BURBANKS DRILLING RETURNING SPECTACULAR GRADES
HIGHLIGHTS
• Underground mining at Burbanks historically produced 324koz @ 22.7g/t Au
• The historical production is in addition to the existing JORC (2012) Mineral Resource of:
o 6.1Mt grading 2.4g/t Au for 466koz 1
• Horizon commenced a 30,000m drilling program in late June 2025, with the initial 15,000m
targeting mostly infill to upgrade the existing resource. Eighteen of the planned 45 Phase 1
holes have been drilled with assays returned for 15 holes, with highlights as follows: 2
o 1.55m @ 99.65g/t Au from 336.3m including 0.4m @ 350.00 g/t Au from 336.7m
and 0.35m at 64.29g/t Au from 336.3m (25HBBD004)
o 5.3m @ 3.49g/t Au from 235.7m including 0.6m @ 19.22 g/t Au from 238.7m
(25HBBD004)
o 1.7m @ 37.18g/t Au from 71.0m (25HBBD004)
o 3.7m @ 5.13g/t Au from 222.4m including 0.57m @ 27.52g/t Au from 224.8m
(25HBBD004)
o 0.9m @ 12.65g/t Au from 278.2m, 0.3m @ 34.80g/t Au from 370.2m and 0.6m
@ 7.78g/t Au from 381.4m (25HBBD001)
o 7.2m @ 3.92g/t Au from 260.3m, 2.0m @ 4.86g/t Au from 280.0m and 4.0m
@ 12.75g/t Au from 366.1m (25HBBD002)
o 1.0m @ 31.63g/t Au from 106.0m (25HBBD005)
o 1.3m @ 15.01g/t Au from 335.3m (25HBBD008)
o 1.0m @ 19.84g/t Au from 285.0m (25HBBD013)
Commenting on the Burbanks drilling results, Managing Director and CEO Mr Grant Haywood said:3
“These spectacular high-grade intersections from our infill diamond drilling program further
demonstrate the exceptional quality of the orebody and underscores the potential of our Burbanks
project. Confirming such strong results within our existing resource area provides real assurance in
the project and demonstrates the opportunity to deliver improved resource confidence that will feed
directly into development studies, ultimately providing valuable high-grade feed to our 100% owned
Black Swan processing plant.”
1
As announced to the ASX on 1 August 2024 titled “Group Mineral Resources Statement – Amended”. See JORC Table 3. Burbanks
Gold Mineral Resources detailed on page 11.
2
As announced to the ASX on 26 June 2025 titled “Growth and Infill Drilling Underway at Burbanks”, see Competent Persons statement
on page 11. Note Intercepts are stated as downhole intervals, and due to the vertical nature of the ore body and restricted collar
locations are commonly at a low angle to the mineralisation
3
Refer Forward Looking and Cautionary Statements on page 13.
Page 2 of 27
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to provide an update
on the drilling program under way at its 100% owned high-grade Burbanks gold project, located 9km
south of Coolgardie in the Western Australian Goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Extensional and infill drilling commenced at Burbanks in late June 2025. Two phases of reverse
circulation (“RC”) and diamond drill programs for 30,000m is planned with Phase 1 drilling underway:
• Phase 1 comprises ~15,000m of infill drilling to enhance resource continuity and confidence
with results expected through to the March 2026 quarter
• Phase 2 comprises ~15,000m of extensional drilling, targeting along strike and down dip of
known high grade lodes with drilling commencing in early 2026
The Phase 1 infill program is targeting either side of the Main Lode, towards the Birthday Gift and
Burbanks North lodes to enhance resource continuity and resource confidence, and transition more
of the resource from the Inferred to Indicated category. This will facilitate the conversion of Ore
Reserves and the development of a mining plan, essential steps for project advancement at
Burbanks.
