Investor Presentation - IMARC Sydney
Released
Released
Announcement PDF
2.1Moz delivering
WA’s next
+100koz pa gold
producer
IMARC – Sydney
Investor Presentation
27 October 2026
Important disclaimers
Nature of Document
This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders,
related bodies, corporate, partners, affiliates, employees, representatives or advisers, make any
representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the
material it contains. Nothing contained in the Presentation is, or may be relied upon, as a promise,
representation or warranty, whether as to the past or the future, and the Company hereby excludes all
warranties that can be excluded by law.
The Presentation
The presentation contains ‘forward-looking statements’. By their nature, forward-looking statements involve
known and unknown risks, uncertainties and other factors because they relate to events and depend on
circumstances that may or may not occur in the future, and assumptions which may or may not prove to be
correct (and may be beyond the Company’s ability to control or predict), any (or all) of which may cause the
actual results or performance of the Company to be materially different from the results or performance
expressed or implied by such forward-looking statements.
No representation is made that any forward-looking statement will come to pass, that any forecast result will
be achieved, or that any assumption on which a forward-looking statement is based is reasonable. Forward-
looking statements are made as at the date of this Presentation, and the Company disclaims any obligation or
undertaking to release any update of, or revision to, any forward-looking statement contained in this
Presentation.
Summary Information
The material contained in this Presentation is a summary and for information purposes only. The information in
this Presentation is general in nature and does not purport to be accurate nor complete, nor does it contain all
of the information that an investor may require in evaluating a possible investment in the Company, nor does it
contain all the information which would be required in a disclosure document or prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth) (Corporations Act). It has been
prepared by the Company with due care but no representation or warranty, express or implied, is provided in
relation to the accuracy, reliability, fairness or completeness of the information, opinions or conclusions in this
Presentation by the Company or any other party involved in its preparation. Reliance should not be placed on
information or opinions contained in this Presentation and, the Company does not have any obligation to
finalise, correct or update the content of this Presentation. Certain data used in this Presentation may have
been obtained from research, surveys or studies conducted by third parties, including industry or general
publications.
To the maximum extent permitted by law, the Company is not responsible for updating, nor undertakes to
update, this Presentation. It should be read in conjunction with the Company’s other periodic and continuous
disclosure announcements lodged with the ASX, which are available at
www.maritanaminerals.com.au/announcements/.
Not an offer
The information contained in the Presentation is for information purposes only. The Presentation does not
comprise a prospectus, product disclosure statement or other offering document under Australian law (and will
not be lodged with the Australian Securities and Investments Commission) or any other law. The Presentation
also does not constitute or form part of any invitation, offer for sale or subscription or any solicitation for any
offer to buy or subscribe for any securities nor shall they or any part of them form the basis of or be relied
upon in connection therewith or act as any inducement to enter into any contract or commitment with respect
to securities. In particular, the Presentation does not constitute an offer to sell or a solicitation to buy, securities
in the United States of America.
Not investment advice
The information contained in the Presentation is not investment or financial product advice and is not intended
to be used as the basis for making an investment decision. Please note that, in providing the Presentation, the
Company has not considered the objectives, financial position or needs of any particular recipient. The
information contained in the Presentation is not a substitute for detailed investigation or analysis of any
particular issue and does not purport to be all of the information that a person would need to make an
assessment of the Company or its assets. Current and potential investors should seek independent advice
before making any investment decisions in regard to the Company or its activities.
JORC Code
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in
Australia comply with the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral
Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while Ore Reserve
and Mineral Resource estimates of the Company in this presentation comply with the JORC Code (such
JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral Resources"
respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not
comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian
Securities Administrators (the "Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which
governs disclosures of mineral reserves in registration statements filed with the US Securities and Exchange
Commission. Information contained in this document describing mineral deposits may not be comparable to
similar information made public by companies subject to the reporting and disclosure requirements of
Canadian or US securities laws. You should not assume that quantities reported as “resources” will be
converted to reserves under the JORC Code or any other reporting regime or that the Company will be able to
legally and economically extract them.
