Interim Financial Report Half Year as at 31 Deecember 2024
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
6 MARCH 2025
INTERIM FINANCIAL REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2024
Horizon Minerals Limited (ASX: HRZ) encloses its Interim Financial Report for the half year ended
31 December 2024.
For further information please contact Julian Tambyrajah.
By order of the board
Julian Tambyrajah
Chief Financial Officer &
Company Secretary
julian.tambyrajah@horizonminerals.com.au
Phone +61 8 9386 9534
Level 2, Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
F: +61 8 9389 1597
E: info@horizonminerals.com.au
www.horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
Interim Financial Report
for the Half-year ended
31 December 2024
Contents
Corporate Information ................................................................................................................ 1
Directors’ Report ........................................................................................................................ 2
Auditor’s Independence Declaration ........................................................................................ 13
Consolidated Statement of Profit or Loss and Other Comprehensive Income ......................... 14
Consolidated Statement of Financial Position.......................................................................... 15
Consolidated Statement of Changes in Equity ......................................................................... 16
Consolidated Statement of Cash Flows .................................................................................... 17
Notes to the Financial Statements ............................................................................................ 18
Directors' Declaration ............................................................................................................... 25
Independent Auditor’s Review Report ..................................................................................... 26
Interim Financial Report
for the Half-Year ended 31 December 2024
Corporate Information
Directors
Ashok Parekh
Warren Hallam
Grant Haywood
Non-Executive Chairman
Non-Executive Director
Managing Director and Chief Executive Officer
Chief Financial Officer & Company Secretary
Julian Tambyrajah
Registered Office & Principal Place of Business
Level 2
16 Ord Street
West Perth WA 6005
T: +61 8 9386 9534
E: info@horizonminerals.com.au
W: horizonminerals.com.au
Share Registry
Computershare Investor Services Pty Ltd
Level 17
221 St George’s Terrace
Perth WA 6000
T: +61 8 9323 2000
W: computershare.com.au
Auditors
PKF Perth
Level 8
905 Hay Street
Perth WA 6000
T: +61 8 9426 8999
Stock Exchange Listing
Australian Securities Exchange
Home Exchange: Perth
ASX Code: HRZ
1
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
The Directors present their report together with the financial report of the consolidated entity (referred to as the
Group) consisting of the parent entity, Horizon Minerals Limited (the Company or Horizon), and the entities it
controlled, for the six months ended 31 December 2024 and the independent auditor’s review report thereon.
Directors
The Directors of the Company, both during and since the end of the period, are set out below:
Name
Period of Directorship
Mr Ashok Parekh
Non-Executive Chairman
Appointed 14 June 2019
Chairman since 1 July 2020
Mr Warren Hallam
Non-Executive Director
Appointed 1 September 2024
Mr Grant Haywood
Managing Director and Chief
Executive Officer
Appointed 18 June 2024
Mr Chris Hansen
Non-Executive Director
Appointed 18 June 2024
Resigned 20 September 2024
Mr Jonathan Price
Non-Executive Director
Appointed 1 January 2016
Resigned 31 August 2024
Principal Activities
The principal continuing activities of the Group during the period included:
Development and production of the Boorara-Cannon Open Pit Gold Mine;
Development of the Phillips Find Open Pit Gold Project; and
Exploration and evaluation of the Group’s other gold projects and mineral tenements in numerous locations
across Australia.
Review and results of operations
The Group made an after-tax loss of $4,333,130 (December 2023: profit of $1,407,595) for the six-month period
ended 31 December 2024.
Boorara Open Pit Gold Project
The Boorara Gold Project is located 15km east of Kalgoorlie-Boulder (Figure 1) adjacent to the Super Pit, and 1km
southwest of the Nimbus Silver-Zinc Project site where established offices are connected to mains power and
existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with bounding shear
zones and late-stage cross faults. Mineralisation occurs as northwest dipping sheeted and stockwork quartzcarbonate vein arrays within the quartz dolerite host rocks, and steeply dipping zones along sheared geological
contacts trending to the north-northwest.