Page 3 of 27
ASX ANNOUNCEMENT
Figure 2: Burbanks Mining Centre showing the location of the completed holes in the current drill program
Phase 1 comprises 45 holes, with 18 holes completed to date for a total of 5,223m (Figure 2). Assay
results have been returned for the first 15 holes, and six holes have yielded intercepts with
exceptional grades (above 20g/t) along with visible gold in most holes (refer Figure 3). Highlights are
shown on the cover page, and full results in Table 1. Intercepts are stated as downhole intervals
and, due to the vertical nature of the ore body and restricted collar locations, are commonly at a low
angle to the mineralisation (refer Figure 5).
Page 4 of 27
ASX ANNOUNCEMENT
Figure 3: Visible gold in a quartz vein at 357.56m from hole 25HBBD004. The interval grades 0.4m @ 7.43g/t Au
from 357.4m (refer Table 1).
The Company confirms that the observations of native gold documented in the drill core
photograph in Figure 3 of this announcement are for illustrative purposes only and should not
be considered indicative of the grade or metal content of the mineralisation. Visual estimates
of mineral abundance should never be considered a proxy or substitute for laboratory analysis.
The accompanying laboratory assay results for this interval from hole 25HBBD004, are required
to determine grade of the mineralisation reported (0.4m @ 7.43g/t Au from 357.4m), and are
contained at Table 1 of this announcement.
Page 5 of 27
ASX ANNOUNCEMENT
Burbanks North
Infill drilling at Burbanks North has confirmed the position and grade of existing mineralisation lodes,
extended known high-grade mineralisation trends to the west and infilled along the margins of the
Mineral Resource Estimate. Furthermore, drilling has confirmed mineralisation continuity both to the
north, and in the area between Burbanks North and Main Lode, refer Figure 4.
Figure 4: SW NE schematic long section on local grid showing the location of the Main Lode and Burbanks
North, the current MRE categories, historical pierce points and recent drill traces with pierce points >1.0g/t
Page 6 of 27
ASX ANNOUNCEMENT
Figure 5: Cross-section on local grid (+/- 10m) showing hole 25HBBD004 and historical drilling with the down
hole gold intersections >1.0g/t.
Page 7 of 27
ASX ANNOUNCEMENT
Main Lode
Hole 25HBBD008 successfully targeted the downdip extension of the high-grade gold mineralisation
beneath the Main Lode at Burbanks. Drilling has extended the known trend 70m beneath the
historical workings, to a depth of 300m below surface (refer Figure 6). This result significantly
increases the confidence in the current geological model. Given that the closest existing drill holes
are located 100 metres to the north and south, further drilling is planned to fully define and delineate
this promising area.
Figure 6: A schematic cross-section on local grid (+/- 20m) with the down hole gold intersections >1.0 g/t in
25HBBD008. This hole shows the continuation of the mineralised structure 70m beneath the historical Main
Lode development.
Page 8 of 27
ASX ANNOUNCEMENT
Next Steps 1
A second diamond drilling rig was mobilised to Burbanks last week to accelerate the Phase 1 drilling
program, which is scheduled for completion in December 2025.
The Company will continue to update the market with assay results from Phase 1 as they become
available. All assay results are expected to be received by the end of the March 2026 quarter,
enabling the completion of an updated Mineral Resource Estimate in the June 2026 quarter. Ore
Reserve studies based on the improved confidence in resource classification from Inferred to
Indicated from the updated Mineral Resource Estimate will then follow.
The 15,000m Phase 2 extensional drilling program aimed at growing the resource base at Burbanks
is planned to commence early in 2026.
Drill Hole Tables
Table 1: Significant intervals for holes 25HBBD001-015. Intercepts are down hole and not true width and were
calculated based on a sample returning an assay value of greater than 1.0g/t Au over an interval no less than 0.2m
and no greater than 1.2m, with no more than 1m of internal dilution. Intervals are based on geology and no top
cut off was applied. No significant result is represented as NSI in the table. All other assays from the reported drill
holes were below the defined cut-off grade of 1.0 g/t Au and are not considered material for public reporting.