Authorised for release to the ASX by the Board of Directors of Maritana Minerals Ltd.
2
Important disclaimers
Forward Looking and Cautionary Statement
As noted above, some statements in this Presentation regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”,
“may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions.
Forward looking statements, opinions and estimates included in this Presentation are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on
interpretations of current market conditions. Forward looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward looking statements may be affected by a range of variables that could
cause actual results to differ from estimated results, and may cause the Company’s actual performance and financial results in future periods to materially differ from any projections of future performance or results expressed or implied by such forward
looking statements. These risks and uncertainties include but are not limited to liabilities inherent in mine development and production, geological, mining and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations, competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of
acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various events which could disrupt operations and/or the transportation of mineral products, including labour stoppages and severe weather conditions, the
demand for and availability of transportation services, the ability to secure adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. There can be no assurance that forward looking statements will prove to be
correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements in relation to future matters that can only be made where the Company has a reasonable basis for making those statements. The
forward looking statements in this Presentation are based on current expectations, estimates, forecasts and projections about the Company and the industry in which it operates. They do, however, relate to future matters and are subject to various inherent
risks and uncertainties. Actual events or results may differ materially from the events or results expressed or implied by any forward looking statements. The past performance of the Company is no guarantee of future performance. You are cautioned not to
place undue reliance on any forward looking statement. The forward looking statements in this Presentation reflect views held only as at the date of this Presentation.
None of Maritana Minerals Limited or its directors, officers, employees, agents or contractors makes any representation or warranty (either expressed or implied) as to the accuracy or likelihood of fulfilment of any future looking statement, or any events or
results expressed or implied in any forward looking statement, except to the extent required by law. The Company believes that it has a reasonable basis for making the forward looking statements in the Presentation, including with respect to any
production targets and financial estimates, based on the information contained in this and previous ASX announcements.
Aspirational Statement
The Company’s vision to be a ~100kozpa producer in this presentation are aspirational statements (and not a production targets) and the Company does not have reasonable grounds to believe this can be achieved. These statements are of an aspiration
nature as the vision to be a ~100kozpa producer is dependent on several factors including the exploration success, ore reserves and mineral resources definition, feasibility studies and development of an extended mine plan.
Mineral Resources and Ore Reserves
This Presentation contains estimates of the Company's Mineral Resources and Ore Reserves. Refer to Slide 24 to 26. The information in this Presentation that relates to the Company’s Mineral Resources and Ore Reserves has been extracted from the
Company's previous ASX announcements including: 1. ASX Announcement “Gold Mineral Resources Update” dated 13 February 2026 and 2. ASX announcement “Gold Ore Reserve Update” dated 17 February 2026. Copies of these announcements are
available at www .asx.com.au or maritanaminerals.com.au/announcements. The Company confirms that it is not aware of any new information or data that materially affects the information included in those announcements and, in relation to the estimates
of the Company’s Mineral Resources and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the announcements continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Person's findings are presented have not been materially modified from those announcements.
Production Targets
This Presentation contains production targets and forecast financial information derived from those production targets (including in respect of all-in sustaining costs and capital costs). The information in this Presentation is underpinned by 17% Inferred and
73% Measured and Indicated Mineral Resources as detailed in the ASX Announcement "ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026. There is a low level of geological confidence
associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. The stated production targets are based on
the Company's current expectations of future results or events and should not be solely relied upon by investors when making investment decisions. Further evaluation work and appropriate studies are required to establish sufficient confidence that targets
can be achieved. The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcements relating to the Company’s published production targets. All material assumptions and
technical parameters underpinning the production targets or forecast financial information derived from production targets (as applicable) in the relevant ASX announcement continue to apply and have not materially changed.
