Drilling Commences Near Cannon
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
12 JULY 2023
DRILLING COMMENCES NEAR CANNON
•
Fully funded 8,400m exploration program underway with aircore drilling commenced at the
key Cannon project 25km southeast of Kalgoorlie.
•
Drilling will be campaigned through to September 2023. Primary objectives of the 2023 winter
program are to:1
o
Infill resource drilling (AC/RC) at Monument and Pinner (~2,230m);
o
Test a discovery target north of the Cannon mine with one RC drill hole (~180m);
o
Follow-up recent diamond drilling at Penny’s Find with two deep RC holes (~730m);
o
Undertake new discovery drilling (AC/RC) at Kanowna South and Lakewood following
up exciting results from the FY22 program (~2,660m); and
o
Exploration drilling (AC/RC) at the Kestrel and Honeyeater prospects at Binduli
(~2,600m)
The program aims to expand the Cannon mining footprint from one planned underground mine to a
small mining hub with potential open cut mines from the nearby Monument and Pinner prospects.
An initial resource at Monument is being finalised and will be released ahead of the results from the
upcoming program. Plans are to also test a new region immediately north of the Cannon open cut
mine where historic drilling intersected anomalous grades at depth but were never followed up. 1
Underground mining at Penny’s Find is currently scheduled to follow on from Cannon. To expand
upon this opportunity, two deep RC holes have been allocated around the new northern domain
mineralisation highlighted by PFRCD23003 (1.45m @ 2.61g/t Au from 314.75m and 3.2m @ 4.19g/t
Au from 318.3m) to build on the existing resource at Penny’s Find. This will aim to bring this area of
the resource to an Indicated status to feed into study work and allow the Mining Reserve to be
calculated. 1 2
Several prospects around Kalgoorlie that range from conceptual to advanced will also be tested to
advance key (potentially high grade) prospects such as Kestrel and Honeyeater (Figure 1).
Commenting on the 2023 drilling program, Horizon Chief Executive Officer Mr Grant Haywood said:
“With the development and mining of our Cannon underground gold project commencing in the
December 2023 half, there is a great opportunity to leverage off the infrastructure being installed at
Cannon to mine other assets in close proximity, such as Pinner and Monument. Our goal is to be in
sustainable, profitable production moving from one small project to the next. Therefore our attention
needs to focus on both building our pipeline of production ready deposits and also testing new
discovery targets which we can progress through the project pipeline.”
See Cautionary and Forward-Looking Statements on Page 3 2 As announced to ASX on 31 May 2023, see Competent Persons
Statement on Page 3.
1
163 Stirling Hwy
Nedlands WA 6009
PO Box 1104
Nedlands WA 6909
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Figure 1: Horizon’s new discovery, resource growth and development project locations
Project Pipeline
Ore Reserves
Advanced Mining Projects
Optimisation Studies and
Resource Expansion
Advanced Prospects
Grass roots/concept
targets
Cannon
(17,680oz)
Increasing
Confidence
Final Contracts and
Commencement of Mining
H2, 2023
Pennys Find, Rose Hill,
Boorara
(584,540oz)
Mine Approvals and
Feasibility
Crake, Coote, Teal, Jacques, Peyes,
Kalpini
(533,090oz)
Projects on
Granted/Applied Mining
Licence
Monument, Pinner, Kestrel, Honeyeater, Yarmany,
Golden Ridge
(Significant Gold Intercepts)
Improved
Geological
Understanding
Kanowna South, Cannon North, Martins, Binduli-White Flag, Black Flag,
Lakewood (PGE-Ni-Au), Blair North (Ni), Euston (Ni)
(Gold and other valuable metals located on or near major structures)
Drill
Figure 2: Horizon’s Project Pipeline
Page 2 of 3
ASX ANNOUNCEMENT
Competent Person Statement
Information in this announcement that relates to exploration results is based on information compiled by
David O’Farrell who is the Exploration Manager of Horizon Minerals. Mr O’Farrell is a Member of The
Australasian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity that he is
undertaking, to qualify as Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr O’Farrell consents to the
inclusion in the document of the information in the form and context in which it appears.
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements. They
include indications of, and guidance on, future earnings, cash flow, costs and financial performance.
Forward looking statements include, but are not limited to, statements preceded by words such as
“planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”,
“potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward looking statements,
opinions and estimates included in this announcement are based on assumptions and contingencies
which are subject to change without notice, as are statements about market and industry trends, which
are based on interpretations of current market conditions. Forward looking statements are provided as a
general guide only and should not be relied on as a guarantee of future performance. Forward looking
statements may be affected by a range of variables that could cause actual results to differ from estimated
results, and may cause the Company’s actual performance and financial results in future periods to
materially differ from any projections of future performance or results expressed or implied by such
forward looking statements. These risks and uncertainties include but are not limited to liabilities inherent
in mine development and production, geological, mining and processing technical problems, the inability
to obtain any additional mine licenses, permits and other regulatory approvals required in connection with
mining and third party processing operations, competition for among other things, capital, acquisition of
reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of acquisitions,
changes in commodity prices and exchange rate, currency and interest fluctuations, various events which
could disrupt operations and/or the transportation of mineral products, including labour stoppages and
severe weather conditions, the demand for and availability of transportation services, the ability to secure
adequate financing and management’s ability to anticipate and manage the foregoing factors and risks.
There can be no assurance that forward looking statements will prove to be correct.
Approved for release by the Board of Directors.
For further information, please contact:
Grant Haywood
Chief Executive Officer
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 3 of 3
Share your feedback
Discover