2
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Boorara Open Pit Gold Project (continued)
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Table 1: Boorara Mineral Resource Estimate 1
Boorara at 0.5 g/t lower cut-off grade
Resource category
Tonnes (Mt)
Grade (g/t Au)
Gold Metal (Oz)
Measured
1.12
1.22
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
1 As announced to the ASX on 1 August 2024.
3
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Boorara Open Pit Gold Project (continued)
The Ore Reserve for Boorara is shown in Table below
Table 2: Boorara Ore Reserve 2
Location
Boorara Open Pit
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal
(kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
The company is not aware of any new information or data that materially affects the information presented and that
the material assumptions and technical parameters underpinning the Boorara Ore Reserve Study continue to apply
and have not materially changed.
During the half-year the first campaign of grade control drilling was completed and assays returned. Mining
commenced across pit 2 and pit 4 with the first ore stockpile of 54kt constructed. Grade determination drilling and
assaying were completed, and haulage to the Paddington Gold Mill commenced in December 2024 and was
completed during January 2025. First ore was processed at a grade of 0.8 g/t Au and a recovery of 92.54% for
approximately 1,240 oz recovered for the initial stockpile estimate at a spot gold price of A$4,256/oz.3
Phillips Find Open Pit Gold Project
The project is centred 45kms north-northwest of Coolgardie (Figure 1) covering over 10km strike of prospective
greenstone stratigraphy, and includes the Phillips Find Mining Centre (PFMC) where approximately 33,000oz of
gold was produced between 1998 and 2015 from three open‐pit operations; Bacchus Gift, Newhaven and
Newminster.
Under the Joint Venture (JV) Agreement between Horizon Minerals and BML Ventures Pty Limited all
management, technical, operational and maintenance roles will be undertaken by BML with oversight by the
Company. This is a low financial risk JV structure for Horizon with BML to fund all project costs. Net cashflow
after asset recovery and repayment of costs will be split 50/50 between Horizon and BML. This allows Horizon
to focus 100% on delivering its Boorara gold project.
During the December 2024 quarter, equipment mobilisation, site establishment and mining approvals were
completed with the commencement of grade control drilling and pre-strip and mining of cutbacks to two existing
pits, Newhaven and Newminster (Figure 2).4 An existing 200kt Toll Milling Agreement executed with FMR
Investments Pty Ltd (FMR) in May 2024 will be utilised for ore processing.4 Subsequent to reporting date, it was
announced that the first ore was processed at Phillips Find followed by the first gold pour at FMR’s Greenfields mill
in late February 2025.5
2 As announced to the ASX on 1 August 2024.
3 As announced to the ASX on 3 October and 10 December 2024.
4 As announced to the ASX on 13 November 2024.
5 As announced to the ASX on 26 February 2025.
4
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Phillips Find Open Pit Gold Project (continued)
Figure 2: The Newminster and Newhaven Open pits at Phillips Find, January 2025 (subsequent to
reporting date).
Pennys Find Gold Project
The Pennys Find Gold Project is located 50km northeast of Kalgoorlie-Boulder and is accessed via public roads
(Figure 1). The high-grade gold mineralisation at Pennys Find is hosted in thin quartz veins at the contact
between footwall sediments including black shales and siltstones and a hangingwall basalt. The quartz veins
dip about 60° to the northeast, with a 1m to 5m true width.
Open cut mining to 85m depth (242mRL) was completed by Empire Resources in 2018 with toll treatment
processing being undertaken at the Lakewood (Kalgoorlie) and Burbanks (Coolgardie) plants. Production from
the open pit totalled more than 18,300oz at 4.47g/t Au (as announced to the ASX by Empire (ASX: ERL) on 25
July 2018).
