructure with optionality for an initial 1.0 –
1.5Mtpa throughput
• Black Swan concentrator readily amenable to
processing gold through cost-effective
refurbishment and addition of new CIL circuit
• All requisite mining, regulatory and environmental
approvals in place
• Dedicated grid power and water access
• Proximal to >1Moz gold resources and existing
high-grade nickel along with several prospective
greenfields targets(1)
• Strategically located within 40km of Kalgoorlie;
easy access to labour, spares and consumables
Notes: (1) There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
15
Poseidon’s Black Swan process facility
Existing flotation circuit and planned changes to facilitate gold production
Gold conversion
Carbon
in leach
Crush
Grind
Refurbishment
Flotation
Elution
Gold room
Au
Ag/Zn + Ni
Concentrates
Future refurbishment
option
16
Strong pipeline to support Black Swan
Horizon’s 30Mt of existing gold Resources with ~50,000m of drilling budgeted in FY25/261
Black Swan Ni
Nimbus Zn/Ag
Coote
Cannon
Greater Boorara
Crake
Burbanks
Phillips Find
Wilson’s
Teal
Penny’s Find
Boorara
Rose Hill
Kalpini
~300koz
~700koz
~480koz
Advanced drilling target
Resource definition &
expansion
Operations
Greenfields
Poseidon project
Base metal project
Notes: (1) Expected to be funded by free cash flows from Boorara and Phillip’s Find.
17
Reinvigorated exploration strategy
Clear focus on improving Resource confidence and growing mineable ounces
• Resources of 1.8Moz on prolific geological
structures around Kalgoorlie / Coolgardie
• Stronger balance sheet will enable faster Resource
Black Swan
growth and increased Resource confidence as part
of building a robust initial five-year mine plan
Penny’s Find
• Key targets for 2025 drilling include:
• Burbanks
• Greater Boorara
Boorara
Coote/Crake
• Poseidon greenfield gold targets near Black
Swan (i.e. Wilson’s)
• Coote, Crake, Penny’s Find and Kalpini
Burbanks
• Resource definition and extensional drilling budget
of ~50,000m planned in FY25/FY261
Notes: (1) Expected to be partially funded by free cash flows from Boorara and Phillip’s Find.
18
Burbanks project
Significant Resource upside to be unlocked from a key cornerstone asset with scale and grade
• Located on a granted mining lease 9km south of
Coolgardie
• Supported by a network of existing infrastructure
including grid power and sealed roads
• Historic production estimated at +420koz
• Combined MRE of 465.5koz @ 2.80g/t Au
• Large scale 297.6koz open pit and high-grade
underground (4.4g/t Au)
• Only 30% of mineralised strike tested above 500m
with significant potential for extension
• Minimal drilling completed since 2022
• Last Resource update added 188koz from 10,000m
of drilling
• Major extensional drill program (~20,000m) planned
to start in early 20251 and deliver a material uplift in
mineable Resources to support the Black Swan fiveyear initial mine plan
Notes: (1) Expected to be partially funded by free cash flows from Boorara and Phillip’s Find.
Burbanks Mineral Resource Estimate
Resource
Category
Cut-off
Indicated
Inferred
Total
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Mt
Au g/t
Oz
Burbanks OP
0.5
1.43
2.00
92,780
3.43
1.90
204,870
4.86
1.90
297,650
Burbanks UG
2.5/2.0
0.12
4.30
16,730
1.07
4.40
151,190
1.19
4.40
167,920
19
Poseidon’s Black Swan – gold prospectivity
Untested gold anomalies emerging adjacent to the process plant infrastructure
• Limited previous gold focused exploration in the area – only 5%
of drill assays have tested for gold
• Drill intersections grading up to 6.41g/t Au
• Wide spaced soil sampling program completed over the entire
Black Swan tenement package in August 2024
• Numerous gold nuggets located
• Identified a new 6.5km long gold trend around Black Swan
• The most coherent anomaly, located at Wilson’s (North
Anomaly), is 1.4km by 1km in size and immediately north of the
existing nickel mines and associated infrastructure
• Infill sampling results awaited to refine high priority targets for
drilling in early 2025
• Maiden drilling of untested gold targets at Black Swan within the
next 12 months as part of 10,000m of proposed greenfields
drilling over 2025/261
Notes: (1) Expected to be partially funded by free cash flows from Boorara and Phillip’s Find.
