First Ore To Be Processed - Boorara Gold Project
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
10 DECEMBER 2024
FIRST ORE TO BE PROCESSED - BOORARA GOLD PROJECT
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to provide an update
on the development of the Boorara Gold Project (“Boorara”).
HIGHLIGHTS
•
Horizon approved the development of Boorara in late July 2024 to mine a series of four open
pits containing 1.24Mt of ore at 1.24g/t Au for 49.5koz of gold 1
•
Boorara mining services and surface ore haulage contracts awarded to Hampton Transport
Services Pty Ltd on competitive terms, with no mining contractor payments until first gold
pour sold and funds received
•
Mining to occur over 14 months and processing over 19 months at Norton Gold Fields’
Paddington plant through an Ore Sale Agreement (OSA) to generate $30M in estimated free
cashflow at a A$3,600/oz gold price 1 2
•
Under the OSA, within five days of delivering ore to the Paddington ROM pad, Paddington to
pay Horizon 50% of gross revenue less estimated processing costs, based on the determined
grade for each stockpile, and
•
Within five days of Paddington fully treating the stockpile, a final revenue calculation shall be
made based on the determined grade, moisture and metallurgical recovery, less agreed costs
for processing, to calculate a final payment to Horizon
•
Gross revenue based on the average gold bid spot price reported by the Perth Mint at 16:59
hours on Tuesdays during the period between the first truck load hauled to Paddington and
final gold pour for the stockpile
•
Mining commenced in August 2024 on single shift, night shift commencing in October with
one digger shift, and mining now on four digger shifts
•
The tight WA labour market for operators has created some shortages of personnel and
delayed first ore by several weeks, but the operation is now fully manned up
•
The first ore stockpile of 54,380 tonnes has undergone assaying and metallurgical test work
and is being hauled to the Paddington mill for first gold production this month 2
Commenting on the mining progress, Managing Director and CEO Mr Grant Haywood said: 2
“It is very pleasing that we are transporting our first ore delivery from Boorara, with first revenue due
shortly. This milestone has been achieved despite the tight labour market during our ramp up phase
and some inclement weather. We are now fully manned up and the team has been making good
progress. We look forward to ongoing gold production from Boorara.
“In addition to Boorara, our Phillips Find project is progressing well and is on track for first ore delivery
to the Greenfields mill in February 2025”.
1
As announced to the ASX on 29 July 2024. 2 See Forward Looking and Cautionary Statements on Page 5.
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an update
on the development of the 100% owned Boorara Gold Project (“Boorara”). Boorara is located 15km
east of Kalgoorlie-Boulder, adjacent to the Super Pit, in the heart of the Western Australian goldfields
(Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
First ore is being hauled to the Paddington mill, with 54,380 tonnes of ore to be processed at an
expected grade of 0.8 g/t Au and a recovery of 94%, expected to contain approximately 1,400 oz
recovered @ AUD spot Au of $4,130 oz is estimated at $5.78 million gross revenue less processing
costs and royalties. This first stockpile grade is in line with expectations and grades are planned to
improve as the pits progress. Some ore was mined from Pit 2 (in the North) and Pit 4 (in the south)
to build this first stockpile.
The site team has worked diligently in drilling and assaying and working through the grade
determination process under the Ore Purchase Agreement. Our business partner Norton Gold Fields
have been very positive and proactive working with our site team through this process.
Next Steps 1
Haulage of the first stockpile is underway, with first revenue due shortly. As mining progresses,
additional ore shall be mined as the pits develop with grades expected to improve.
1
See Forward Looking and Cautionary Statements on Page 4.
Page 2 of 5
ASX ANNOUNCEMENT
Figure 2: First road trains loading ore with open pit operations in the background
Figure 3: First Boorara ore being loaded on route to Paddington Mill
Page 3 of 5
ASX ANNOUNCEMENT
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 4 of 5
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results, and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological, mining
and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations,
competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled
personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations
and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate
financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in
the announcement, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Page 5 of 5