Phase 2 Drilling Extends High Grade Burbanks Mineralisation
Released
Released
Announcement PDF
Page | 1
ASX ANNOUNCEMENT
27 August 2026
PHASE 2 DRILLING CONTINUES TO EXTEND HIGH – GRADE
BURBANKS MINERALISATION
Maritana Minerals Limited (ASX: MRT) (“Maritana” or the “Company”) is pleased to provide an update following
the completion of Phase 2 drilling at its 100% owned high-grade Burbanks Gold Project, located 9km south of
Coolgardie in the Western Australian Goldfields.
HIGHLIGHTS
• Phase 2 drilling was designed to test the extents of the Burbanks Underground mineralisation beneath
the Main Lode
• Burbanks Underground is not included in the current Black Swan Processing Hub (BSPH) Life of Mine
(LOM)3
plan
• Recent assays have returned further high-grade intercepts1. Significant intervals include:
o 0.48m @ 25.19 g/t Au from 224.63m (26HBBD062)
o 0.76m @ 9.02 g/t Au from 231.42m including 0.38m @ 16.41 g/t Au from 231.42m (26HBBD062)
o 2.1m @ 3.33 g/t Au from 215m (26HBBD054)
o 3.89m @ 2.25 g/t Au from 299.11m including 2.0m @ 3.69 g/t Au from 301m and 1.0m @ 8.23
g/t Au from 307m (26HBBD056)
• Final Burbanks Phase 2 drill results expected in the current September Quarter 2026
• Burbanks’ MRE update from Phase 1 due to be completed in the current September Quarter 2026 with
Phase 2 results to be incorporated in the December Quarter 2026 MRE Update
•
Burbanks’ current JORC (2012) Mineral Resource Estimate (MRE) is 6.1Mt grading 2.4 g/t Au for 466koz2
Managing Director and CEO Mr Grant Haywood commented:
“Phase 2 drilling has successfully extended the high-grade mineralised footprint at depth below the Main Lode,
with consistent intercepts confirming continuity of the Burbanks shear. The ongoing success of the drilling
program continues to de-risk the project and enhance development potential. Burbanks Underground is firming
as a new potential source of feed for Maritana’s 100% owned Black Swan Processing Hub to enhance and
extend our existing LOM plan3
.”
1
Refer to Forward Looking and Cautionary Statements on page 10. Note Intercepts are stated as downhole intervals, and due to the vertical
nature of the ore body and restricted collar locations are commonly, but not consistently, at a low angle to the mineralisation
2
Refer to ASX Announcement “Annual Mineral Resources and Ore Reserves Statement” dated 20 August 2026
3
Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
ASX: MRT
Page | 2
Phase 2 Drilling Results
Maritana has successfully completed Phase 2 resource definition drilling at Burbanks, with assay results
reviewed and received for the first 11 drill holes of the 20 hole program. Drilling focused on an area known as
Main Lode, combining infill drilling of the current Mineral Resource and testing extensions to mineralisation.
The majority of the drill program was undertaken by collaring holes from neighbouring tenements held by Auric
Mining Ltd (through agreement) to improve intercept angles (Figure 1 & Figure 2). Phase 2 drilling comprised
20 holes for a total of approximately 6,400m and follows the initial Phase 1 drilling of 53 holes for a total of
15,798m.
Figure 1 – Burbanks plan view showing the location of the completed holes & cross section in Phase 2
Page | 3
Figure 2 - Zoomed in phase 2 drilling plan view showing the location of the completed holes & cross
section
Highlights from the 11 Phase 2 holes received to date are shown on the cover page with full results presented
in Table 1. Intercepts are stated as downhole intervals and due to the vertical nature of the orebody and
restricted collar locations, are commonly, but not consistently, at a low angle to the mineralisation (Figure 3).
Drill collar coordinate details for the program drilled to date are shown in Table 2.
These drilling results improve Maritana’s understanding of the mineralised host lithology, orebody continuity,
structural controls and the potential for extension beyond the current Global Burbanks MRE (Figure 4).
Additionally, the drilling will support the conversion of a portion of Inferred Resources to Indicated, supporting
future Ore Reserves.
