Boorara Ore Reserve Supports Development
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
26 JULY 2024
BOORARA ORE RESERVE SUPPORTS DEVELOPMENT
HIGHLIGHTS
•
Independent JORC (2012) Ore Reserve for Boorara completed by AMC Consultants shows
a financially viable project highlighted by the following:
o
Open pit mine design producing 1.24Mt at a fully diluted grade of 1.24g/t Au for
49.5koz over an approximate 14 month mine life
o
Ore Sale Agreement (OSA) at 92.5% metallurgical recovery produces 45.8koz
recovered
o
Project generates $19.9M in free cash flow (after capital) at a gold price of A$3,300/oz
•
Boorara is fully permitted with all statutory approvals in place
•
Mining and haulage contracts well advanced
•
Binding OSA has been executed with Paddington Gold Pty Ltd (Paddington), a wholly owned
subsidiary of Norton Gold Fields Ltd for treatment of Boorara ore
•
Development decision expected imminently along with commencement of mining in the
current September 2024
Commenting on the Ore Reserve, Managing Director and CEO Mr Grant Haywood said: 1
“We are very pleased that the independent Ore Reserve has validated our initial work that allows us
to move forward with mining at Boorara and bring strong cashflows into Horizon. Our contract
negotiations are well advanced and are the final key milestone outstanding in relation to bringing this
asset into production.
Horizon has strong optionality within its large resource book of projects, which we aim to develop in
conjunction, and following, development of Boorara to be a sustainable gold producer and generate
more cash in this strong gold price environmental for the foreseeable future.”
Cautionary Statement
The Ore Reserve Study referred to in this announcement is based on Proven and Probable Ore Reserves derived from
Measured and Indicated Mineral Resources. No inferred Resource material has been included in the estimation of Ore
Reserves. The Company advises that Proven and Probable Ore Reserves provide 100% of the total tonnage and 100%
of the total gold metal underpinning the forecast production target and financial projections. There is no additional life-ofmine plan material derived from the non-Ore Reserve material. There is no dependence of the outcomes of the Ore
Reserve Study and the guidance provided in this announcement on the non-Ore Reserve material. No Inferred Mineral
Resource material is included in the life of mine plan (refer Appendix 1 and Forward Looking and Cautionary Statements
on Pages 18-19).
Horizon has concluded it has reasonable basis for providing the forward looking statements included in this announcement
(see pages 18-19). The detailed reasons for that conclusion are outlined throughout this announcement and Material
Assumptions are disclosed in Appendix 1. This announcement has been prepared in accordance with the JORC Code.
163 Stirling Hwy
Nedlands WA 6009
PO Box 1104
Nedlands WA 6909
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to announce the
results of the Boorara Ore Reserve Study (“ORS” or “Study”). The proposed mining project is 100%
owned and is located 15km east of Kalgoorlie-Boulder, adjacent to the Super Pit in the heart of the
Western Australian goldfields (Figure 1).
Figure 1: Horizon’s project locations, regional geology and surrounding infrastructure
Boorara Overview
The Boorara Gold Project is located 15km east of Kalgoorlie-Boulder (Figure 1) adjacent to the Super
Pit, and 1km southwest of the Nimbus Silver-Zinc Project site where established offices are
connected to mains power and existing water supplies.
The deposit is hosted in a quartz dolerite comprising a sheeted quartz vein array system with
bounding shear zones and late-stage cross faults. Mineralisation occurs as northwest dipping
sheeted and stockwork quartz-carbonate vein arrays within the quartz dolerite host rocks, and
steeply dipping zones along sheared geological contacts trending to the north-northwest.