During the period a Prefeasibility Study (PFS) for Pennys Find was completed that shows a financially viable
project highlighted by the following:6
o
Underground mine design and schedule producing 329.9kt at a fully diluted grade of 3.2g/t Au for
33.5koz over an approximate 23 month mine life
o
Metallurgical recovery of 88.9% producing 29.8koz recovered under an assumed third party toll
milling arrangement in the region
o
The project generates $24.0M in free cash flow (after capital) at a gold price of A$3,600/oz
6 As announced to the ASX on 18 December 2024.
5
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Pennys Find Open Pit Gold Project (continued)
Metallurgical test work and toll milling data has shown fresh mineralisation to be free milling with a high gravity
recoverable gold component and a total gold recovery which has historically exceeded 90%. Horizon has used
a metallurgical recovery of 88.9% for this study.
The Mineral Resource Estimate (JORC 2012) for Pennys Find is shown below : 1
Table 3: Pennys Underground (<260mRL) Mineral Resource Estimate, 1.5g/t Au cut off
Pennys Find at 1.5g/t Au lower cut-off grade
Resource category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (koz)
Indicated
305
5.19
51
Inferred
123
3.02
12
Total
429
4.57
63
The maiden Ore Reserve contains 99.7% of the ounces within the production target of the PFS, which stands
at 328.3kt at 3.2g/t Au for 33.4koz. 6 Horizon conducted the Study as of 17 December 2024. The Study was
prepared within an accuracy of ±15%, considered all relevant mining modifying factors, allowing an Ore Reserve
to be estimated in accordance with the JORC Code. Classification of the estimate is shown in Table 4.7
Table 4: Ore Reserve Statement
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (koz)
Proven
0
0
0
Probable
328.3
3.2
33.4
Total
328.3
3.2
33.4
Exploration
During the period, minimal emphasis was placed on exploration drilling, as resources and expenditures focused
on activities aimed at advancing projects into production and generating cash flow for the Company.
The Horizon Group Mineral Resources Statement following the completion of the merger with Greenstone
Resources Limited (formerly ASX: GSR) in June 2024 currently stand at:8
•
1.8Moz gold
•
20.2Moz silver, 104kt zinc
•
283kt nickel, 40.5kt cobalt and 296.2kt manganese (50% owned)
For details on the drilling programs, we refer you to the announcements released on the ASX and on the
Company’s website (www.horizonminerals.com.au).
7 As announced to the ASX on 18 December 2024, also Tables on pages 3-5, Competent Persons Statement on Pages 17 of that
announcement.
8 As announced to the ASX on 1 August 2024, also see Tables and Confirmations on Pages 14-15 of the announcement
.
6
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Exploration (continued)
Nimbus Silver-Zinc project
The Nimbus silver-zinc project is adjacent to the Boorara gold mine, 17km east-southeast of Kalgoorlie-Boulder
in the goldfields of Western Australia (Figure 1). The Nimbus Project is located 2km east of the Company’s
cornerstone Boorara project. The Nimbus mine site is on granted mining leases M26/490 and M26/598 and
easily accessed from the Kalgoorlie-Bulong Road via an unsealed haul road. The Nimbus Project was previously
mined in two stages from January 2004 - May 2006. Ore treatment was undertaken at an onsite mill utilising a
Merrill-Crowe circuit. The Nimbus Silver-Zinc Project was placed on care and maintenance in 2007 after
producing 3.6Moz of silver from 318kt of ore at a grade of 353g/t Ag.
MacPhersons Resource Limited (MRP) completed due diligence in August 2011 purchasing the Nimbus property
on 8 September 2011 from Kalgoorlie Ore Treatment Company Pty Ltd (KOTC). In June 2019 Intermin
Resources Limited finalised its merger with MRP, becoming Horizon Minerals Ltd.
The original Nimbus Mill was subsequently removed and the area rehabilitated. The mine office and other
infrastructure is still in place and operational on grid power and is currently being used by the management and
technical teams operating the Boorara mine.