3
Investment proposition
An attractively priced West Australian gold
developer with near-term growth potential
Esperance
Albany
Geraldton
Perth
Black Swan Processing Hub
Works underway to refurbish / convert
2.5Mtpa gold processing hub
Mineral Resource Estimate2
2.15Moz: 41.8Mt @ 1.6g/t Au
Regional Landholding
+1,300km²
Projects
20.2Moz Ag 104kt Zn
Carnarvon
Targeting +100koz p.a. production from three
production hubs1 feeding a refurbished 2.5Mtpa
Black Swan Processing Plant2
Site activities advancing with first gold production planned
in H2 CY2027
2.15Moz3 Resource with major drilling program underway
– definition & extension of mineable ounces & testing new
regional targets
Kalgoorlie
1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
2. Refer ASX Announcement “BSPH Project Update Increases Capacity to 2.5MT per annum” dated 9 June 2026
3. Refer ASX Announcements “Gold Mineral Resources & Reserves Update” dated 21 August 2026 and “Rose Hill Mineral Resource and Maiden Ore Reserve Update” dated 31 August 2026 and
“Burbanks Resource Model Update” dated 11 September 2026 4
Corporate Snapshot
An attractively priced West Australian gold developer with near-term growth potential
Directors and Management
Institutions
Golden Crane/Add New Energy
HNW, Retail and Others
Capital structure Units Current
Share price A$/sh 0.55(1)
Ordinary shares M 373.3(1)
Options and performance rights M 4.7(1)
Market capitalisation A$M 205
Cash and cash equivalents A$M 216.8(2)
Debt A$M Nil(2)
Enterprise Value A$M -11.8
EV / Resource A$/oz -5.5
1. At 20 October 2026
2. At 30 September 2026. Includes listed investments with a value of ~$6.5M
Indicative Share Register
Research Coverage
Adjusted to match share structure and volume post 15-to-1 capital consolidation effective 9 December 2025
Share Trading & Price
5
Board and Management
Deep experience in operations and value delivery
Ashok Parekh
Non-Executive Chair
Grant Haywood
Managing Director
Rob Waugh
Non-Executive Director
Warren Hallam
Non-Executive Director
Christian Price
GM Corporate
Development
Brendan Shalders
CFO & Joint CoSec
Stephen Guy
Chief Geologist
Adrianna Skok-Muir
Group Mining Engineer
Isabel Macchia
Company Secretary
6
Doug Flanagan
Project Director
Elizabeth Jones
Chief Operating
Officer
Commanding position in the WA Goldfields
• Large +1,300km2 land package within 100km of
Kalgoorlie
• 2.15Moz Group Mineral Resource1 (41.8Mt @
1.6g/t Au)
• All significant deposits remain open with
potential for growth
• 2.5Mtpa Black Swan process plant2 being
refurbished for gold production
• Hub-and-spoke operating model
• Three Key Production Hubs
• Black Swan – Northern Hub
• Kalgoorlie – Eastern Hub
• Coolgardie – Western Hub
Strategically constructed gold portfolio centered around major geological structures and infrastructure
1. Refer ASX Announcement “Gold Mineral Resources & Reserves Update” dated 21 August 2026 and “Burbanks Resource Model
Update” dated 11 September 2026
2. Refer ASX Announcement “BSPH Project Update Increases Capacity to 2.5MT per annum” dated 9 June 2026 7
Boorara S/P · Cannon UG · Golden Ridge · Crake · Coote · Jacques/Peyes
2027 – 2032 306koz
Penny’s Find UG · Kalpini
2028 – 2032 75koz
Burbanks OP · Rose Hill
2028 – 2032 165koz
+100kozpa Hub and Spoke Model
8
Three production hubs deliver 546koz recovered to Black Swan over 2027–20321
COOLGARDIE – WESTERN HUB
KALGOORLIE – EASTERN HUB
BLACK SWAN – NORTHERN HUB
64–110km
100–110km 42–48km
BLACK SWAN PROCESSING HUB
546koz recovered
1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
2. Resource remaining = 2026 hub Mineral Resource less contained ounces in mine plan (Kalgoorlie – Boorara incl. 76koz Au at Nimbus). Refer ASX Announcement “Gold Mineral Resources & Reserves
Update” dated 21 August 2026
Resource remaining2 690koz of 885koz Resource remaining2 208koz of 288koz
Resource remaining2 735koz of 1,054koz
+100kozpa Hub and Spoke Model
9
1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
Multiple ore sources in the mine plan, with additional upside through exploration success and M&A
63 59
72
55
42
11
17
18
30
42
46
12
15
12
14
26
6
4
81
92
114
111
114
29
0
20
40
60
80
100
120
2027 2028 2029 2030 2031 2032 2033
Gold
Recovered
(koz)
Kalgoorlie – Eastern Hub Coolgardie – Western Hub Black Swan – Northern Hub
Mine plan underpinned by only
~0.6Moz of the 2.15Moz resource
Gold at Boorara extends below
planned pit
Potential to add mine life beyond
2030
All significant deposits remain
open at depth
With scope to materially grow
inventory through the drill bit
Regional consolidation
opportunities
Potential to add additional sources
to feed Black Swan
Gold recovered by hub, 2027–2033: Kalgoorlie – Eastern 305.8koz · Coolgardie – Western 164.7koz · Black Swan – Northern 74.4koz · Total 545koz.