Page 2 of 45
ASX ANNOUNCEMENT
The updated Mineral Resource Estimate (JORC 2012) for Boorara is shown below: 1
Table 1: Mineral Resource Estimate
Boorara at 0.5g/t Au lower cut-off grade
Tonnes (Mt)
Grade (g/t Au)
Measured
Resource category
1.12
1.22
Gold Metal (Oz)
44,000
Indicated
6.85
1.28
281,000
Inferred
2.56
1.26
103,000
Total
10.53
1.27
428,000
Boorara Ore Reserves Study
The Study was undertaken independently by AMC Consultants and is based on the following key
parameters:
•
Gold price of A$3,300/oz
•
Open pit mining operations and road haulage conducted by contractors
•
Ore processing through Paddington’s 3.8Mtpa Paddington Mill, located ~56km by road from
Boorara
•
Project implementation and oversight by Horizon’s own team in conjunction with contractors
The key Study outcomes for the project are included in Table 2 below: The estimated Ore Reserve,
which constitutes 100% of the production target, has been prepared by competent persons in
accordance with JORC Code 2012.1
Table 2: Summary of Study key outcomes 2
Measure
Total pit volume (MBCM)
Outcome
4.37
Stripping ratio (waste: ore)
6.1
Mined ore (Mt)
1.24
Gold grade (g/t)
1.24
Milling recovery average (%)
92.5
Recovered gold (koz)
45.8
Capital costs (A$M)
0.45
Free cashflow (A$M)
19.9
AMC conducted an engineering study (the “Study”) as of 25 July 2024. The Study, prepared with
an accuracy of ±15%, considered all relevant mining modifying factors, allowing an Ore Reserve
to be estimated in accordance with the JORC Code. Classification of the estimate is shown in
Table 3.
Page 3 of 45
ASX ANNOUNCEMENT
As announced to the ASX on 25 July 2024. 2 See Forward Looking and Cautionary Statements on Page 18 and JORC tables on Page
19 and ASX disclosures on page 7.
1
Table 3: Ore Reserve Statement (see Appendix 1) 1
Pit
Pit 1
Pit 2
Pit 3
Pit 4
Total Mineral Reserve
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
0.0
0.00
0.0
Probable
18.4
2.22
1.3
Total
18.4
2.22
1.3
Proved
352.5
1.28
14.5
Probable
339.2
1.18
12.9
Total
691.7
1.23
27.3
Proved
27.0
1.21
1.1
Probable
30.1
1.06
1.0
Total
57.1
1.13
2.1
Proved
257.2
1.22
10.1
Probable
214.7
1.25
8.6
Total
471.9
1.23
18.7
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
The Boorara Measured and Indicated Mineral Resources are inclusive of those Mineral Resources
modified to produce the Boorara Ore Reserves that can be economically mined by open pit mining
methods. The Ore Reserves make up 100% of the production in the Study.
Mr Adrian Jones continues to be the Competent Person for the 25 July 2024 Boorara Ore Reserve
estimate, and supervised preparation of the estimate with assistance from specialists in each area
of the estimate. Mr Jones is a Member of the Australasian Institute of Mining and Metallurgy and is
employed by AMC Consultants Pty Ltd. He has sufficient experience relevant to the style of
mineralization, type of deposit under consideration, and in open pit mining activities, to qualify as a
Competent Person as defined in the JORC Code. Mr Jones consents to the inclusion of this
information in the form and context in which it appears.
The information compiled by Mr Jones was prepared by specialists under direction of the responsible
people identified within this Study report. Mr Jones is satisfied that the work of the specialists is
acceptable for the purposes of Ore Reserve estimation. Each person has accepted responsibility for
this report in their area of expertise.
The Proved Ore Reserve estimate is based on Mineral Resources classified as Measured, after
consideration of all mining, metallurgical, social, environmental, statutory and financial aspects of
the project. The Probable Ore Reserve estimate is based on Mineral Resources classified as
Indicated, after consideration of all mining, metallurgical, social, environmental, statutory and
financial aspects of the project.
1
See Forward Looking and Cautionary Statements on Page 18 and JORC tables on Page 19 and ASX disclosures on page 7.
Page 4 of 45
ASX ANNOUNCEMENT
Financial analysis undertaken in June 2024 shows that, at 25 July 2024, the future revenues to be
derived and costs incurred to access those revenues produce a viable project using the assumptions
presented in this estimate.