As a consequence of the historic mining and processing of ore, Nimbus was classified by the Department of
Water and Environmental Regulation (DWER) in 2006 as a ‘Contaminated – Remediation Required’ site under
the Contaminated Sites Act.
Following the merger with MacPherson Resources in 2019, Horizon undertook a Mandatory Audit Review
process under the Contaminated Sites Act and began to carry out cleanup works to reclassify the site. The
Company completed the clean-up in 2022, and the Mandatory Audit Review (MAR) report was completed and
submitted to DWER to reclassify the site during the current September 2024 quarter. The MAR report is currently
under assessment.
An independent review by Australian Mining Consultants (AMC) and Sedgmen was commissioned in 2022 to
assess the historic data, mine optimisations and metallurgical work to evaluate the optimal pathway forward for
the project. The review highlighted the potential of the project through underground mining of the fresh highergrade ore below the historical Discovery pit and generating a silver and a zinc concentrate for sale to potential
offtake partners. A gold concentrate was also assessed to improve overall life of mine given the need for
additional tonnage to underpin the construction of a concentrator at site.
Exploration
Given the drilling success to date along the Gretel-Nimbus-Brindabella trend and the potential for repeat high
grade lenses at Nimbus deeps and along strike, a drilling campaign has been designed to assess untested
drilling targets identified below the Nimbus pits.(Figure 3 and Long section through showing open zones down
dip/plunge extension Figure 4).9
9 As announced to the ASX on 28 August 2024.
7
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Exploration (continued)
Nimbus Silver-Zinc project (continued)
Figure 3: Long section through Ag Lode 211 showing down dip/plunge extension
Figure 4: Long section through showing open zones down dip/plunge extension
8
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Exploration (continued)
Richmond Vanadium Project
The Richmond Vanadium Project is located 650 km west of Townsville and 250 km east of Mt Isa in NW
Queensland (Figure 5) and is owned 100% by RVT with Horizon owning 8.94% of RVT. The project tenements
cover ~1,400 km2 of Cretaceous Toolebuc Formation and the advanced Lilyvale deposit north of Richmond.
As announced to the ASX on the 13 December 2022, RVT (ASX: RVT) completed its IPO raising $25 million
(before costs) and listed on the ASX. As part of the IPO, eligible Horizon shareholders were issued 20 million
RVT shares via an in-specie distribution with 19.8 million RVT shares being issued and retained by the Company
representing 8.94% of RVT’s issued capital. The current value of the Company’s holding in RVT is contained in
the Corporate / Finance section below.
Figure 5: Richmond Vanadium Project location and surrounding infrastructure
For more information on Richmond Vanadium Technology and the project, we refer you to their website at
www.richmondvanadium.com.au or the ASX under ticker code RVT.
9
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Review and results of Operations (continued)
Corporate
Scheme of Arrangement to acquire Poseidon Nickel Limited
As announced on 25 October 2024, Horizon and Poseidon Nickel Limited (ASX: POS) executed a binding
Scheme Implementation Deed for the implementation of a Scheme of Arrangement under which Horizon agreed
to acquire 100% of the issued and to be issued share capital of POS. The implied scheme consideration of $0.06
per share was based on a 40% premium to the 30-day volume weighted average price (VWAP) of $0.0042 per
POS share for the period up to 22 October 2024.
As announced on 19 February 2025, Horizon completed the acquisition of POS and under the Scheme:
•
•
each POS shareholder elected to receive 0.1156 Horizon shares for every 1 POS share held; and
each POS optionholder (other than holders of POS Incentive Options) elected to receive 0.1156 Horizon
options for every 1 POS option held.
As a result of the successful implementation of the arrangement Horizon issued 491,420,460 shares and
18,892,646 options. A further 4,444,444 shares were issued to Horizon’s advisors for the transaction advisory
fees.
