Quarterly Activities Report December 2024
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
29 JANUARY 2025
QUARTERLY ACTIVITIES REPORT FOR THE
PERIOD ENDED 31 DECEMBER 2024
HIGHLIGHTS
•
Placement of $14 M and proposed merger with Poseidon Nickel Limited (ASX: POS) via
Schemes of Arrangement to acquire all of the shares and options of POS with the
objective of the Company’s in-ground assets being processed through the POS Black
Swan processing plant which Horizon propose to refurbish and repurpose as a gold plant 1
•
Activities at the Boorara Gold Project included first ore mined, completion of the grade
control drilling program and the first ore stockpile of 54,380 tonnes was completed and
haulage to the Paddington Mill commenced 2,3
•
Subsequent to the end of the December quarter and at the time of reporting, the company
announced the first gold pour of the Boorara Gold Project under the Ore Sale Agreement
with Paddington Mill 4
•
Mining and grade control drilling commenced at the Phillips Find Gold Project after
equipment mobilisation, site establishment and mining approvals granted early in the
quarter 5
•
Prefeasibility study completed for the Penny’s Find Underground Gold Project with a
maiden Ore Reserve of 328.3 kt at 3.2 g/t Au for 33.4 koz and a projected free cash flow
of $24.0 M at a gold price of A$3,600/oz 6
MARCH QUARTER ACTIVITIES 1
•
General Meeting approval by POS shareholders for the Schemes of Arrangement (shares
and options) to be approved at the 31 January 2025 scheme meetings
•
Subject to POS security holders approving the Schemes and court approval. The Scheme
Implementation Date is anticipated to be 19 February 2025 at which point POS security
holders will receive Horizon shares and options as per the agreed Scheme ratio of 0.1156
•
Post POS merger, select the engineering consultants to be used for the Black Swan
refurbishment and gold circuit expansion and commence work
•
First Gold Pour from Phillips Find mining via Toll Milling arrangement with the Greenfields
Mill near Coolgardie
•
Continued gold production at the Boorara Gold Project via Paddington Mill Ore Sale
1 As announced to the ASX on 25 October 2024
2
See Forward Looking and Cautionary Statements on Page 26.
3 As announced to the ASX on 3 October 2024 and 10 December 2024 see tables and confirmations on page 22-25.
4 Activity occurred after the end of the December Quarter but before the release of this report as announced to the ASX on 15
January 2025.
5 As announced to the ASX on 8 October 2024 and 13 November 2024.
6 As announced to the ASX on 18 December 2024 and see Tables and Confirmation on page 22-25.
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
HRZ QUARTERLY DEC 2025
OVERVIEW
Horizon Minerals Limited (ASX: HRZ) (Horizon or the Company) is pleased to provide the
December 2024 Quarterly Activities Report. Horizon is an exploration and gold production
company within the Kalgoorlie and Coolgardie regions of Western Australia (Figure 1).
A key objective for the Company is on near term gold production and exploration upside within
our large tenement package of 928 km2. In addition to 1.8 Moz of gold resources, the company
holds a number of multi-commodity assets including the Nimbus Silver Zinc project, 50% of the
Mt Thirsty Nickel Cobalt Manganese project in Western Australia, and listed investments
including Richmond Vanadium Technology (ASX: RVT) which holds the world-class 1.8Bt
Richmond vanadium project in northwest Queensland (Figure 5) 7.
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Activities during the quarter focussed on execution of the strategy of extracting near term
cashflow from mining projects, with first ore being mined at Boorara for treatment at Norton
Goldfields’ Paddington processing plant. 8 Additionally, pre-strip mining and grade control drilling
commenced at the Phillips Find project under the JV agreement with BML Ventures. Ore will be
processed under a Toll Milling Agreement with FMR at their Greenfields plant near Coolgardie
commencing in February 2025. 9
7 See Summary of Gold and non-Gold Mineral Resources and Confirmation on pages 22-25.
8
9
As announced to the ASX on 29 July 2024.
As announced to the ASX on 7 August 2024.
Page 2 of 26
HRZ QUARTERLY DEC 2025
There was minimal emphasis on exploration drilling during the quarter as resources and
expenditure focussed on activities aimed at getting assets into production and generating
cashflow for the Company.