The Boorara Ore Reserve reflects the mining of four pits across three mineralised zones within the
Mineral Resource, one small and one large pit within the Regal (North) deposit (pits 1 and 2), one
within the Crown Jewel deposit (Central, pit 3), and one pit in the Royal (South) deposit (pit 4) as
shown in Figure 2. The removal of a very limited amount of waste over burden is required to reach
the ore zones in most areas, with ore within 5m of surface in the Regal zone and Crown Jewel
deposits, whereas the amount of cover increases to the south, with approximately 10m to be stripped
in the Royal zone before exposing ore for mining.
Figure 2: Horizon’s Boorara Project initial pit optimisations
Grade control drilling has been partially completed over the project during previous mining
operations, with infill grade control drilling planned to commence in the coming weeks. Ore
production will commence within the first month of mining, followed by processing followed thereafter
once sufficient stockpiles have been built and grade determined to transport to the mill. The Study
assumes low powder factor “paddock” blasting will be conducted to ensure acceptable dig rates
without unnecessary ore movement impacting ore loss and dilution. Final pit depths are up to 85m.
Next Steps 1
1
•
Award open pit mining and surface ore haulage contracts
•
Finalise management and technical team for Boorara
•
Commence grade control infill program
See Forward Looking and Cautionary Statements on Page 18.
Page 5 of 45
ASX ANNOUNCEMENT
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 6 of 45
ASX ANNOUNCEMENT
Listing Rule 5.9 Disclosures
Boorara Gold Project
Material Assumptions and Outcomes
Horizon provided most of the net smelter return (NSR) inputs and formulas needed to determine the
economic value for each block to AMC. This encompassed processing costs, ore transportation
costs, grade control costs, royalties, and anticipated metal prices. AMC contributed to the NSR by
supplying the mining cost parameters for each bench and the process recoveries.
Mining and surface ore haulage costs were sourced from reputable contractors, and ore processing
costs from the Ore Purchase Agreement Horizon has with Paddington. State gold royalty of 2.5%
ad valorum and private royalties were applied as per the royalty agreements. These costs and
royalties are commercially sensitive. Gold price revenue assumptions were based on A$3,300/oz,
a discount to current spot prices, and considered appropriate for the short life duration of the project.
AMC assert that the cost estimate can be considered to align with an expected estimation accuracy
of ±15%, primarily due to the use of equipment performance from previous operating periods and
the use of contractor quotes.
Financial modelling activities were undertaken inhouse by Horizon and quoted as a modifying factor
in support of the Ore Reserve statement.
In summary AMC is satisfied, that the level of work (including the project financial model), can be
considered appropriate, to support the quotation of the Ore Reserve statement, with quoted level of
accuracy in the supporting technical and financial studies, at a level of ±15%.
Key outcomes of the study are shown in Table 2 above.
Criteria for Classification
AMC has reviewed the modelling methodology and Mineral Resource estimate that was applied by
Optiro and Horizon to the block models developed in 2021. In general, AMC considers the processes
to determine the Mineral Resource are adequate for reporting of Mineral Resources.
Measured Mineral Resources have been converted to Proven Ore Reserves. Indicated Mineral
Resources have been converted to Probable Ore Reserves. The Ore Reserves consist of 51%
Proved Reserves and 49% Probable Reserves.
The Competent Person is satisfied that the stated Ore Reserve classification reflects the outcome of
technical and economic studies.
The confidence in the Ore Reserve is reflected by the classifications shown above. In general, at the
project’s geology is well understood and confidence in the Mineral Resource interpretation is good.
The Project is a well-established mine that was operated on a trial basis in 2020. The previous mining
extraction and confirmed processing recovery from that operation substantially de-risk the reestablishment of mining activities at the Project.
Page 7 of 45
ASX ANNOUNCEMENT
Mining Method and Assumptions
The mining method is conventional open pit mining including drill and blast and load and haul
operations utilising excavators in backhoe configuration loading haul dump trucks. Typical ancillary
fleet comprising water trucks, dozers and graders shall also be utilised.