Horizon now holds two strategically located processing facilities at Black Swan and Lake Johnston and the
transaction brings together complementary assets. The Black Swan processing plant has a 2.2Mtpa nickel
sulphide concentrator and associated infrastructure and is ideally located as a central processing hub for
Horizon’s gold projects as well as for regional toll treatment opportunities. The Black Swan concentrator will also
unlock value for Horizon’s high-grade Nimbus silver, zinc and gold project which contains 20.2Moz of silver,
78koz gold and 104kt of zinc.
A Feasibility Study on the refurbishment and conversion of the Black Swan processing plant to gold production
from Horizon’s large baseload and satellite gold deposits will be undertaken. The Feasibility Study is expected
to be completed in the second half of 2025 with first gold production from Black Swan currently targeted for mid2026.
Further details of the acquisition can be found in the subsequent events section of the Director’s Report and
Note 13 to the financial statements.
Board and management
The Company announced the following Board and management changes during the period:
• Appointment of experienced mining executive and director, Mr Warren Hallam, as Non-Executive
Director of the Company effective 1 September 2024;
• Resignation of Mr Chris Hansen as Non-Executive Director of the Company effective 20 September
2024; and
• Resignation of Mr Jonathan Price as Non-Executive Director of the Company effective 31 August 2024.
10
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Cash balance
Group cash on hand was $10,182,562 as at 31 December 2024 (30 June 2024: $4,290,214).
Issued Capital
As at 31 December 2024, Horizon had 1,429,670,213 fully paid ordinary shares on issue (June 2024:
1,118,559,102). Significant movements in the issued capital during the period included the issue of 311,111,111
ordinary shares at a price $0.045 per ordinary share via a two-tranche placement to raise $14,000,000.
Share options and rights
Unissued shares – options
At 31 December 2024, unissued shares of the Company under option are:
Class of security
ASX
Code
Exercise
Price
Expiry
Date
Number
on issue
Listed options
HRZOB
$0.097
30 Jun 2025
51,871,015
Listed options
HRZO
$0.087
21 Sep 2025
26,723,151
Unissued shares – performance rights
The Company granted 26,004,600 rights during the period expiring no later than 30 November 2027 to senior
executives and staff. Each performance right constitutes a right to receive one ordinary share in the capital of
Horizon, subject to meeting certain conditions.
Company Investments
The Company held the following listed investments at 31 December 2024.
Company
Dundas Minerals Ltd
Metal Hawk Ltd
Richmond Vanadium Technology Ltd
Ora Banda Mining Ltd
Securities
Ordinary
shares
Ordinary
shares
Ordinary
shares
Ordinary
shares
ASX
Code
Number of
shares held
Fair value
at 31 Dec 2024(a)
DUN
3,234,327
$113,202
MHK
1,134,430
$317,640
RVT
19,958,992
$4,690,363
OBM
1,068,094
$694,261
$5,815,466
(a) The fair value of listed investments held is based on quoted market prices at the end of the reporting period. These
investments were irrevocably designated at fair value through profit or loss as the Group considers these investments
as held for trading.
11
Interim Financial Report
for the Half-Year ended 31 December 2024
Directors’ Report
Significant events after the balance date
Acquisition of Poseidon Nickel Limited (POS)
On 19 February 2025, the Company announced that the acquisition of POS was completed following the
implementation of a Scheme of Arrangement under which Horizon agreed to acquire 100% of the issued and to
be issued share capital of POS. The implied scheme consideration of $0.06 per share was based on a 40%
premium to the 30-day volume weighted average price (VWAP) of $0.0042 per POS share for the period up to
22 October 2024.
Under the Scheme:
•
•
each POS shareholder elected to receive 0.1156 Horizon shares for every 1 POS share held; and
each POS optionholder (other than holders of POS Incentive Options) elected to receive 0.1156 Horizon
options for every 1 POS option held.