Page | 4
Figure 3 – Cross section on local grid (+/- 10m) showing holes 26HBBD061, 62 & 69 and historical
drilling with the down hole gold intersections >1.0 g/t
Page | 5
Figure 4 – SW NE schematic long section on local grid showing the locations and drill traces of Phase 2 and earlier Phase 1 drillholes, the
current MRE categories, historical drillhole pierce points >1.0 g/t.
Page | 6
Next Steps
The Company will provide an update on the remaining assay results from Phase 2 drilling as they become
available, expected in the current September Quarter 2026. All assay results from the Burbanks North drilling
have been received, enabling the completion of an updated MRE. Ore Reserve studies based on the improved
confidence in resource classification from Inferred to Indicated from the updated Mineral Resource Estimate
will then follow. A future program of drilling the Burbanks South mineralisation is planned for the next quarter.
Overview – Burbanks
A two-phase extensional and infill drilling program commenced at Maritana’s 100% owned, high-grade,
Burbanks gold project in late June 2025. A revised total of approximately 25,000m drilling planned based on
results and LOM scheduling for the BSPH. Burbanks is located 9km south of Coolgardie in the world-renowned
Western Australian Goldfields (Figure 5).
Figure 5 – Maritana Minerals project locations, regional geology and surrounding infrastructure2
Page | 7
Table 1 – Significant intervals for holes 26HBBD054, 56 and 26HBBD061-064 and 26HBBD069,
previously unreported. Intercepts are down hole and not true width and were calculated based on a
sample returning an assay value of greater than 1.0 g/t Au over an interval no less than 0.2m and no
greater than 1.2m, with no more than 1m of internal dilution. Intervals are based on geology and no top
cut off was applied. No significant result is represented as NSI in the table. All other assays from the
reported drill holes were below the defined cut-off grade of 1.0 g/t Au and are not considered material
for public reporting
Hole ID From To Intercept Width Au g/t
26HBBD054 212.47 213.35 0.88 2.27
26HBBD054 215.00 217.10 2.1 3.33
26HBBD055 NSI
26HBBD056 299.11 303.00 3.89 2.25
including 301.00 303.00 2.00 3.69
26HBBD056 325.00 325.93 0.93 1.79
26HBBD056 327.58 327.88 0.30 4.25
26HBBD061 312.79 313.97 1.18 1.08
26HBBD061 315.00 316.00 1.00 1.16
26HBBD061 333.00 334.00 1.00 1.42
26HBBD061 342.00 344.00 2 1.17
26HBBD061 349.00 350 1.00 1.35
26HBBD062 224.63 225.11 0.48 25.19
26HBBD062 231.42 232.18 0.76 9.02
including 231.42 231.80 0.38 16.41
26HBBD062 234.00 238.00 4.00 1.59
including 236.18 236.66 0.48 3.41
26HBBD062 240.84 241.26 0.42 1.54
26HBBD062 242.05 242.71 0.66 4.30
26HBBD062 244.00 244.94 0.94 1.41
26HBBD063 128.15 129.00 0.85 1.06
26HBBD064 309.90 310.68 0.78 4.30
26HBBD065 NSI
26HBBD066 NSI
26HBBD068 NSI
26HBBD069 459.10 461.00 1.90 1.24
Page | 8
Table 2 – Collar location details of Phase 2 diamond holes at Burbanks, in GDA2020, Zone 51 and local
mine grid
Hole Id GDA2020
East
(m)
GDA2020
North
(m)
Local
East
(m)
Local
North
(m)
RL
(m)
Azi Dip EOH
(m)
26HBBD054 322347 6566350 1873 5702 394.0 126 -53 270.6
26HBBD055 322105 6566019 1911 5294 405.0 127 -78 486.6
26HBBD056 322376 6566327 1909 5704 393.8 127 -63 340.7
26HBBD061 322445 6566414 1904 5815 395.0 127 -63 369.6
26HBBD062 322448 6566415 1905 5817 395.0 126 -55 282.5
26HBBD063 322488 6566475 1895 5890 396.0 127 -64 363.5
26HBBD064 322508 6566533 1871 5964 399.0 127 -63 381.9
26HBBD065 322519 6566584 1846 5992 399.0 126 -64 417.8
26HBBD066 322545 6566609 1848 6028 399.3 126 -64 414.3
26HBBD068 322592 6566654 1853 6092 420.0 127 -63 315.8
26HBBD069 322362 6566504 1782 5827 400.0 130 -55 504.6
Page | 9
Table 3 – Maritana Minerals Limited – Burbanks Gold Mineral Resources2
Project Cut-off Measured Indicated Inferred Total
Au g/t Mt Au g/t Ounces Mt Au g/t Ounces Mt Au g/t Ounces Mt Au g/t Ounces
Burbanks OP 0.5 1.43 2.02 92,800 3.43 1.86 204,900 4.86 1.90 297,700
Burbanks UG 2.5/2.0 0.12 4.26 16,700 1.07 4.39 151,200 1.19 4.38 167,900
Total 1.55 2.19 109,500 4.50 2.46 356,100 6.05 2.39 465,600
*Appropriate rounding applied.