The ultimate pit designs for Boorara were based on the latest pit optimization output. AMC compared
the pit design against the updated pit optimization that the revenue factor 0.94 shell 28 was a good
comparison. In consultation with Horizon, shell 28 and the associated pit design were determined to
be an appropriate choice to support the 2024 Ore Reserves Statement.
The following design parameters were used in all final pits:
•
Single lane ramps of 12m wide at 10% gradient.
•
Various Batter Angles.
•
20m bench height.
•
15m bench height below 30m depth.
•
8.5m bench width.
Figure 3: Pit design for Pit 1 and Pit 2
Page 8 of 45
ASX ANNOUNCEMENT
Figure 4: Pit design for Pit 3 and Pit 4
Mining recovery factors and dilution factors were built in through a regularised block model. The
Mineral Resource model was regularized to a block size determined to be appropriately
representative of the selective mining unit, following an analysis of a range of block sizes selected
to reflect mining to the ore/waste contact and the variation in mining RLs in different areas of the pit.
Metallurgical models were applied to the regularized model to model products grades and yields.
Dilution and mining recovery were modelled by applying the regularization process to the sub-block
geological model.
Processing Method and Assumptions
Ore mined will be hauled from the Boorara run of mine (ROM) pad and delivered to the Paddington
processing plant ROM pad where it will be picked up by front end loader and fed into the plant. Ore
will be processed at approximately 65kt per month over a 19 month period.
An Ore Purchase Agreement (OPA) is in place with Paddington Gold Pty Ltd, a wholly owned
subsidiary of Norton Gold Fields Ltd, to treat the Boorara ore at the Paddington processing facility
approximately 56km by road from Boorara.
Metallurgical results indicate ore treatment through a conventional crushing, grinding and gravity
circuit followed by standard carbon in leach gold extraction is suitable and appropriate for the ore
type. The flowsheet, grind sizes and leaching times employed at the Paddington Mill will be
appropriate for Boorara ore Testwork and the treatment of ore from the Boorara Gold Project in 2016
and 2020 indicate that metallurgical recoveries of 92.5% are applicable for the study. No deleterious
elements have been identified through the testwork or previous treatment campaigns however gold
Page 9 of 45
ASX ANNOUNCEMENT
extraction appears to be negatively impacted in primary ore by the presence of arsenopyrite in some
of the testwork.
Cut-off grades or quality parameters
The cut-off grade for estimation of Ore Reserves is greater than or equal to 0.5g/t gold, reported as
an open pit and constrained to a depth of 200m below the surface.
The Mineral Resource model was regularized to a block size determined to be appropriately
representative of the selective mining unit, following an analysis of a range of block sizes selected
to reflect mining to the ore/waste contact and the variation in mining RLs in different areas of the pit.
Metallurgical models were applied to the regularized model to model products grades and yields.
Dilution and mining recovery were modelled by applying the regularization process to the sub-block
geological model.
Pit optimisations utilizing the Lerchs-Grossmann algorithm with industry standard software were
undertaken. This optimisation utilized the regularized Mineral Resource model together with cost,
revenue, and geotechnical inputs.
Estimation Methodology
The resultant pit shells were used to develop detailed pit designs with due consideration of
geotechnical, geometric, and access constraints. These pit designs were used as the basis for
production scheduling and economic evaluation.
Conventional mining methods (truck and excavator), similar to previous Boorara mining activates
were selected.
The geotechnical parameters have been applied based on geotechnical studies.
During the above process, Inferred Mineral Resources were excluded from mine schedules and
economic valuations utilized to validate the economic viability of the Ore Reserves.
Reporting considered the infrastructure requirements associated with the conventional truck and
shovel mining operation including maintenance facilities, access routes, explosive storage, water,
power and transport facilities.
This schedule assumes ideal conditions where the potential of the specified mining fleet can be
achieved and that stockpiles will be manageable. It does not consider any delays due to calendar
events, unfavourable weather conditions, issues with maintenance and permits etc
Page 10 of 45
ASX ANNOUNCEMENT
Material Modifying parameters
The Boorara gold project is located approximately 15km east of Kalgoorlie-Boulder. Access to site
is via an existing unsealed site access road owned by Horizon and the sealed Bulong Road from
Kalgoorlie-Boulder. Transportation of ore shall be via Horizon’s private road and then on public roads
and private roads owned by Paddington to the Paddington plant.