Hole ID From To Intercept
Width
Au g/t
25HBBD001 216.31 217.00 0.69 1.92
25HBBD001 218.53 219.10 0.57 1.71
25HBBD001 269.45 270.16 0.71 1.41
25HBBD001 276.00 277.00 1.00 1.62
25HBBD001 278.23 279.15 0.92 12.65
including 278.64 279.15 0.51 15.43
25HBBD001 282.66 283.29 0.63 2.96
25HBBD001 293.42 293.70 0.28 1.75
25HBBD001 295.74 296.74 1.00 2.24
including 296.29 296.74 0.45 3.47
25HBBD001 299.72 300.11 1.58 1.86
25HBBD001 370.19 370.52 0.33 34.80
25HBBD001 381.42 382.03 0.61 7.78
25HBBD001 410.00 411.00 1.00 1.28
25HBBD002 49.00 50.00 1.00 1.85
25HBBD002 149.00 150.00 1.00 2.78
25HBBD002 185.00 186.00 1.00 2.06
25HBBD002 260.33 267.51 7.18 3.92
including 262.00 266.28 4.28 5.75
including 266.60 267.00 0.40 4.18
1
Refer Forward Looking and Cautionary Statements on page 13.
Page 9 of 27
ASX ANNOUNCEMENT
Hole ID From To Intercept
Width
Au g/t
25HBBD002 280.00 282.00 2.00 4.86
including 280.00 280.42 0.42 13.87
and 281.00 282.00 1.00 3.49
25HBBD002 285.70 286.00 0.30 1.54
25HBBD002 302.00 303.00 1.00 1.80
25HBBD002 313.00 314.00 1.00 6.15
25HBBD002 318.29 319.47 1.18 1.99
25HBBD002 323.00 324.00 1.00 1.83
25HBBD002 351.91 352.65 0.74 5.95
25HBBD002 366.07 370.07 4.00 12.75
including 366.07 366.37 0.30 13.95
and 367.24 368.82 1.58 8.11
and 369.60 370.07 0.47 67.28
25HBBD003 80.00 81.00 1.00 2.72
25HBBD004 71.00 72.71 1.71 37.18
25HBBD004 120.68 121.23 0.55 4.27
25HBBD004 128.15 129.00 0.85 2.37
25HBBD004 222.37 226.06 3.69 5.13
including 224.85 225.42 0.57 27.52
25HBBD004 235.67 241.00 5.33 3.49
including 238.71 239.33 0.62 19.22
25HBBD004 253.74 255.34 1.60 1.80
25HBBD004 259.45 260.89 1.44 2.01
25HBBD004 280.46 281.23 0.77 1.07
25HBBD004 336.33 337.88 1.55 99.65
including 336.33 336.68 0.35 64.29
and 336.68 337.05 0.37 350.00
25HBBD004 357.37 358.50 0.40 7.43
25HBBD005 106 107 1.00 31.63
25HBBD005 302.24 303.03 0.79 2.74
25HBBD005 307 307.52 0.52 4.88
25HBBD006 87.89 88.43 0.54 1.54
25HBBD006 107 107.69 0.69 1.28
25HBBD006 189.9 190.54 0.64 2.79
25HBBD006 218.15 219 0.85 1.06
25HBBD007 155.00 156.00 1.00 1.11
Page 10 of 27
ASX ANNOUNCEMENT
Hole ID From To Intercept
Width
Au g/t
25HBBD007 332.00 333.00 1.00 1.27
25HBBD007 371.00 371.76 0.76 2.26
25HBBD008 331.45 333.50 2.05 1.03
25HBBD008 335.31 336.57 1.26 15.01
25HBBD009 NSI
25HBBD010 NSI
25HBBD011 169.56 170.14 0.58 4.93
25HBDD012 NSI
25HBBD013 45.62 46.46 0.84 1.14
25HBBD013 161.70 162.47 0.77 6.56
25HBBD013 215.58 216.36 0.78 3.34
25HBBD013 218.00 219.00 1.00 1.34
25HBBD013 285.00 286.00 1.00 19.84
25HBBD013 330.45 330.91 0.46 4.10
25HBBD014 97.12 97.48 0.36 3.00
25HBBD014 99.00 100.15 1.15 1.07
25HBBD014 102.20 102.50 0.3 2.28
25HBDD015 NSI
Table 2: Collar location details, in MGA94, Zone 51 and local mine grid.