MINE DEVELOPMENT AND OPERATIONS
The Company is successfully executing its strategy of bringing its extensive gold assets into
production and generate strong cashflows in current times of record high gold prices with its
Boorara and Phillips Find Gold Projects both progressing to production, and in the case of
Boorara first delivery of ore to the Paddington Mill for processing and first gold pour. 10
Boorara Gold Project
The Boorara Gold Project is located 15km east of Kalgoorlie-Boulder (Figure 1) adjacent to the
Super Pit, and 1km southwest of the Nimbus Silver-Zinc Project site where established offices
are connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
The Mineral Resource Estimate (JORC 2012) for Boorara is shown Table 1 below:
Table 1: Boorara Mineral Resource Estimate 11
Boorara at 0.5 g/t lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
Measured
Resource category
1.12
1.22
Gold Metal (Oz)
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
The Ore Reserve for Boorara is shown in Table 2 below
Table 2: Boorara Ore Reserve 12
Location
Boorara Open Pit
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
The company is not aware of any new information or data that materially affects the information
presented and that the material assumptions and technical parameters underpinning the Boorara
Ore Reserve Study continue to apply and have not materially changed.
During the quarter the first campaign of grade control drilling was completed and assays returned.
Mining continued across pit 2 and pit 4 with the first ore stockpile of 54,830t constructed. Grade
determination drilling and assaying were completed, and haulage to the Paddington Gold Mill
commenced and was completed during January 2025. First ore was processed at a grade of 0.8
10
As announced to the ASX on 15 January 2025 (after the reporting period but before the release of this report).
11 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
12 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
Page 3 of 26
HRZ QUARTERLY DEC 2025
g/t Au and a recovery of 94% for approximately 1,400 oz recovered for the initial stockpile
estimate at a spot gold price of A$4,198/oz. 13 A final invoice determining the final recovery and
ounces paid less processing costs will be issued within 5 days of the stockpile being completed.
Phillips Find Project
The project is centred 45kms north-northwest of Coolgardie (Figure 1) covering over 10km strike
of prospective greenstone stratigraphy, and includes the Phillips Find Mining Centre (PFMC)
where approximately 33,000oz of gold was produced between 1998 and 2015 from three open‐
pit operations; Bacchus Gift, Newhaven and Newminster.
Under the Joint Venture (JV) Agreement between Horizon Minerals and BML Ventures Pty
Limited all management, technical, operational and maintenance roles will be undertaken by BML
with oversight by the Company. This is a low financial risk JV structure with BML to fund all
project costs. Net cashflow after the asset recovery and repayment of costs to be split 50/50
between Horizon and BML. This allows Horizon to focus 100% on delivering its Boorara gold
project 12.
During the December 2024 quarter, equipment mobilisation, site establishment and mining
approvals were completed with the commencement of grade control drilling and pre-strip and
mining of cutbacks to two existing pits Newhaven and Newminster (Figure 2). An existing 200kt
Toll Milling Agreement executed with FMR Investments Pty Ltd (FMR) in May 2024 will be utilised
for ore processing, with first ore from Phillips Find on track to be treated at FMR’s Greenfields
mill from February 2025.12
Figure 2: The Newminster and Newhaven Open pits at Phillips Find, January 2025
(subsequent to the end of the December quarter and at the time of reporting).