2033 reflects 3 months processing of remaining stockpiles.
Black Swan Processing Hub1
• ~50km northeast of Kalgoorlie
• Updated FEED Study1 fully utilises existing
2.5Mtpa processing capacity
• 100% of ore feed from MRT owned assets
• Plant refurbishment underway - estimated
infrastructure replacement value of +A$250M
• Plant construction risk reduced with key permits
and approvals in place
• Provides a platform for further regional
consolidation and unlocking stranded assets
• All approvals in place, construction underway
Facilitates hub and spoke operating model
1. Refer ASX Announcement “BSPH Project Update Increases Capacity to 2.5MT per annum” dated 9 June 2026
2. Refer ASX Announcement “Early Works Commence at Black Swan Processing Hub” dated 20 June 2026
PROCESSING
10
Black Swan Processing Hub
Early Works and Demolition – Complete
11
Black Swan Processing Hub
Exiting Sulphide Floatation Circuit to be retained for potential future ore processing
12
Black Swan Processing Hub
Refurbishment Phase – Underway Early Works1
13
1. Refer ASX Announcement “Early Works Commence at Black Swan Processing Hub” dated 20 June 2026
Black Swan Processing Hub
Construction Phase – Early Works1 Underway – Long lead items ordered
14
1. Refer ASX Announcement “Early Works Commence at Black Swan Processing Hub” dated 20 June 2026
Black Swan Processing Hub
Final Plant Arrangement – Gold CIL processing circuit with floatation ore processing optionality
15
Three Production Hubs
• Boorara existing stockpile 460kt (14.2koz) – a
de-risked startup
• Baseload open pit feed with supplementary
high grade underground sources
• Early mine plan underpinned by high
confidence Mineral Resources and Ore
Reserves – 60,000m of infill drilling underway1
Cash flow and future baseload open pit feed
PRODUCTION
16
1. Refer ASX Announcement “Maritana Commences Resources Conversion Drilling” dated 25 June 2026
Black Swan – Northern Hub
Plant restart, first feed from Penny’s Find and Kalpini
Kalgoorlie – Eastern Hub
Largest feed source: Boorara restart, Coote/Crake open pits
and Cannon UG
Coolgardie – Western Hub
Second baseload: Burbanks open pit and Rose Hill UG
Kalgoorlie – Eastern Hub
Largest feed source Boorara open pit restart and high-grade Cannon underground
17
GROWTH POTENTIAL
• Unscheduled resource sources: Several sources of feed
unscheduled in the mine plan, including Teal 128koz, Golden Ridge
Nth 79koz, Monument 33koz and Pinner 13koz.
• Reserve conversion: RC drilling at Coote, Crake and Boorara; 26%
of mined tonnes in the plan are Inferred.
• Nimbus: Polymetallic optionality outside the gold plan.