Confirmation
The information in this report that relates to Maritana’s Mineral Resources estimates is extracted from and was
originally reported in Maritana’s ASX announcement titled “Group Mineral Resource Statement – Amended”
(Burbanks, Phillips Find) 1 August 2024, which is available at www.asx.com.au. The Company confirms that it
is not aware of any new information or data that materially affects the information included in the original market
announcements and that all material assumptions and technical parameters underpinning the estimates in
those announcements continue to apply and have not materially changed. The Company confirms that the
form and context of the Competent Person’s findings in relation to those Mineral Resources estimates or Ore
Reserves estimates have not been materially modified from the original market announcements.
To the extent that this announcement contains references to prior exploration results which have been cross
referenced to previous market announcements made by the Company, unless explicitly stated, the Company
confirms that it is not aware of any new information or data that materially affects the information included in
the original market announcements.
Competent Persons Statement – Burbanks
The information in this document that relates to exploration results, geology and data compilation is based on
information compiled under the supervision and review of Mr. Stephen Guy, a Competent Person who is a
Member of The Australian Institute of Geoscientists (8203).
Mr. Guy is the Chief Geologist for Maritana Minerals, is a full-time employee of the Company and holds shares
and options in the Company. Mr. Guy has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr. Guy consents to the inclusion in this announcement of the matters based
on this information in the form and context in which it appears.
The information in the report to which this statement is attached that relates to the estimation and reporting of
global gold Mineral Resources at the Burbanks’ deposits is based on information compiled by Mr Glenn Poole,
BSc, a Competent Person and a current Member of the Australian Institute of Mining and Metallurgy. Mr Poole
is former Chief Geologist at Maritana Minerals Ltd and has sufficient experience relevant to the style of
mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Poole consents to the inclusion in the report of matters
based on his information in the form and context in which it appears.
Authorised for release by the Board of Directors.
For further information, please contact:
Grant Haywood Michael Vaughan
Managing Director and CEO Investor and Media Relations – Fivemark
grant.haywood@Maritanaminerals.com.au michael.vaughan@fivemark.com.au
+61 8 9386 9534 +61 422 602 720
Page | 10
JOIN MARITANA MINERALS INTERACTIVE HUB
Visit https://maritanaminerals.com.au/auth/signup
for Maritana Minerals’ Interactive InvestorHub
MARITANA MINERALS
Email: info@maritanaminerals.com.au
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements. They
include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward
looking statements include, but are not limited to, statements preceded by words such as “planned”,
“expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”,
“nominal”, “conceptual” and similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
as are statements about market and industry trends, which are based on interpretations of current market
conditions. Forward looking statements are provided as a general guide only and should not be relied on as a
guarantee of future performance. Forward looking statements may be affected by a range of variables that
could cause actual results to differ from estimated results and may cause the Company’s actual performance
and financial results in future periods to materially differ from any projections of future performance or results
expressed or implied by such forward looking statements. These risks and uncertainties include but are not
limited to liabilities inherent in mine development and production, geological, mining and processing technical
problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals required
in connection with mining and third party processing operations, competition for among other things, capital,
acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of
acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various
events which could disrupt operations and/or the transportation of mineral products, including labour stoppages
and severe weather conditions, the demand for and availability of transportation services, the ability to secure
adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements in relation to future matters that can only be made where the Company has a reasonable basis for
making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current ASX Listing
Rules.