13 As announced to the ASX on 12 September 2024, 8 October and 10 December 2024.
Page 4 of 26
HRZ QUARTERLY DEC 2025
Penny’s Find Gold Project
The 100% owned Pennys Find gold project is located 50km northeast of Kalgoorlie-Boulder in
the heart of the Western Australian goldfields (Figure 1). The high-grade gold mineralisation at
Pennys Find is hosted in thin quartz veins at the contact between footwall sediments including
black shale and siltstone and a hangingwall basalt. The quartz veins dip about 60° to the
northeast, and a 1m to 5m true width. The project presents an early underground development
and production opportunity to generate cash utilising a toll milling and underground contractor /
JV arrangement. 14
An update to the Penny’s Find Resource completed during the March 2024 quarter which
estimated a 63,000 ounce underground resource for Pennys Find (Table 3). The deposit also
remains open at depth and will be tested from underground drilling positions. 13
Table 3: Pennys Find Minerals Resource Estimate (JORC 2012) 15
Pennys Find underground (<260m RL) at 1.5g/t Au cut-off grade
Resource category
Tonnes (t)
Grade (g/t Au)
Gold metal (oz)
Indicated
305,000
5.19
51,000
Inferred
123,000
3.02
12,000
Total
429,000
4.57
63,000
During the December 2024 quarter the prefeasibility study (the Study) using underground mining
methods was completed by a combination of in-house personnel and independent consultants
and shows a financially viable project highlighted by the following: 16
•
•
•
Underground mine design and schedule producing 329.9kt at a fully diluted grade of
3.2g/t Au for 33.5koz over an approximate 23 month mine life
Metallurgical recovery of 88.9% produces 29.8koz recovered under an assumed third
party toll milling arrangement in the region
Project generates $24.0M in free cash flow (after capital) at a gold price of A$3,600/oz
The key Study outcomes for the project are included in Table 4 below: The estimated Ore
Reserve, which constitutes 99.7% of the production target, has been prepared by Competent
Persons in accordance with the guidelines of the JORC Code (2012).15
Table 4: Summary of Prefeasibility Study key outcomes 15
Measure
Lateral development (m)
Outcome
4,775
Vertical development (m)
1,847
Development ore (kt)
99.5
Stoping ore (kt)
230.4
Total ore mined (kt)
329.9
Gold grade (g/t Au)
3.2
Milling recovery (%)
88.9%
Recovered gold (oz Au)
29,812
14 See forward Looking and Cautionary Statements on Page 26.
15 As announced to the ASX on 1 August 2024, also see confirmations and tables on page 22-25.
16 As announced to the ASX on 18 December 2024, also see confirmations and tables on page 22-25.
Page 5 of 26
HRZ QUARTERLY DEC 2025
Total revenue (A$M at A$3,600/oz)
Capital costs (A$M including
development)
Operating costs (A$M)
107.3
All in sustaining costs (A$/oz recovered)
2,794
Free cashflow (A$M at A$3,600/oz)
24.0
NPV (A$M at 5% discount rate)
21.4
23.8
59.5
Horizon conducted the Study as of 17 December 2024. The Study, prepared with an accuracy of
±15%, considered all relevant mining modifying factors, allowing an Ore Reserve to be estimated
in accordance with the guidelines of the JORC Code (2012). Classification of the estimate is
shown in Table 5.
Table 5: Ore Reserve Statement 15
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (koz)
Proven
0
0
0
Probable
328.3
3.2
33.4
Total
328.3
3.2
33.4
The company is not aware of any new information or data that materially affects the information
presented and that the material assumptions and technical parameters underpinning the Pennys
Find Prefeasibility Study and Production Target continue to apply and have not materially
changed.
EXPLORATION AND EVALUATION
During the quarter, minimal emphasis was placed on exploration drilling, as resources and
expenditures focused on activities aimed at putting assets into production and generating cash
flow for the Company.
The Horizon Group Mineral Resources Statement following the completion of the merger with
Greenstone Resources Limited (formerly ASX: GSR) in June 2024 currently stand at: 17
•
1.8Moz gold
•
20.2Moz silver, 104kt zinc
•
283kt nickel, 40.5kt cobalt and 296.2kt manganese (50% owned)
Kalpini Gold Project
During the June 2024 quarter, AMC Consultants continued to undertake an Ore Reserves Study
on Kalpini using open pit mining methods cutting back the existing Gambia and Camelia open
pits, and with a potential new pit in the Atlas area. Input costs were updated and based on budget
contract pricing from a reputable contractor, and AMC reviewed Horizon’s data in relation to the
modifying parameters for the Ore Reserve, inclusive of the resource model and estimate,
hydrogeological and geotechnical studies.
Burbanks Project
17 As announced to the ASX on 1 August 2024, also see Tables and Confirmations on Pages 22-25.
Page 6 of 26
HRZ QUARTERLY DEC 2025
The company announced an equity placement of $14m during the quarter of which $3M will be
used to drill 20,000m at Burbanks over the next two years. Work is ongoing to assess the
potential for medium-term cashflows from near surface resources, potentially adding to the
pipeline of projects Horizon currently has underway. Flora and Fauna surveys have been
undertaken during quarter, near Burbanks South.