20
Platform for regional consolidation
>1Moz of gold resources in region are without a clear processing solution
• Opportunities for non-producers to access third
party gold processing infrastructure in the WA
Goldfields is becoming increasingly difficult
• Conversion of a 2.2Mtpa processing facility to
gold production has potential to unlock
stranded gold resources in the region
• Potential to partner with third parties via joint
venture, toll milling, and ore purchase
arrangements
• Further scope to unlock value through asset
sales or corporate transactions
• Horizon will assess these opportunities to add
mine life which are accretive to Horizon
shareholders
21
Operational timeline
Indicative timeline of upcoming cash flow and pathway to gold from Black Swan
Target key workstreams
(Forward 18 months)
Boorara
Phillips Find
2025
Q1
Q2
2026
Q3
Q4
Q1
Q2
Q3
Q4
First Gold Production Achieved
Toll Treatment – First Gold Production
Potential toll treatment/ore sales
Completion of Poseidon Merger
Black Swan conversion studies
Black Swan refurb & conversion work
Resource extension drilling
Mining studies
Black Swan gold processing
First Gold Production
22
Appendices
Horizon Mineral Resource Estimate
Gold deposits
Project
Cutoff
Indicated
Mt
Au g/t
Oz
1.12
1.22
44,000
Boorara OP
0.5
Burbanks OP
0.5
Burbanks UG
2.5/2.0*
Phillips Find OP
0.5
Phillips Find UG
2
Golden Ridge
1
Golden Ridge North
0.8
Cannon UG
1
Monument
0.5
Pinner
0.5
Pennys Find
1.5
Kalpini
0.8
Rose Hill UG
2
Rose Hill OP
0.5
Jacques-Peyes
0.8
Teal
1
Crake
0.8
Coote
1
Capricorn
0.5
Baden Powell
0.5
Total
Measured
Au g/t
-
0.19
-
1.31
-
2.00
-
1 .34
Mt
Inferred
Au g/t
Oz
Mt
Total
Au g/t
Oz
Mt
Au g/t
Oz
-
6.85
1.28
281,000
2.56
1.26
103,000
10.53
1.27
428,000
1.43
2.00
92,780
3.43
1.90
204,870
4.86
1.90
297,650
0.12
4.30
16,730
1.07
4.40
151,190
1.19
4.40
167,920
0.54
2.40
41,650
0.19
2.10
12,700
0.73
2.30
54,360
0.03
2.30
210
0.03
2.30
210
-
12,300
56,300
-
0.47
-
1.83
-
27,920
0.10
1.70
2,800
0.52
1.82
30,720
0.65
1.15
24,260
0.77
1.30
32,340
1.42
1.23
56,600
0.19
4.80
28,620
0.10
2.30
3,450
0.23
4.29
32,070
0.92
1.11
33,000
0.92
1.11
33,000
2,091
0.27
1.25
10,753
0.33
1.21
12,844
-
-
-
0.06
1.02
0.30
5.19
51,000
0.12
3.00
12,000
0.43
4.57
63,000
1.40
2.43
108,000
0.50
2.00
31,000
1.87
2.33
139,000
0.33
4.50
47,100
0.20
4.80
27,800
0.51
4.60
74,900
0.09
2.00
6,100
0.29
2.00
18,400
0.97
2.59
81,000
1.01
1.96
63,680
1.33
1.47
63,150
-
15.74
-
1.85
-
935,081
-
0.80
-
2.00
-
49,000
1.74
2.32
130,000
0.80
2.50
64,460
1.81
2.20
128,140
0.10
1.30
3,300
1.42
1.46
66,450
0.40
1.50
21,000
0.42
1.54
21,000
0.70
1.20
25,500
0.70
1.20
25,500
0.60
13.66
1.20
1.85
23,000
811,373
Refer to ASX announcement 1 August 2024 and see confirmations on page 24. Horizon confirms that all material
assumptions included in the initial announcement dated 1 August 2024 continue to apply and have not materially changed.