1,054koz
2026 Resource, gold
(10 deposits)
305.8koz
Scoping-study feed,
recovered
64–110km
Haul to the Black
Swan plant
Kalgoorlie – Eastern Hub - Boorara Project1
Initial baseload feed for the Black Swan Processing Hub
18
1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
2. Refer ASX Announcement “Boorara Mineralisation Extended Below Planned Pit’” dated 24 September 2026
Mineralisation
continues at depth2
Kalgoorlie – Eastern Hub - Boorara Project1
Mineralisation continues at depth below the existing pit1
19
1. Refer ASX Announcement “Boorara Mineralisation Extended Below Planned Pit’” dated 24 September 2026
Coolgardie – Western Hub
Second baseload feed from Burbanks open pit, supported by Rose Hill underground
20
885koz
164.7koz
2026 Resource,
gold (3 deposits)
Scoping-study
feed, recovered
100–110km
Haul to the Black
Swan plant
GROWTH POTENTIAL
• Burbanks: 755koz after a 62% (Burbanks North). Phase 2 diamond
drilling is testing Main Lode and Birthday Gift to 450m. No Reserve
as yet and no underground in the mine plan.
• Western: Phillips Find recently mined (37koz remains) and open at
depth with further potential on tenure to the north.
Burbanks Project1
Second open pit base load feed
21
1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026
Burbanks MRE Update1
Phase 1 drilling increases resource by 62% to +750koz
22
1. Refer ASX Announcement “High-Grade Burbanks Deposit Increases 62% to 750koz” dated 11 September 2026
Black Swan – Northern Hub
Processing hub restart and late-stage baseload feed from Penny’s Find and Kalpini
23
288koz
2026 Resource,
gold (5 deposits)
74.4koz
Scoping-study
feed, recovered
42–48 km
Haul to the Black
Swan plant
GROWTH POTENTIA:L
• Unscheduled resource: Gordons Dam 28koz (included in the
60,000m RC program), Capricorn 25koz and Baden Powell 23koz
on the Broad Arrow corridor under option to Dundas(ASX:DUN) with
Maritana having first right of processing.
• Near-plant exploration: ~5,000m aircore over the plant area. Plant
carries the Wilsons anomaly extension. Penny’s Find resource open
at depth.
Key Milestones and Timing
24
Pathway to gold production
Area Work Streams and Deliverables
FY 2027 FY 2028
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Development
& Growth
Burbanks MRE Update
Resource Extension & Grade Control drilling
Mining &
Operations
Open Pit Boorara Ore Stockpiling & Mining
Underground Mobilisation & Development
Underground High-Grade Ore Production
Black Swan
Processing
Hub
Final Approvals
EPC Contract Award
Black Swan Accommodation Construction
Black Swan Plant Construction
Black Swan Plant Commissioning
Black Swan Plant Gold Production
An Emerging Standalone Gold Producer
Drilling now
extending and
enhancing MRT’s
growing resource
base
Combination of
2.15Moz of Mineral
Resource1 and
processing
infrastructure
Pathway to
standalone
+100kozpa gold
production by H2
CY2027
Highly experienced
Board and
Management with
strong Goldfields
regional expertise
1. Refer ASX Announcement “Gold Mineral Resources & Reserves Update” dated 21 August 2026 and “Burbanks Resource Model Update” dated 11 September 2026 25
Contact Us
Grant Haywood
Managing Director and CEO
+61 (08) 9386 9534
info@maritanaminerals.com.au
maritanaminerals.com.au
PO Box 1064 West Perth WA 6872
Appendix
Mineral Resource1 Estimate
1. Refer ASX Announcements “Gold Mineral Resources & Reserves Update” dated 21 August 2026, “Rose Hill Mineral Resource and Maiden Ore Reserve Update” dated 31 August 2026 and “High-
Grade Burbanks Deposit Increases 62% to 750koz” dated 11 September 2026
Gold projects
.