Nimbus Silver-Zinc Project 18
The Nimbus silver-zinc project is adjacent to the Boorara gold mine, 17km east-southeast of
Kalgoorlie-Boulder in the goldfields of Western Australia (Figure 1). The Nimbus Project is 2km
east of the Company’s cornerstone Boorara project. The Nimbus mine site is on granted mining
leases M26/490 and M26/598 and easily accessed from the Kalgoorlie-Bulong Road via an
unsealed haul road. The Nimbus Project was mined in two stages from January 2004 - May 2006.
Ore treatment was undertaken at an onsite mill utilising a Merrill-Crowe circuit. The Nimbus
Silver-Zinc Project was placed on care and maintenance in 2007 after producing 3.6Moz of silver
from 318kt of ore at a grade of 353g/t Ag.
MacPhersons Resource Limited (MRP) completed due diligence in August 2011 and purchased
the Nimbus property on 8 September 2011 from Kalgoorlie Ore Treatment Company Pty Ltd
(KOTC). In June 2019 the former Intermin Resources Limited finalised its merger with MRP,
becoming Horizon Minerals Ltd.
The Nimbus Mill was removed and the area rehabilitated. The mine office and other infrastructure
is still in place and operational on grid power and is currently being used by the management
and technical teams operating the Boorara mine.
As a consequence of the historic mining and processing of ore, Nimbus was classified by the
Department of Water and Environmental Regulation (DWER) in 2006 as a ‘Contaminated –
Remediation Required’ site under the Contaminated Sites Act. This restricted some activities at
the site. Following the merger with MacPherson Resources in 2019, Horizon undertook a
Mandatory Audit Review process under the Contaminated Sites Act and began to carry out
cleanup works to reclassify the site. The Company completed the clean-up in 2022, and the
Mandatory Audit Review (MAR) report was completed and submitted to DWER to reclassify the
site during the current September 2024 quarter. The MAR report is currently under assessment.
An independent review by Australian Mining Consultants (AMC) and Sedgmen was
commissioned in 2022 to assess the historic data, mine optimisations and metallurgical work to
evaluate the optimal pathway forward for the project. The review highlighted the potential of the
project through underground mining of the fresh higher-grade ore below the historical Discovery
pit and generating a silver and a zinc concentrate for sale to potential offtake partners. A gold
concentrate was also assessed to improve overall life of mine given the need for additional
tonnage to underpin the construction of a concentrator at site.
18 As announced to the ASX on 28 August 2024 and see tables and confirmation on page 22-25 and see forward Looking and
Cautionary Statements on Page 26.
Page 7 of 26
HRZ QUARTERLY DEC 2025
Given the drilling success to date along the Gretel-Nimbus-Brindabella trend and the potential
for repeat high grade lenses at Nimbus deeps and along strike, a drilling campaign has been
designed to assess untested drilling targets identified below the Nimbus pits.(Figure 3 and Long
section through showing open zones down dip/plunge extension Figure 4).
Cautionary Statement – Exploration Target
The potential quantity and grade of the Exploration Target is conceptual in nature. There has been
insufficient exploration to estimate a Mineral Resource and there is no certainty that further exploration
work will result in the determination of mineral resources. See the basis of exploration target announced to
the ASX on 28 August 2024 on pages 6 and 15-17, also Tables on pages 21-24, Competent Persons
Statement on Pages 18 of that announcement.
Figure 3: Long section through Ag Lode 211 showing down dip/plunge extension
Page 8 of 26
HRZ QUARTERLY DEC 2025
Figure 4: Long section through showing open zones down dip/plunge extension
ACQUISITIONS AND DIVESTMENTS
The Company entered into separate option and sale agreements with Metal Hawk Limited (ASX:
MHK) over its Yarmany West tenure as announced to the ASX on 5 July 2023, and Dundas
Minerals Limited (ASX: DUN) over its Baden Powell and Windanya tenements as announced to
the ASX on 30 August 2023. Both options are for a term of 24 months and should either or both
parties exercise their respective options, there is potential for Horizon to receive additional
revenue via cash and/or shares. For further information please refer to the respective
announcements.