Mining shall be undertaken under the Mining Act 1978 on granted mining leases M26/29, M26/277,
M26/490 and M26/318, an approved clearing permit and mining proposal from DEMIRS.
Pits 1 to 3 are mined above the water table, whereas Pit 4 is expected to encounter groundwater in
the Mine during the last 15m of mining. A groundwater licence is in place for 0.2GL which may need
to be amended to accommodate additional dewatering if required. Dewatering bores are considered
not suitable with the water managed by in-pit sumps.
Page 11 of 45
ASX ANNOUNCEMENT
Site establishment and minor site road upgrades will be undertaken by the mining contractor,
inclusive of offices, hard-stand area and a workshop facility. Due to the proximity of KalgoorlieBoulder, all external providers and staff shall come from the nearby city, with top up FIFO personnel
expected to support the operation who shall be housed in motel accommodation in the city.
Page 12 of 45
ASX ANNOUNCEMENT
Horizon Minerals Limited – Summary of Gold Mineral Resources
Cutoff
Measured
Indicated
Inferred
Total
Au g/t
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Mt
Au
g/t
Oz
Boorara OP
0.5
1.12
1.22
44,000
6.85
1.28
281,000
2.56
1.26
103,000
10.53
1.27
428,000
Burbanks OP
0.5
-
-
-
1.43
2.00
92,780
3.43
1.90
204,870
4.86
1.90
297,650
Burbanks UG
2.5/2.0*
-
-
-
0.12
4.30
16,730
1.07
4.40
151,190
1.19
4.40
167,920
Phillips Find OP
0.5
-
-
-
0.54
2.40
41,650
0.19
2.10
12,700
0.73
2.30
54,360
Phillips Find UG
2
-
-
-
-
-
-
0.03
2.30
210
0.03
2.30
210
Golden Ridge
1
-
-
-
0.47
1.83
27,920
0.10
1.70
2,800
0.52
1.82
30,720
Golden Ridge
North
0.8
-
-
-
0.65
1.15
24,260
0.77
1.30
32,340
1.42
1.23
56,600
Cannon UG
1
-
-
-
0.19
4.80
28,620
0.10
2.30
3,450
0.23
4.29
32,070
Monument
0.5
-
-
-
0.74
1.18
28,000
-
-
-
0.74
1.18
28,000
Pinner
0.5
-
-
-
0.06
1.02
2091
0.27
1.25
10,753
0.33
1.21
12,844
Pennys Find
1.5
-
-
-
0.30
5.19
51,000
0.12
3.00
12,000
0.43
4.57
63,000
Kalpini
0.8
-
-
-
1.40
2.43
108,000
0.50
2.00
31,000
1.87
2.33
139,000
Rose Hill UG
2
-
-
-
0.33
4.50
47,100
0.20
4.80
27,800
0.51
4.60
74,900
Rose Hill OP
0.5
0.19
2.00
12,300
0.09
2.00
6,100
-
-
-
0.29
2.00
18,400
Jacques-Peyes
0.8
-
-
-
0.97
2.59
81,000
0.80
2.00
49,000
1.74
2.32
130,000
Teal
1
-
-
-
1.01
1.96
63,680
0.80
2.50
64,460
1.81
2.20
128,140
Crake
0.8
-
-
-
1.33
1.47
63,150
0.10
1.30
3,300
1.42
1.46
66,450
Coote
1
-
-
-
-
-
-
0.40
1.50
21,000
0.42
1.54
21,000
Capricorn
0.5
-
-
-
-
-
-
0.70
1.20
25,500
0.70
1.20
25,500
Baden Powell
0.5
-
-
-
-
-
-
0.60
1.20
23,000
0.60
1.20
23,000
1.31
1 .34
16.48
1.82
963,081
12.74
1.90
778,373
30.37
1.84
1,797,764
Project
Total
56,300
Confirmation
The information in this report that relates to Horizon’s Mineral Resources estimates is extracted
from and was originally reported in Horizon’s ASX announcements “Intermin’s Mineral Resources
Grow 30% to over 560,000 Ounces”, (ASX:IRC) (Teal) dated 19 September 2018, “Gold
resources increase to 1.24moz” (Coote, Capricorn, Baden Powell) dated 28 September 2022 ,
“Rose Hill firms as quality high grade open pit and underground gold project” dated 8 December
2020, “Pennys Find Resource Update” dated 29 December 2023, “Updated Crake Resource
improves in quality” dated 7 September 2021, “Jacques Find- Peyes Farm Mineral Resource
update” dated 15 September 2021, “Asset Swap with Northern Star Completion”, dated 20
December, 2019, “Investor Presentation June 2022”, 31 May 2022, "Maiden Resources for
Monument and Golden Ridge North”, 19 July 2023, “Kalpini Gold Project Mineral Resource