As a result of the successful implementation of the arrangement Horizon issued 491,420,460 shares and
18,892,646 options. A further 4,444,444 shares were issued as advisory fees.
At the date of this report the initial asset acquisition accounting is incomplete and as such no disclosures have
been made about the allocation of consideration to identifiable assets and liabilities.
Issue of shares
On 10 January 2025, the Company announced a Private Placement (Placement) for the issue of 213,888,888 new
fully paid ordinary shares at an issue price of $0.045 per share to raise $9,625,000 (before costs). The Placement
was completed in two tranches:
• Tranche 1: 141,000,000 new fully paid ordinary shares were issued on 13 January 2025 to raise
$6,345,000 (before costs); and
• Tranche 2: 72,888,888 new fully paid ordinary shares were issued on 20 February 2025 to raise
$3,280,000 (before costs).
The funds raised have, and are to be used, to fund existing and further project development and potentially for the
retiring or refinancing of debt.
First gold pour at Boorara Gold Project
On 15 January 2025, the Company announced its first gold pour from the Boorara Gold Project under the Ore Sale
Agreement with Paddington Mill.
First gold pour at Phillips Find Gold Project
On 26 February 2025, the Company announced its first gold pour from the Phillips Find Gold Project was processed
under a Toll Milling Agreement with FMR Investment Greenfields Mill.
Auditor’s Independence Declaration
In accordance with section 307C of the Corporations Act 2001, the Directors have obtained a declaration of
independence from PKF Perth, the Group’s auditors, as presented on page 13 of this half-year’s financial report.
Signed in accordance with a resolution of Directors.
Ashok Parekh
Non-Executive Chairman
5 March 2025
12
PKF Perth
ABN 64 591 268 274
Dynons Plaza,
Level 8, 905 Hay Street,
Perth WA 6000
PO Box 7206,
Cloisters Square WA 6850
Australia
+61 8 9426 8999
perth@pkfperth.com.au
pkf.com.au
AUDITOR’S INDEPENDENCE DECLARATION
TO THE DIRECTORS OF HORIZON MINERALS LIMITED
In relation to our review of the financial report of Horizon Minerals Limited for the half year ended 31
December 2024, to the best of my knowledge and belief, there have been no contraventions of the auditor
independence requirements of the Corporations Act 2001 or any applicable code of professional conduct.
PKF PERTH
SIMON FERMANIS
PARTNER
5 March 2025
PERTH,
WESTERN AUSTRALIA
PKF Perth is a member of PKF Global, the network of member firms of PKF International Limited, each of which is a separately owned legal entity
and does not accept any responsibility or liability for the actions or inactions of any individual member or correspondent firm(s). Liability
limited by a scheme approved under Professional Standards Legislation.
13
Interim Financial Report
for the Half-Year ended 31 December 2024
Consolidated Statement of Profit or Loss and Other
Comprehensive Income
Note
Sales revenue
Other income
Changes in inventories of finished goods and work in progress
Mine operations costs
Employee benefits expense
Exploration and evaluation expenses
Corporate and administrative expenses
Depreciation and amortisation expenses
Net gain / (loss) on financial investments held at fair value
through profit or loss
Fair value (loss) / gain on derivative liability
(Loss) / profit before net finance expense and income tax
Finance income
Finance expense
Net finance expense
(Loss) / profit before income tax
Income tax
(Loss) / profit for the period
Other comprehensive income
Other comprehensive income for the period, net of income tax
Total comprehensive income attributable to members
of Horizon Minerals Limited
Basic (loss)/ earnings per share (cents)
Diluted (loss)/ earnings per share (cents)
4
7
5
5
31 Dec 2024
$
31 Dec 2023
$
632,878
180,932
6,784,419
3,662,142
(3,687,674)
(963,276)
(1,259,745)
(1,476,003)
(815,736)
1,308,535
(849,877)
(641,967)
(518,260)
(17,666)
(2,854,093)
(923,488)
(3,341,434)
98,310
2,000,866
27,237
(1,018,933)
(991,696)
(4,333,130)
60,332
(653,603)
(593,271)
1,407,595
(4,333,130)
1,407,595
-
-
(4,333,130)
1,407,595
(0.36)
(0.36)
0.20
0.19
The Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in conjunction with the accompanying notes.