Project Measured Indicated Inferred Total
kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz
Baden Powell 596 1.20 23 596 1.20 23
Boorara 498 1.12 18 6,231 1.27 254 2,547 1.26 103 9,276 1.26 375
Boorara SP 463 0.95 14 463 0.95 14
Burbanks OP 3,329 1.49 160 7,306 1.43 336 10,636 1.45 496
Burbanks UG 357 3.04 35 2,710 2.57 224 3,067 2.63 259
Cannon 185 4.80 29 47 2.28 3 232 4.29 32
Capricorn 659 1.20 25 659 1.20 25
Coote 2,321 0.86 64 2,321 0.86 64
Crake 1,699 1.29 70 123 1.08 4 1,822 1.28 75
Golden Ridge 476 1.82 28 52 1.71 3 527 1.81 31
Golden Ridge North 1,511 0.86 42 1,021 1.14 37 2,532 0.97 79
Gordons Dam 693 1.24 28 693 1.24 28
Jacques/Peyes 996 2.54 81 856 1.85 51 1,852 2.22 132
Monument 919 1.11 33 919 1.11 33
Phillips Find OP 325 2.41 25 180 2.11 12 505 2.30 37
Phillips Find UG 3 2.27 0.2 3 2.27 0.2
Rosehill (OP) 194 1.96 12 92 2.05 6 287 1.99 18
Rosehill (UG) 330 4.46 47 194 4.53 28 524 4.49 76
Pinner 64 1.02 2 267 1.25 11 330 1.21 13
Kalpini 1,768 2.04 116 591 1.72 33 2,359 1.96 149
Penny’s Find 305 5.19 51 123 3.02 12 429 4.57 63
Teal 1,009 1.96 64 801 2.50 64 1,811 2.20 128
Grand Total 1,156 1.20 44 18,679 1.68 1,010 22,011 1.55 1,096 41,846 1.60 2,150
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding. Burbanks OP and UG per the Burbanks Resource Model Update (September 2026), reported at 0.5g/t Au cut-off above
180mRL and 1.0g/t Au below; Burbanks OP includes Galaxias (265kt @ 1.14g/t Au for 10koz Inferred).
28
Ore Reserve1 Estimate
1. Refer ASX announcements “Gold Ore Reserve Update” dated 17 February 2026 and “Rose Hill Mineral Resource and Maiden Ore Reserve Update” dated 31 August 2026. Rose Hill UG cut-off 1.3 g/t
Au (AUD $4,500/oz gold price).
Gold projects
MARITANA MINERALS GOLD ORE RESERVE SUMMARY
Project Cutoff Proven Probable Total
Au ppm kt Au g/t Koz kt Au g/t Koz kt Au g/t Koz
Boorara 0.5 247 1.10 9.1 1,445 1.40 62.7 1,691 1.36 71.8
Cannon UG 1.0 135 4.10 17.7 135 4.10 17.7
Penny's Find UG 1.5 328 3.20 33.4 328 3.20 33.4
Kalpini 0.5 867 1.69 47.2 867 1.69 47.2
Crake 0.5 870 1.23 34.4 870 1.23 34.4
Rose Hill UG 1.3 70 2.14 4.7 350 2.37 26.8 420 2.34 31.6
TOTAL 316 1.33 13.7 3,994 1.75 221.9 4,310 1.72 235.6
29
Mineral Resource1 Estimate
1. Refer ASX Announcement “Group Mineral Resources Statement – Amended” dated 1 August 2024
Nimbus silver-zinc project
Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au)
Category Mt Ag (g/t) Au (g/t) Zn (%) Ag (Moz) Au (kt) Zn (kt)
Measured Resource 3.62 102 0.09 1.2 11.9 10 45
Indicated Resource 3.18 48 0.21 1.0 4.9 21 30
Inferred Resource 5.28 20 0.27 0.5 3.4 46 29
Total Resource 12.08 52 0.20 0.9 20.2 77 104
Nimbus high grade silver zinc resource (500g/t Ag bottom cut and 2,800g/t Ag top cut)
Category Mt Ag (g/t) Zn (%) Ag (Moz) Zn (kt)
Measured Resource - - - - -
Indicated Resource 0.17 762 12.8 4.2 22
Inferred Resource 0.09 797 13.0 2.2 11
Total Resource 0.26 774 12.8 6.4 33
30