Horizon and Poseidon Nickel Limited (ASX: POS) (Poseidon) have agreed to a merger to be
conducted by way of Schemes of Arrangement under the Corporations Act 2001 (Cth) (subject
to POS shareholder approval and court approval), whereby Horizon will acquire 100% of the fully
paid ordinary shares in Poseidon (Share Scheme) and 100% of the unlisted Poseidon options
(Options Scheme, and together with the Share Scheme, the Schemes), subject to the satisfaction
of various conditions.
The proposed transaction will consolidate Horizon’s large gold resource and Poseidon’s Black
Swan processing infrastructure in the Kalgoorlie-Coolgardie-Lake Johnston districts. The
combination provides a pathway for sustainable, long-term gold production and cashflow as an
independent mid-cap producer.
RICHMOND VANADIUM PROJECT
The Richmond Vanadium Project is located 650 km west of Townsville and 250 km east of Mt
Isa in NW Queensland (Figure 5) and is owned 100% by RVT with Horizon owning 8.94% of
RVT. The project tenements cover ~1,400 km2 of Cretaceous Toolebuc Formation and the
advanced Lilyvale deposit north of Richmond.
As announced to the ASX on the 13 December 2022, RVT (ASX: RVT) completed its IPO raising
$25 million (before costs) and listed on the ASX. As part of the IPO, eligible Horizon shareholders
were issued 20 million RVT shares via an in-specie distribution with 19.8 million RVT shares
Page 9 of 26
HRZ QUARTERLY DEC 2025
retained by the Company representing 8.94% of RVT’s issued capital. The current value of the
Company’s holding in RVT can be seen in the Corporate / Finance section below.
Figure 5: Richmond Vanadium Project location and surrounding infrastructure
For more information on Richmond Vanadium Technology and the project, we refer you to their
website at www.richmondvanadium.com.au or the ASX under ticker code RVT.
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
The Company recognises the importance of Environment, Social and Governance (ESG) factors
and is committed to continuous improvement in this regard. During the quarter, a review
continued of all internal policies, procedures, and governance principles to identify improvements
and opportunities to ensure we meet or exceed our corporate license to operate.
The Company previously worked with BDO Global to conduct an analysis of the business to
identify opportunities to improve the Company’s ESG performance. Materiality surveys were
completed for both internal and external stakeholders and completed a workshop to map the
opportunities and generate an initial sustainability report. The aim of the process is to develop
systems and processes to ensure we meet or exceed our social license to operate and adopt the
sustainability report covering current and future activities.
Final mining approvals were received for Phillips Find early in the quarter.
Flora and Fauna surveys have been undertaken during quarter near Burbanks South.
CORPORATE / FINANCE
In line with the ASX compliance reporting the Company released its Annual Report and Corporate
Governance Statement 2024 during the quarter.
Total cash at bank as at 31 December 2024 was A$9.6 million. In addition, the Company holds
investments in ASX listed companies with a current value of approximately A$6.32 million (Table
7). The Company sold the second tranche of its listed investments in Ora Banda Mining Limited,
selling 1,063,094 shares for proceeds of $894,147. During the quarter, the Company announced
Page 10 of 26
HRZ QUARTERLY DEC 2025
a two tranche share placement of $14.0m to institutions and sophisticated investors to support
the proposed merger of the Company and Poseidon Nickel Limited. 19
As previously announced to the ASX on 19 October 2022 and 23 November 2022, the Company
executed financial agreements with Nebari LLC for a US$5 million Convertible Loan Facility in
two tranches of US$2 million and US$3 million respectively. Both tranches have been drawn
down. For further information and terms of the Loan Agreement, we refer you to the ASX
announcement dated 19 October 2022.
In accordance with ASX Listing Rule 5.3.5, A$15k was paid to related parties or their associates
during the quarter, comprising Non-executive and Executive Director fees and superannuation.