The Company believes that it has a reasonable basis for making forward-looking statements in the
announcement, including with respect to any production targets and financial estimates, based on the
information contained in this and previous ASX announcements.
Cautionary statement
Statements in this report relating to the Life of Mine (LOM) pertain to the Company’s Scoping Studies which
were originally released to the ASX on 17 February 2026 and are preliminary in nature. The Scoping Studies
include Indicated and Inferred Mineral Resources and are based on low-level technical and economic
assessments, which are insufficient to support estimation of Ore Reserves. There is no certainty that the study
outcomes, including production targets and financial assumptions, will be realised. All material assumptions
and technical parameters underpinning the Scoping Study production targets and financial information
continue to apply and have not materially changed since that announcement.
Page | 11
Appendix 1 – JORC Table 1 Burbanks Project – 2026
JORC Code (2012) Table 1, Sections 1 and 2
The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition) guidelines for the reporting of Mineral Resources.
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
Sampling was conducted using Diamond Core (DD) drilling rig from surface.
Diamond drilling was used to obtain ½ NQ2 and ½ HQ core samples of various
lengths (minimum 0.2m and maximum 1.2m), from which 1-3kg of material is
collected for assaying.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Page | 12
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
DD drilling, samples were collected as half-core (NQ2 and HQ) using geological
intervals and mineralisation boundaries which is considered appropriate for this style
of mineralisation.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Field duplicates, QAQC certified reference standards and blanks were
collected/inserted at a rate of 1 in every 20m (maximum) through pre-determined
mineralised zones.
All samples were crushed and split to produce a 500g jar for Photon assay.
Sampling and QAQC procedures are carried out using Maritana protocols consistent
with industry best practice.
Drilling Techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
DD was HQ from surface changing down to NQ2 through the main zones of
mineralisation. Core was oriented every 6m where possible using an electronic
orientation tool.
Page | 13
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Drill sample recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
For DD core, recovery was measured and recorded for every metre in Micromine
Geobank for field teams or validated in Excel software
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Drilling contractors adjust their drilling approach to specific conditions to maximise
sample recovery.Core blocks were inserted by the drilling contractor and verified by
MRT geologists wherever core loss occurred. The amount of core loss was written
on the core block and during core processing/logging as well as within core
photography.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No sample recovery issues have impacted on potential sample bias.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
All drilled intervals (DD) are logged and recorded.
Data for DD core was recorded for regolith, lithology, veining, fabric (structure), grain
size, colour, sulphide presence, alteration, oxidation state, fractures, and RQD.
Maritana considers the data to be of an appropriate level of detail to support future
resource estimations.
Page | 14
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
Logging is both qualitative and quantitative in nature depending on the field being
logged.
Logging of DD core was qualitative and photographed.
DD core is stored at the Company’s core yard on-site at Burbanks.
The total length and percentage of the relevant
intersections logged.
All drillholes are logged in full from collar to end of hole with sufficient detail to meet
requirements for mineral resource estimation.
Sub-sampling
techniques and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
DD core is cut in half next to the orientation line. The right-side of the core is collected
for analysis and the left side retained for reference.
Duplicate samples were submitted at a rate of 1:20m through mineralised zones and
certified reference standards were inserted at a rate of 1:20m (maximum) through
mineralised zones based on geological interpretation.
Samples were sent to Intertek Laboratories, where they were dried and crushed to 2
mm before a 500 g split was taken for photon assay.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
No non-core drilling methods or samples were collected from the program of drilling.
Page | 15
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample type and size is considered appropriate for this type and style of
mineralisation
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Laboratory QA/QC controls during the analysis process include duplicates for
reproducibility, blank samples for contamination and standards for bias.
The laboratories used have generally demonstrated analytical accuracy at an
acceptable level within 95% confidence limits.
Laboratories also employ their own internal QA/QC protocols.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Laboratory duplicates were generated from the coarse crushed material as part of
the analytical process to monitor sample precision.
For diamond core, the core was orientated and consistently cut next to the orientation
line, with the right-hand side of the core submitted for assay. This procedure ensures
that sampling is systematic and representative of the in-situ material.