Hole ID MGA94
East
MGA_94
North
Local
East
Local
North
RL Dip Azi EOH
(m)
25HBBD001 323328 6567168 2062 6967 380 -60.0 309 459.4
25HBBD002 323356 6567210 2055 7017 380 -60.0 309 462.8
25HBBD003 323392 6567278 2037 7092 382 -60.0 309 117.6
25HBBD004 323387 6567282 2031 7091 382 -62.9 308 430.1
25HBBD005 323057 6566759 2131 6481 386 -60.0 130 340.3
25HBBD006 323157 6566899 2113 6652 406 -56.9 310 303.0
25HBBD007 323086 6566803 2123 6533 385 -64.0 306 380.9
25HBBD008 322876 6566569 2122 6219 395 -69.0 307 396.7
25HBBD009 322833 6566544 2106 6172 399 -60.0 130 154.3
25HBBD010 322857 6566529 2134 6177 399 -60.3 128 119.1
25HBBD011 322785 6566487 2108 6097 399 -70.0 128 195.9
25HBBD012 322814 6566466 2144 6101 402 -60.0 130 110.4
25HBBD013 323364 6567656 1764 7356 393 -60.0 130 336.8
25HBBD014 323693 6568128 1697 7927 398 -60.0 130 219.7
25HBBD015 323494 6567950 1666 7662 401 -60.0 130 15.0
Page 11 of 27
ASX ANNOUNCEMENT
Table 3. Horizon Minerals Limited – Burbanks Gold Mineral Resources
Project
Cutoff Measured Indicated Inferred Total
Au ppm Mt Au ppm Ounces Mt Au ppm Ounces Mt Au ppm Ounces Mt Au ppm Ounces
Burbanks OP 0.5 1.43 2.02 92,800 3.43 1.86 204,900 4.86 1.90 297,700
Burbanks UG 2.5/2.0 0.12 4.26 16,700 1.07 4.39 151,200 1.19 4.38 167,900
Total 1.55 2.19 109,500 4.50 2.46 356,100 6.05 2.39 465,600
*Appropriate rounding applied.
Confirmation
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted from
and was originally reported in Horizon’s ASX announcement titled “Group Mineral Resource
Statement – Amended” (Burbanks, Phillips Find) 1 August 2024, which is available at
www.asx.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements and that all material
assumptions and technical parameters underpinning the estimates in those announcements
continue to apply and have not materially changed. The Company confirms that the form and context
of the Competent Person’s findings in relation to those Mineral Resources estimates or Ore
Reserves estimates have not been materially modified from the original market announcements.
Competent Persons Statement – Burbanks
The information in this document that relates to exploration results, geology and data compilation is
based on information compiled under the supervision and review of Mr. Stephen Guy, a Competent
Person who is a Member of The Australian Institute of Geoscientists (8203).
Mr. Guy is the Chief Geologist for Horizon Minerals, is a full-time employee of the Company and
holds shares and options in the Company. Mr. Guy has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Guy consents
to the inclusion in this announcement of the matters based on this information in the form and context
in which it appears.
The information in the report to which this statement is attached that relates to the estimation and
reporting of global gold Mineral Resources at the Burbanks deposits is based on information
compiled by Mr Glenn Poole, BSc, a Competent Person and a current Member of the Australian
Institute of Mining and Metallurgy. Mr Poole is Chief Geologist at Horizon Minerals Ltd and has
sufficient experience relevant to the style of mineralisation and deposit type under consideration and
to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Mr Poole consents to the inclusion in the report of matters based on his information in the form and
context in which it appears.