Table 3: Issued Share Capital
Issued at 31 December
2024
1,429,670,213
Class of securities
Fully Paid Ordinary Shares (HRZ)
Listed Options (HRZOB, strike price 9.7c, expiry 30 Jun 2025)
51,871,015
Listed Options (HRZO, strike price 8.7c expiry 21 Sep 2025)
26,723,151
Director & Employee Performance Rights
26,004,600
Table 4: Listed Company Investments
Company
Number
Value at 31 December 2024
Richmond Vanadium Tech.
19,833,363
1
$5,156,674
Ora Banda Mining
2,126,182 2
$691,011
Metal Hawk Limited
1,134,430 3
$363,018
Dundas Minerals Limited
3,234,327 4
$109,967
TOTAL
$6,320,670
1.
Mandatory escrow was lifted on 13 December 2024.
2.
In mandatory escrow for 3, 6 and 9 months (3 equal tranches out of mandatory escrow 9 July 2024, 9 October
2024 and 9 January 2025). Tranche 2 sold during the quarter, one tranche remains.
3.
Liquid asset
4.
Liquid Asset
This quarterly report has been authorised by the board of directors for release.
Julian Tambyrajah
CFO & Company Secretary
29 January 2025
For further information contact Horizon on:
T: + 61 8 9386 9534
19 As announced to the ASX on 25 October 2024 and see Forward-looking and Cautionary Statement on Page 26.
Page 11 of 26
HRZ QUARTERLY DEC 2025
APPENDICES
TENEMENT SCHEDULE – DECEMBER 2024
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
L26/261
100%
-
-
M26/346
100%
-
-
M26/499
100%
-
-
M26/549
100%
-
-
M26/621
100%
-
-
P26/4256
100%
-
-
P26/4579
100%
-
-
P26/4580
100%
-
-
MLA26/855
100%
-
-
PLA26/4318
100%
-
-
E26/220
100%
-
-
P24/5143
100%
-
-
P24/5144
100%
-
-
P24/5145
100%
-
-
P24/5146
100%
-
-
P24/5147
100%
-
-
P24/5148
100%
-
-
P24/5149
100%
-
-
P24/5150
100%
-
-
P24/5151
100%
-
-
P24/5152
100%
-
-
P24/5153
100%
-
-
P24/5154
100%
-
-
P24/5155
100%
-
-
P24/5156
100%
-
-
P24/5157
100%
-
-
P24/5158
100%
-
-
P24/5159
100%
-
-
P24/5160
100%
-
-
P24/5348
100%
-
-
P24/5415
100%
-
-
P24/5637
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BINDULI
BLACK FLAG
Page 12 of 26
HRZ QUARTERLY DEC 2025
TENEMENT SCHEDULE – DECEMBER 2024 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
P24/5638
100%
-
-
P24/5639
100%
-
-
P24/5640
100%
-
-
E70/5980
100%
-
-
E70/5981
100%
-
-
E70/6551
100%
100%
-
ELA70/6552
100%
-
-
ELA70/6553
100%
-
-
E70/6554
100%
-
-
ELA70/6555
100%
-
-
E25/349
100%
-
-
E25/543
100%
-
-
E25/564
100%
-
-
L25/48
100%
-
-
L25/50
100%
-
-
L25/51
100%
-
-
M25/182
100%
-
-
M25/327
100%
-
-
M25/329
100%
-
-
M25/330
100%
-
-
M25/333
100%
-
-
M25/357
100%
-
-
P25/2365
-
-
100%
P25/2449
100%
-
-
P25/2633
100%
-
-
P25/2670
100%
-
-
P25/2733
100%
-
-
P25/2748
100%
-
-
P25/2755
100%
-
-
P25/2761
100%
-
-
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
BLACK FLAG
BRIDGETOWN-GREENBUSHES
CANNON GOLD MINE
CHADWIN
P16/3121
Page 13 of 26
HRZ QUARTERLY DEC 2025
TENEMENT SCHEDULE – DECEMBER 2024 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E16/589