Page | 16
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The sample size is considered appropriate for this type and style of mineralisation
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
DD samples were sent to Intertek Laboratories for analysis by Photon Assay. A 500
g sample is assayed for gold by Photon Assay (method PAAU02, upper limit
350ppm) along with quality control samples including certified reference material,
blanks and duplicates. Photon method PAAU02H (upper limit 3500ppm Au) and
PAAU02HH (absolute Au) where used for samples of very high grade.
SG measurements are routinely collected using the water displacement method at
an average rate of 1 every 20m and include each lithological unit.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools or XRF instruments have been used at Burbanks.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established.
Laboratory QA/QC controls during the analysis process include duplicates for
reproducibility, blank samples for contamination and standards for bias.
The laboratories used have generally demonstrated analytical accuracy at an
acceptable level within 95% confidence limits.
Page | 17
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Verification of
sampling and assaying
The verification of significant intersections by either
independent or alternative company personnel.
All drilling and significant intersections are verified and signed off by the Chief
Geologist for Maritana Minerals who is also a Competent Person.
The use of twinned holes. No pre-determined twin holes were drilled during this program.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Geological logging was originally captured on formatted excel templates, then sent
to the company’s inhouse database manager utilising Geobank v2025.1 software for
uploading into the company database via a validation process.
Laboratory assay and downhole survey data is captured electronically.
Uploaded data is reviewed and verified by the geologist responsible for the data
collection.
Discuss any adjustment to assay data. No adjustments or calibrations were made to the assay data reported.
Page | 18
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Location of data points Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole collar locations are positioned with a hand-held GPS.
Systematically through-out, and on completion of the program and any Mineral
Resource estimation the collar locations will be surveyed by a qualified surveyor
using sophisticated DGPS with a nominal accuracy of +/- 0.05m for north, east and
RL (elevation).
The drilling rig was sited using a compass and a rig aligner used once in position to
orient the azimuth and dip prior to collaring the hole.
Down-hole surveying was completed with an IMDEX North-Seeking Gyro System. A
single shot survey was completed every 18m during the drilling of a hole. The end of
hole out surveys are validated against the end of hole in survey.
Specification of the grid system used. The grid system used to capture the data is MGA_GDA2020 Zone 51. Local grid was
used to produce sections perpendicular to the strike of mineralisation. Co-ordinates
for drill collars have been provided in both systems in Table 2.
Quality and adequacy of topographic control. Topographic control has been established using contours generated from aerial
photography and elevation model. Drill collar positions, including elevation, will be
surveyed using Differential GPS (DGPS), providing high-accuracy location data prior
to the completion of the program.
Page | 19
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results. Drillholes were located on 40 m to 100 m spaced traverses along strike and down
dip from previous drillholes.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The current drilling program is designed to infill existing data spacing in order to
improve confidence in the geological interpretation and grade continuity. The
additional data will provide greater certainty in support of an update to the existing
Mineral Resource Estimate (MRE). While the drilling results are expected to be
sufficient to establish geological and grade continuity for the targeted classification,
final adequacy will be determined during the resource estimation process.
Whether sample compositing has been applied. No physical sample compositing was undertaken; all samples were collected and
assayed at their nominal sample interval.
Length weighted composite intervals are reported in Table 1 (significant
intersections)
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
Drilling was oriented nominally perpendicular to the strike of mineralisation to achieve
unbiased sampling of structural and lithological features. However, due to the vertical
nature of the mineralisation and site access restrictions, many, but not all,
intersections are oblique to the true orientation of the mineralisation.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
Due to the vertical orientation of the mineralisation and restrictions on collar
placement, some drill holes intersect mineralised zones obliquely. This may result in
slight over-estimation of true widths at individual intersections. At the current stage
Page | 20
SECTION 1 Sampling Techniques and Data
Burbanks Project
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
considered to have introduced a sampling bias, this
should be assessed and reported if material.
of exploration, the potential sampling bias is considered minor and does not
materially affect the interpretation of geological continuity or grade.
All assay intervals are reported as downhole lengths, and true widths will be
calculated where appropr
Share your feedback