0.60
30.55
1.20
1.84
24
23,000
1,802,764
Horizon Ore Reserve Estimate
Cannon Ore Reserve
Category
Tonnes
Au (g/t)
Ounces
Proven Reserve
–
–
–
Probable Reserve
135,000
4.1
17,680
Total Reserve
135,000
4.1
17,680
Reserve Category
Tonnes
(Mt)
Au (g/t)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
Tonnes
(Mt)
Au (g/t)
Gold Metal (kOz)
Proven
–
–
–
Probable
328.3
3.2
33.4
Boorara Ore Reserve
Location
Boorara Open Pit
Penny’s Find Ore Reserve
Location
Penny’s Find UG
Reserve Category
Total 1 August 2024 and
328.3
3.2
33.4
Refer to ASX announcement
see confirmations
on page
25.
25
Horizon Mineral Resource Estimate
Nimbus silver-zinc project
Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au)
Category
Mt
Ag (g/t)
Au (g/t)
Zn (%)
Ag (Moz)
Au (kt)
Zn (kt)
Measured Resource
3.62
102
0.09
1.2
11.9
10
45
Indicated Resource
3.18
48
0.21
1.0
4.9
21
30
Inferred Resource
5.28
20
0.27
0.5
3.4
46
29
Total Resource
12.08
52
0.20
0.9
20.2
77
104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2,800g/t Ag top cut)
Category
Mt
Ag (g/t)
Zn (%)
Ag (Moz)
Zn (kt)
Measured Resource
-
-
-
-
-
Indicated Resource
0.17
762
12.8
4.2
22
Inferred Resource
0.09
797
13.0
2.2
11
Total Resource
0.26
774
12.8
6.4
33
Refer to ASX announcement 1 August 2024 and see confirmations on page 24.
26
Horizon Mineral Resource Estimate
Mt Thirsty nickel-cobalt project (50% Horizon)
Mt Thirsty (Cut-off Grade 0.25% NiEq%)
Category
Tonnes
Grade
Contained Metal
Mt
Ni (%)
Co (%)
Mn (%)
Ni (‘000t)
Co (‘000t)
Mn (‘000t)
Measured Resource
-
-
-
-
-
-
-
Indicated Resource
30.2
0.51
0.10
0.69
154.7
29.3
207.8
Inferred Resource
31.9
0.35
0.03
0.24
110.4
9.3
76.6
Total Resource
62.1
0.43
0.06
0.46
265.1
38.5
284.4
Measured Resource
-
-
-
-
-
-
-
Indicated Resource
-
-
-
-
-
-
-
Inferred Resource
4.2
0.43
0.05
0.29
17.9
2.0
11.8
Total Resource
4.2
0.43
0.05
0.29
17.9
2.0
11.8
TOTAL RESOURCE
66.2
0.43
0.06
0.45
283.0
40.5
296.2
Mt Thirsty Main (MTTM)
Mt Thirsty North (MTTN)
Refer to ASX announcement 1 August 2024 and see confirmations on page 24.
27
Mineral Resource & Ore Reserve disclosure
Confirmations
Horizon’s Gold Mineral Resources
The information in this announcement that relates to Horizon’s exploration results and Mineral Resources estimates is extracted from and was originally reported in Horizon’s ASX announcements “Intermin’s Mineral Resources
Grow 30% to over 560,000 Ounces”, (ASX:IRC) (Teal) dated 19 September 2018, “Gold resources increase to 1.24moz” (Coote, Capricorn, Baden Powell) dated 28 September 2022, “Rose Hill firms as quality high grade open pit
and underground gold project” dated 8 December 2020, “Pennys Find Resource Update” dated 29 December 2023, “Updated Crake Resource improves in quality” dated 7 September 2021, “Jacques Find- Peyes Farm Mineral
Resource update” dated 15 September 2021, “Asset Swap with Northern Star Completion”, dated 20 December, 2019, “Investor Presentation June 2022”, 31 May 2022, "Maiden Resources for Monument and Golden Ridge North”,
19 July 2023, “Kalpini Gold Project Mineral Resource Update” dated 28 September 2021, “Group Minerals Resources Statement” dated 25 July
Share your feedback
Discover