100%
-
-
E16/590
100%
-
-
E16/591
100%
-
-
E16/592
100%
-
-
LA15/429
100%
-
-
LA15/430
100%
-
-
M26/41
100%
-
-
M26/433
100%
-
-
M26/534
100%
-
-
L27/88
100%
-
-
M27/485
100%
-
-
P26/4156
100%
-
-
P26/4535
100%
-
-
P27/2380
100%
-
-
P27/2381
100%
-
-
G27/1
100%
-
-
L27/90
100%
-
-
L27/91
100%
-
-
L27/92
100%
-
-
L27/93
100%
-
-
M27/156
100%
-
-
M15/1204
100%
-
-
M15/652
100%
-
-
P15/6380
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
COOLGARDIE
GOLDEN RIDGE (NIMBUS)
KALPINI
KANOWNA BELLE (NIMBUS)
PENNY’S FIND
ROSE HILL
Page 14 of 26
HRZ QUARTERLY DEC 2025
TENEMENT SCHEDULE – DECEMBER 2024 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E26/209
100%
-
-
P26/4316
100%
-
-
P26/4317
100%
-
-
P26/4319
100%
-
-
P26/4320
100%
-
-
P26/4321
100%
-
-
P26/4322
100%
-
-
P26/4323
100%
-
-
P26/4324
100%
-
-
P26/4325
100%
-
-
P26/4326
100%
-
-
P26/4327
100%
-
-
P26/4328
100%
-
-
P26/4329
100%
-
-
P26/4330
100%
-
-
P26/4331
100%
-
-
P26/4332
100%
-
-
P26/4333
100%
-
-
P26/4334
100%
-
-
P26/4335
100%
-
-
P26/4336
100%
-
-
P26/4337
100%
-
-
P26/4338
100%
-
-
P26/4339
100%
-
-
P26/4340
100%
-
-
P26/4341
100%
-
-
P26/4342
100%
-
-
P26/4343
100%
-
-
P26/4344
100%
-
-
P26/4345
100%
-
-
P26/4350
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
LAKEWOOD
Page 15 of 26
HRZ QUARTERLY DEC 2025
TENEMENT SCHEDULE – DECEMBER 2024 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
100%
-
-
100%
-
-
100%
-
-
M24/919
100%
-
-
M24/959
100%
-
-
P24/4817
100%
-
-
P24/5046
100%
-
-
P24/5464
100%
-
-
P24/5507
100%
-
-
P24/5508
100%
-
-
MLA24/1004
100%
-
-
E15/1655
100%
-
-
E16/494
100%
-
-
E16/497
100%
-
-
E16/503
100%
-
-
E16/506
100%
-
-
E16/507
100%
-
-
E16/510
100%
-
-
E16/519
100%
-
-
E16/521
100%
-
-
E16/525
100%
-
-
E16/526
100%
-
-
P16/3212
100%
-
-
P16/3213
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
WHITE FLAG
E26/168
M26/616
P26/4079
1
WINDANYA
YARMANY
YARMANY
Page 16 of 26
HRZ QUARTERLY DEC 2025
TENEMENT SCHEDULE – DECEMBER 2024 continued
Percentage interest
held at the end of the
quarter
Percentage interest
acquired during the
quarter
Percentage
interest disposed
during the quarter
E25/511
100%
-
-
L25/32
100%
-
-
L25/35
100%
-
-
L25/36
100%
-
-
L26/240
100%
-
-
L26/252
100%
-
-
L26/266
100%
-
-
L26/270
100%
-
-
L26/274
100%
-
-
L26/275
100%
-
-
M25/355
100%
-
-
M26/29
100%
-
-
M26/161
100%
-
-
M26/277
100%
-
-
M26/318
100%
-
-
M26/490
100%
-
-
M26/598
100%
-
-
P25/2393
100%
-
-
P25/2394
100%
-
-
P25/2403
100%
-
-
P25/2404
100%
-
-
P25/2405
100%
-
-
P25/2450
100%
-
-
P25/2469
100%
-
-
P25/2470
100%
-
-
P25/2471
100%
-
-
P25/2472
100%
-
-
P25/2473
100%
-
-
P25/2474
100%
-
-
P25/2475
100%
-
-
P25/2526
100%
-
-
P25/2551
100%
-
-
P25/2552
100%
-
-
Prospect/Tenement
Notes
WESTERN AUSTRALIA
NIMBUS/BOORARA
Page 17 of 26
HRZ QUARTERLY DEC 2025