Update” dated 28 September 2021, “Group Minerals Resources Statement” dated 25 July 2024,
each of which is available at www.asx.com.au. Horizon Minerals resources at Burbanks were
originally reported by Greenstone Resources (GSR) in “Global Gold Resource Increases 57% to
520,134 oz”, on 5 July 2023. Horizon Minerals resources at Phillips Find were originally reported
by Greenstone Resources (GSR) in “Interim Update Increases Resource by 128% to 332,114
oz”, on 20 September 2022.
Page 13 of 45
ASX ANNOUNCEMENT
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements and that all material assumptions
and technical parameters underpinning the estimates in those announcements continue to apply
and have not materially changed. The Company confirms that the form and context of the
Competent Person’s findings in relation to those Mineral Resources estimates or Ore Reserves
estimates have not been materially modified from the original market announcements.
Competent Persons Statement – Boorara
The information in this announcement which relates to Exploration Results and geological
interpretation at Boorara is based on information compiled by Horizon Minerals Limited under
the supervision and review of Mr Stephen Godfrey Resource Development Manager at Horizon
Minerals Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusImm
110542) and a Member of the Australian Institute of Geoscientists (MAIG 3993). Mr Godfrey
consents to the inclusion in the announcement of the matters based on their information in the
form and context in which it appears. The information in this announcement which relates to the
estimation of the Boorara mineral resource was compiled by Mr Mark Drabble. Mr Drabble is a
Principal Geological Consultant at Optiro Pty Ltd. and an independent consultant to Horizon
Minerals Ltd (HRZ) and is responsible for the Mineral Resource Estimation. Mr Drabble is a
Member of the Australian Institute of Mining and Metallurgy and a Member of the Australian
Institute of Geoscientists. Messrs Godfrey and Drabble have sufficient experience relevant to the
style of mineralisation and deposit type under consideration and to the activities being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Messrs
Godfrey and Drabble consent to the inclusion in the report of matters based on his information
in the form and context in which it appears
Page 14 of 45
ASX ANNOUNCEMENT
Horizon Minerals Limited – Summary of non-Gold Mineral Resources
Nimbus All Lodes (bottom cuts 12g/t Ag, 0.5% Zn, 0.3g/t Au)
Category
Tonnes
Grade
Contained Metal
Mt
Ag (g/t)
Au (g/t)
Zn (%)
Ag (Moz)
Au
('000oz)
Zn ('000t)
Measured Resource
3.62
102
0.09
1.2
11.9
10
45
Indicated Resource
3.18
48
0.21
1.0
4.9
21
30
Inferred Resource
5.28
20
0.27
0.5
3.4
46
29
TOTAL RESOURCE
12.08
52
0.20
0.9
20.2
77
104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2800g/t Ag top cut)
Category
Tonnes
Grade
Contained Metal
Mt
Ag (g/t)
Zn (%)
Ag (Moz)
Zn (‘000t)
Measured Resource
-
-
-
-
-
Indicated Resource
0.17
762
12.8
4.2
22
Inferred Resource
0.09
797
13.0
2.2
11
TOTAL RESOURCE
0.26
774
12.8
6.4
33
Mt Thirsty (Cut-off Grade 0.25% NiEq%)
Category
Tonnes
Grade
Contained Metal
Mt
Ni (%)
Co (%)
Mn (%)
Ni (‘000t)
Co (‘000t)
Mn (‘000t)
Measured Resource
-
-
-
-
-
-
-
Indicated Resource
30.2
0.51
0.10
0.69
154.7
29.3
207.8
Inferred Resource
31.9
0.35
0.03
0.24
110.4
9.3
76.6
Total Resource
62.1
0.43
0.06
0.46
265.1
38.5
284.4
Measured Resource
-
-
-
-
-
-
-
Indicated Resource
-
-
-
-
-
-
-
Inferred Resource
4.2
0.43
0.05