Page 12 of 27
ASX ANNOUNCEMENT
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood Michael Vaughan
Managing Director and CEO Media Relations – Fivemark Partners
Tel: +61 8 9386 9534 Tel: +61 422 602 720
grant.haywood@horizonminerals.com.au michael.vaughan@fivemark.com.au
Page 13 of 27
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs and
financial performance. Forward looking statements include, but are not limited to, statements
preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”,
“intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar
expressions. Forward looking statements, opinions and estimates included in this announcement
are based on assumptions and contingencies which are subject to change without notice, as are
statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be
relied on as a guarantee of future performance. Forward looking statements may be affected by a
range of variables that could cause actual results to differ from estimated results, and may cause
the Company’s actual performance and financial results in future periods to materially differ from
any projections of future performance or results expressed or implied by such forward looking
statements. These risks and uncertainties include but are not limited to liabilities inherent in mine
development and production, geological, mining and processing technical problems, the inability
to obtain any additional mine licenses, permits and other regulatory approvals required in
connection with mining and third party processing operations, competition for among other things,
capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments
of the value of acquisitions, changes in commodity prices and exchange rate, currency and interest
fluctuations, various events which could disrupt operations and/or the transportation of mineral
products, including labour stoppages and severe weather conditions, the demand for and
availability of transportation services, the ability to secure adequate financing and management’s
ability to anticipate and manage the foregoing factors and risks. There can be no assurance that
forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements
in the announcement, including with respect to any production targets and financial estimates,
based on the information contained in this and previous ASX announcements.
Page 14 of 27
ASX ANNOUNCEMENT
APPENDIX A - JORC 2012 TABLES
Burbanks Project
JORC Code (2012) Table 1, Sections 1 and 2
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Sampling was conducted using multipurpose Reverse Circulation (RC) and
Diamond Core (DD) drilling rig from surface.
For RC drilling, samples were collected as both 4m composites and 1m splits using
a cyclone and cone splitter to obtain a ~2-3kg representative samples.
Diamond drilling was used to obtain ½ NQ2 core samples of various lengths
(minimum 0.2m and maximum 1.2m), from which 1-3kg of material is collected for
assaying.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
RC samples were collected directly from a cyclone and cone splitter mounted on
the rig to give 4m composites and a 1m split.
The cyclone and splitter were cleaned regularly to minimize contamination.
For DD drilling, samples were collected as half-core (NQ2) using geological
intervals and mineralisation boundaries which is considered appropriate for this
style of mineralisation.
Page 15 of 27
ASX ANNOUNCEMENT
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Core was cut longitudinally using a diamond saw, with half submitted for analysis
and the remaining half of core retained for reference, structural analysis, and
additional study work. The core was orientated prior to cutting.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
Field duplicates, QAQC certified reference standards and blanks were
collected/inserted at a rate of 1 in every 20m (maximum) through pre-determined
mineralised zones.
All samples were crushed and split to produce a 500g jar for Photon assay.
Sampling and QAQC procedures are carried out using Horizon protocols consistent
with industry best practice.
Drilling Techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented
and if so, by what method, etc).
RC drilling was carried out using a face sampling hammer with a 127mm (5”) drill bit.
DD was NQ2 through the main zones of mineralisation. Core was oriented every 6m
where possible using an electronic orientation tool.
Drill sample recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
Sample recoveries for RC are visually estimated qualitatively on a metre basis and
recorded in the database.
Page 16 of 27
ASX ANNOUNCEMENT
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Core recovery was measured using the drillers recorded depth marks against the
length of the core recovered once orientated. This is verified and confirmed by
Horizon staff.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Drilling contractors adjust their drilling approach to specific conditions to maximise
sample recovery.
RC samples were visually assessed for recovery and moisture. A cyclone and cone
splitter were used to provide uniform sample.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No sample recovery issues have impacted on potential sample bias.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
All drilled intervals (RC and DD) are logged and recorded.