14
Interim Financial Report
for the Half-Year ended 31 December 2024
Consolidated Statement of Financial Position
31 Dec 2024
$
30 Jun 2024
$
10,182,562
2,101,176
3,662,142
500,972
16,446,852
4,290,214
586,589
4,876,803
5,815,466
278,927
45,672,433
14,075,726
1,759,879
332,773
67,935,204
5,954,733
278,927
46,541,297
1,279,343
54,054,300
Total assets
84,382,056
58,931,103
Current liabilities
Trade and other payables
Convertible note liability and derivative
Lease liabilities
Employee entitlements
Total current liabilities
15,695,878
9,736,320
65,900
304,169
25,802,267
1,971,725
8,194,908
33,093
421,109
10,620,835
Non-current liabilities
Rehabilitation provisions
Employee entitlements
Lease liabilities
Total non-current liabilities
3,088,764
168,982
246,766
3,504,512
1,838,617
196,788
2,035,405
Total Liabilities
29,306,779
12,656,240
Net assets
55,075,277
46,274,863
93,639,218
146,567
(38,710,508)
55,075,277
80,559,064
93,177
(34,377,378)
46,274,863
Note
Current assets
Cash and cash equivalents
Trade and other receivables
Inventories
Other financial assets
Total current assets
Non-current assets
Financial investments at fair value through profit or loss
Other financial assets
Exploration and evaluation assets
Mine properties
Property, plant and equipment
Other assets
Total non-current assets
Equity
Issued capital
Reserves
Accumulated losses
Total equity
6
7
8
9
10
11
The Consolidated Statement of Financial Position should be read in conjunction with the accompanying notes.
15
Interim Financial Report
for the Half-Year ended 31 December 2024
Consolidated Statement of Changes in Equity
Contributed
Equity
$
Share Based
Payments
Reserve
$
Accumulated
Losses
$
Total
Equity
$
Balance at 1 July 2024
Loss for the period
Other comprehensive income for the period
Total comprehensive income for the period
80,559,064
-
93,177
-
(34,377,378)
(4,333,130)
(4,333,130)
46,274,863
(4,333,130)
(4,333,130)
Transactions with owners in their capacity as
owners:
Shares issued during the period
Shares issue costs
Share based payments
Balance at 31 December 2024
14,000,000
(919,846)
93,639,218
53,390
146,567
(38,710,508)
14,000,000
(919,846)
53,390
55,075,277
66,211,489
-
-
(30,919,881)
1,407,595
-
35,291,608
1,407,595
-
-
-
1,407,595
1,407,595
150,000
66,361,489
-
Balance at 1 July 2023
Profit for the period
Other comprehensive income for the period
Total comprehensive income for the period
Transactions with owners in their capacity as
owners:
Shares issued during the period
Shares issue costs
Reclassified to accumulated losses
Balance at 31 December 2023
150,000
(190)
(190)
(29,512,476) (36,849,013)
The Consolidated Statement of Changes in Equity should be read in conjunction with the accompanying notes.
16
Interim Financial Report
for the Half-Year ended 31 December 2024
Consolidated Statement of Cash Flows
31 Dec 24
$
31 Dec 23
$
Cash flows from operating activities
Receipts from customers
Payments to suppliers and employees
Interest received
Payments for exploration and evaluation expenditure
Payments for mine production costs
Withholding tax expense
Net cash outflow from operating activities
153,376
(2,621,600)
27,237
(2,457,120)
(1,494,763)
(37,524)
(6,430,394)
(5,209)
(1,282,133)
42
Share your feedback
Discover