0.29
17.9
2.0
11.8
Total Resource
4.2
0.43
0.05
0.29
17.9
2.0
11.8
TOTAL RESOURCE
66.2
0.43
0.06
0.45
283.0
40.5
296.2
Mt Thirsty Main (MTTM)
Mt Thirsty North (MTTN)
Confirmation
Horizon Minerals Ltd resources at Mt Thirsty were originally reported by Greenstone Resources
(GSR) in “Mt Thirsty Mineral Resource Increases by Over 145%”, on 26 April 2023.
Nimbus
The information is this report that relates to Horizon’s Mineral Resources estimates on the
Nimbus Silver Zinc Project is extracted from and was originally reported in Intermin’s and
MacPhersons’ ASX Announcement “Intermin and MacPhersons Agree to Merge – Creation of a
New Gold Company Horizon Minerals Ltd” dated 11 December 2018 and in MacPhersons’ ASX
announcements “Quarterly Activities Report” dated 25 October 2018, “New High Grade Nimbus
Silver Core Averaging 968 g/t Ag” dated 10th May 2016 and “Nimbus Increases Resources”
dated 30th April 2015, each of which is available at www.asx.com.au. The Company confirms
Page 15 of 45
ASX ANNOUNCEMENT
that it is not aware of any new information or data that materially affects the information included
in the original market announcements and that all material assumptions and technical
parameters underpinning the estimates in those announcements continue to apply and have not
materially changed. The Company confirms that the form and context of the Competent
Person’s findings in relation to those Mineral Resources estimates have not been materially
modified from the original market announcements.
Mt Thirsty
The information in this announcement which relates to Exploration Results and geological
interpretation at Mt Thirsty is based on information compiled by Mr Glenn Poole an employee of
Greenstone Resources Limited who is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM 317798). Mr Poole consents to the inclusion in the announcement of the
matters based on their information in the form and context in which it appears.
The Mineral Resource Statement for the Mt Thirsty Mineral Resource Estimate was prepared
during 2023 and is reported according to the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition.
The information in this announcement which relates to Mineral Resources is based on
information provided to and compiled by Richard Gaze, who is a full-time employee of WSP
Australia Pty Ltd, and a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM). Richard Gaze has sufficient relevant experience regarding the style of
mineralisation and type of deposits under consideration and to the activity for which he is
undertaking to qualify as a Competent Person as defined in JORC 2012.
The company is not aware of any new information or data that materially affects the information
presented and that the material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed. The company confirms that the
form and context in which the Competent Persons’ findings are presented have not been
materially modified from the original market announcements.
Page 16 of 45
ASX ANNOUNCEMENT
Ore Reserve Statement
Location
Boorara Open Pit
Cannon Underground
Total Ore Reserves
Reserve Category
Tonnes (kt)
Grade (g/t Au)
Gold Metal (kOz)
Proved
636.8
1.25
25.7
Probable
602.3
1.23
23.8
Total
1,239.1
1.24
49.5
Proved
0
0.00
0
Probable
135.0
4.1
17.68
Total
135.0
4.1
17.68
TOTAL
1,374.1
1.52
67.18
Confirmation
The information in this report that relates to Horizon’s Mineral Ore Reserves is extracted from
and was originally reported in Horizon’s ASX announcements “Positive Results for Cannon
Unde