Data for DD core was recorded for regolith, lithology, veining, fabric (structure),
grain size, colour, sulphide presence, alteration, oxidation state, fractures, and
RQD.
Horizon considers the data to be of an appropriate level of detail to support future
resource estimations.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
Logging is both qualitative and quantitative in nature depending on the field being
logged.
Logging of RC chips and DD core was qualitative, both were photographed.
Page 17 of 27
ASX ANNOUNCEMENT
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
RC chips trays and DD core is stored at the Company’s core yard on-site at
Burbanks.
The total length and percentage of the relevant
intersections logged.
All drillholes are logged in full.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
DD core is cut in half next to the orientation line. The right-side of the core is
collected for analysis and the left side retained for reference.
Duplicate samples were submitted at a rate of 1:20m through mineralised zones
and certified reference standards were inserted at a rate of 1:20m (maximum)
through mineralised zones based on geological interpretation.
Samples were sent to Intertek Laboratories, where they were dried and crushed to
2 mm before a 500 g split was taken for photon assay.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
All RC samples were passed through cyclone and cone splitter, and a 2-3kg split
sample is collected for each 1m interval and similarly a 4m interval.
4m samples were collected and sent to Intertek to be dried and crushed to 2mm
before a 500g split was taken for photon assay.
1m split samples were collected for analysis from selected zones based on field
logging and >0.3g/t returned assay. All other zones within the RC were sampled by
collecting a 4m composite sample.
Page 18 of 27
ASX ANNOUNCEMENT
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample size is considered appropriate for this type and style of mineralisation
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Laboratory QA/QC controls during the analysis process include duplicates for
reproducibility, blank samples for contamination and standards for bias.
The laboratories used have generally demonstrated analytical accuracy at an
acceptable level within 95% confidence limits.
Laboratories also employ their own internal QA/QC protocols.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Laboratory duplicates were generated from the coarse crushed material as part of
the analytical process to monitor sample precision.
For diamond core, the core was orientated and consistently cut next to the
orientation line, with the right-hand side of the core submitted for assay. This
procedure ensures that sampling is systematic and representative of the in-situ
material.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The sample size is considered appropriate for this type and style of mineralisation
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
RC and DD samples were sent to Intertek Laboratories for analysis by Photon
Assay. A 500 g sample is assayed for gold by Photon Assay (method PAAU02)
along with quality control samples including certified reference material, blanks and
duplicates.
Page 19 of 27
ASX ANNOUNCEMENT
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
SG measurements are routinely collected using the water displacement method at
an average rate of 1 every 20m and include each lithological unit.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
No geophysical tools or XRF instruments have been used at Burbanks.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been
established.
Laboratory QA/QC controls during the analysis process include duplicates for
reproducibility, blank samples for contamination and standards for bias.
The laboratories used have generally demonstrated analytical accuracy at an
acceptable level within 95% confidence limits.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
All drilling and significant intersections are verified and signed off by the Chief
Geologist for Horizon Minerals who is also a Competent Person.
The use of twinned holes. No pre-determined twin holes were drilled during this program.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Geological logging was originally captured on formatted excel templates, then sent
to the company’s inhouse database manager utilising Geobank v2025.1 software
for uploading into the company database via a validation process.
Laboratory assay and downhole survey data is captured electronically.
Page 20 of 27
ASX ANNOUNCEMENT
Burbanks Project
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Uploaded data is reviewed and verified by the geologist responsible for the data
collection.
Discuss any adjustment to assay data. No adjustments or calibrations were made to the assay data reported.
Location of data
points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole collar locations are positioned with a hand-held GPS.
Prior to the end of the program and any Mineral Resource estimation the collar
locations will be surveyed by a qualified surveyor using sophisticated DGPS with a
nominal accuracy of +/- 0.05m for north, east and RL (elevation).
The drilling rig was sited using a compass and a rig